A scheme has been proposed, modeled and simulated to show an improved system efficiency, battery life and payback period of a 340 kWp peak power grid interactive solar photovoltaic system. In this case, a conventional solar photovoltaic system capable to fulfill 66% energy demands has been modified to meet complete energy demands without an increase in system’s photovoltaic capacity. It has been shown via modelling and simulation on PVSyst that using direct current appliances instead of alternating current appliances, initial power demands are reduced by 58% and conversion losses (DC–AC–DC) of 9.6% are eliminated. These modifications result in an overall increase in the system’s performance ratio from 73.8 to 83.4%, with an increase in energy production from 469.6 to 557.9 MWh. As an outcome, battery life is increased by 1200 duty cycles as the depth of discharge is reduced from 35 to 26%.

Keywords

Solar photovoltaic Performance ratio Battery life Converter losses 

Introduction

Evidently, over the last decade, a sustained and progressive growth in the development and adoption of solar systems has been observed [1] and relatively an increasing public interest and the advancement in the efficient and cost-effective solar technology as concerns over grid failure and the depletion natural resources have intensified [2]. Solar photovoltaic (PV) has emerged as a potential resource for addition and supplementation of grid power capacity [3, 4]. Net-metered PV power systems [5], which have dominated on-site renewable energy supply in the buildings sector, are a direct current (DC) power source, as are batteries, which are the dominant energy storage technology used with such systems [6]. A number of factors are driving the recent shift in the interest of using DC power from solar electric systems in its DC form directly [7], to power electricity loads in buildings, rather than converting it to alternating current (AC) first, as is the current practice [8].

Technology advancements have profoundly triggered an important factor that favors the use of DC, the reason being that the electric appliances that operate internally on DC are increasing more rapidly, and the fact that these new DC-internal technologies tend to be more efficient than their AC counterparts especially fans and light-emitting diodes (LEDs) [9]. Technically, this supports the idea that energy savings could be achieved by directly coupling DC power sources with DC appliances [10], thus avoiding DC–AC–DC power conversion losses and resultantly, an accompanied efficiency increase can be achieved [11]. Recent demonstrations experimented with commercial data centers have shown that considerable energy savings can be achieved with DC power distribution supplied directly to DC loads, rather than utilizing AC power [12, 13].

In support of the undersigned research paper, a real-time-based modeling of a PV solar-powered system is configured, which is an integral part for the development of a complete grid interactive solar photovoltaic (GISP) simulation model where converter losses have been minimized and performance ratio of the PV system has been maximized using DC as a primary source. Technically, the process is achieved by integrating the DC power directly with the load keeping it independent from the DC–AC converters. In this case, the relative energy savings of ‘direct-DC’ power for loads which have primarily day time usage only are also assessed. Among several PV modelling software [14, 15], one of the most common is PVSyst (See website: http://www.pvsyst.com). Over the years, this software application has been widely used for PV modelling [16] and sizing the components of the PV system [17, 18] or PV system assessment [19]. In connection with this paper, a solar power system is modeled and simulated in PVSyst. The results obtained after performing the simulations clearly show that the system performance ratio has improved and the overall cost of the installed system has reduced after eliminating DC–AC converters.

System description

Schematic diagram for existing system

As a demonstration, the schematic diagram for the system under consideration is shown in Fig. 1. For the operational purpose, inverter is utilized as a major component of the system to run the connected load by converting DC energy from PV modules to AC energy. During cloudy days or at night, the inverter uses grid to run the load and at the same time charging the batteries. On account of frequent load shedding and worse grid conditions (frequent low grid voltage, electrical transients and surges), AC–DC–AC conversion is used. Consequently, this also ensures the real-time energy sharing between the grid and the PV plant at the same time improving the power quality at output.
Fig. 1

Existing solar power system schematic diagram

Existing system components

The complete PV system consists of solar PV modules (DC power generator), inverters (DC–AC conversion) with built-in charge controller (DC–DC conversion) and batteries for energy storage purpose. The technical specifications of different system components being used which include Yingli Solar, YL255P-29B YGE 60 cell 40 mm series PV modules, Zigor HIT3C Inverters and SOPzS lead acid batteries [20] are shown in Tables 1, 2 and 3, respectively.
Table 1

Specifications of PV modules

Parameters

Specification

Rating

Type of module

Polycrystalline

1332 no.

Individual power

Unit norm power

255 Wp

Array global power

Nominal (STC)

339.6 kWp

In series

18

No. of PV modules

In parallel (strings)

74

Array operating characteristics (50 °C)

U mpp

540 V

I mpp

8.28 A

Table 2

Specifications of inverter

Parameters

Subjects

Rating

Input data

Recommended DC power

Greater than 157 kWp

MPPT voltage range

420–700 V DC

Input current

375 A DC

Battery charging capacity

200 A

Output data

Nominal output power

300 kW (150 kW × 2)

Nominal frequency

50 Hz

Power factor

> 0.99 at full load

Voltage distortion at full load

< 3%

General data

Max power efficiency including transformer

> 96%

MPPT efficiency

99%

Internal consumption in operation

< 1% at full load

Table 3

Specifications of batteries

Parameter

Specification

Rating

Type of battery

SOPzS tubular plated

348 no.

Individual capacity

Capacity at C10 rating

1525 AH

Voltage

Nominal voltage

2 V

 

In series

174

No. of batteries

In parallel

2

General characteristics

Duty cycles at 50% DOD

2500

Electrolyte

Sulphuric acid with density 1.24 kg/dm3

Schematic diagram of the proposed system

The part of the schematic diagram marked in Fig. 2 highlights the improvement being proposed to the existing solar system increasing system efficiency by ensuring maximum direct utilization of DC power generated by PV modules. Power converter losses occurring due to DC to AC conversion are minimized, enhancing the overall performance ratio of the solar plant.
Fig. 2

Proposed solar power system schematic diagram

Proposed system components

Table 4 below shows the modifications made to the existing system and the additional components added altogether.
Table 4

Proposed modifications to the existing system

Parameter

Specification

Rating

DC voltage regulator

DC/DC converter capable of power handling up to 50 kW

6 no.

DC fans and lights

48 V energy-efficient DC fans and LED lights

Total capacity 175 kW

Load profile

Existing system

The complete load demands for the facility are shown in Table 5. The total accumulated load of the facility is 425 kW.
Table 5

Existing AC load for the facility

Load description

Power (kW)

Fans and lights

350

Air conditioners

40

Water pumps

27

Refrigeration

8

Total

425

Table 6 shows only the essential load estimating around 280 kW has been connected and supported by solar system. While segregating the 280 kW solar connected load, the operational hours of 220 kW day-time load are from 08:00 to 15:00 h, whereas the working hours of 60 kW load operating during night are from 16:00 to 08:00 h.
Table 6

Distribution of AC load for the facility

Distribution of AC load

Power (kW)

AC load connected and powered by solar system

280

AC load running on diesel genset

145

Maximum AC load running on solar system at day time

220

Maximum AC load running on solar system at night time

60

Table 7 provides details of the load shedding, sunshine and grid availability hours in a single day. Considering the present local scenario, there are approximately 6 h of load shedding in one single complete day. Taking into account multiple factors which include frequent grid failures or non-availability occurring at random times during the day and availability of 8 h of daily sunshine, all the calculations for the battery usage are made for only 10 h of grid utilization. Since the main objective is to reduce dependency on National Grid, the system has been designed not to use grid during the day time and also ensuring maximum 35% Depth of Discharge (DOD) for the batteries at the same time.
Table 7

Load shedding, grid and sunshine hours in 1 day

Description

Hours

Daily load shedding (average)

6

Daily sunshine hours available

8

Daily grid usage

10

Proposed system

Retrofitting concept has been implemented for the proposed system, while replacing AC load appliances of the complete facility with energy-efficient DC load appliances, i.e. lighting and fan load, which would reduce the overall load by 50%, i.e. from 350 to 175 kW. The AC inductive load estimated around 75 kW remains independent. The load demands have been distinctly altered for the proposed system as shown in Table 8. The load operated during the day time is reduced to 210 kW (accumulating 135 kW of lighting and fans load through retrofitting of AC appliances with DC appliances and 75 kW of inductive load) which operates from 08:00 to 15:00 h daily and the load operated during night time is reduced to 40 kW having working hours from 16:00 to 08:00 h while completely eliminating the use of diesel generator.
Table 8

Load profile for the proposed system

Description

Power (kW)

Total rated load of the facility (after retrofitting AC appliances with DC)

250

New lighting and fans load (DC)

175

AC inductive load

75

Load connected/shifted to solar system

250

Load running on diesel genset

0

Following equation (Eq. 1) is applied to calculate the depth of discharge (DOD) for the batteries in the proposed system:
$${\text{DOD}} = \frac{W \times B}{{V \times {\text{AH}}}}$$
(1)
where DOD is the depth of discharge, W load in watts, B battery backup hours, V system voltage, and AH is the capacity of battery.
The number of PV modules required to charge batteries during the day is calculated using Eq. 2. This would help to determine the most appropriate value for the DOD of the batteries for a given Solar PV system:
$$N = \,\frac{{{\text{AH}}\, \times \,V \times \,E}}{{{\text{DOD}} \times \,S \times \,P}}\,$$
(2)
where N is the no. of panels required, E efficiency of solar PV module at NOCT (nominal operating cell temperature), S number of sun shine hours, and P panel wattage at NOCT.

Efficiency of the solar PV module is considered at NOCT specifications mentioned, which signifies the realistic value of the PV module performance in real-time conditions, whereas SH are taken as the yearly average sunshine hours present in Pakistan in one single day. In the proposed system, DOD is reduced from 35 to 26% which specifically indicates that the battery usage is reduced.

Battery discharge behaviour

Existing system

The overall energy production and consumption along with the detailed battery discharge statistics for consecutive 3 days of the existing solar system is given in Table 9. Grid is used for 10 h per day to meet the complete energy demands of the connected load on solar system. The maximum battery DOD for the existing system is 35%.
Table 9

Energy consumption for 3 days for the existing system

The graph in Fig. 3 shows the energy produced and consumed by the existing system in a single day. It explains the hourly status of actual energy generation from the Solar Array, the optimum energy consumption (hours) and energy variance to/from battery.
Fig. 3

Overall energy generation and consumption pattern for the existing system

The graph in Fig. 4 shows the maximum DOD achieved by the battery bank. It demonstrates the hourly status of percentage discharge of the battery bank based on a 24-h cycle of system operation. The graph shows that the battery is being used up to 35% depth of discharge. The operational timing has been assumed based on standard operations (working hours) as mentioned above.
Fig. 4

Maximum battery bank discharge for the existing system

Figure 5 illustrates the hourly status of the battery bank available and the battery bank consumed based on the 24-h cycle of system operation for the existing system. It shows that the battery bank is still 65% full.
Fig. 5

Battery bank status for the existing system

Proposed system

The overall energy production and consumption along with the detailed battery discharge statistics for 3 consecutive days of the proposed solar system is given in Table 10. It can be clearly seen that the grid usage has been reduced to 6 h per day to meet the complete energy demands of the connected load on solar system. The maximum battery DOD for the proposed system also reduces to 26% ensuring increase in battery life.
Table 10

Energy consumption for 3 days for the proposed system

The graph in Fig. 6 demonstrates the energy produced and consumed by the proposed system in a single day. It explains the hourly status of actual energy generation from the Solar Array, the optimum energy consumption (hours) and energy variation to/from battery.
Fig. 6

Overall energy generation and consumption pattern for the proposed system

The graph in Fig. 7 confirms the maximum DOD achieved by the battery bank. It demonstrates the hourly status of percentage discharge of the battery bank based on a 24-h cycle of system operation. The graph shows that the battery is being used up to 26% depth of discharge. The operational timing has been assumed based on standard operations (working hours) as mentioned above.
Fig. 7

Maximum battery bank discharge for the existing system

Figure 8 shows the hourly status of the battery bank available and the battery bank consumed based on the 24-h cycle of system operation for the proposed system. It shows that the battery bank is still 74% full.
Fig. 8

Battery bank status for the proposed system

System simulation

Figure 9 shows the flow diagram for the proposed system. These parameters have been used to run the simulations for the proposed system in the PVSyst software. The regulator has the tendency to charge the batteries and run the load from both PV array, grid and generator, thus ensuring the reliable working of the system and increasing the robustness of the overall system [21]. The remaining AC inductive load runs on the already-installed inverters.
Fig. 9

Flow diagram for the proposed system

PVsyst software V5.55 is used to run the computer simulations to evaluate the performance of the solar power plant.

Existing system

While running the simulations, the solar modules are placed at the south facing with 0° angle of azimuth. The modules are tilted at an angle of 30° with the horizontal. The mounting structure is kept fixed which significantly reduces the initial and maintenance cost of the overall solar power plant as it eliminates the rotating and moving parts. Due to fixed structure, best average tilt angle of 30° is used which can yield maximum production throughout the year [22]. Figure 10 shows the simulation results of normalized production and performance ratio for the existing system. The PV plant is producing 3.79 kWh of energy per peak watt per day on average basis in a year working at performance ratio of 73.8% over the year including cloudy, foggy and rainy days.
Fig. 10

Normalized production and performance ratio for existing system

Table 11 shows the energy produced per month by the PV plant for its first-year operation at different irradiation and temperature levels. Solar system is producing 469.56 MWh of useful energy after calculating all the losses based on average horizontal global irradiance of 1720 kWh/m2 and ambient temperature of 24.12 °C in 1 year.
Table 11

Relative production for the existing system

Balances and main results

 

GlobHor kWh/m2

T Amb (°C)

Globlnc (kWh/m2)

GlobEff (kWh/m2)

EArray (MWh)

E_Grid (MWh)

EffArrR (%)

EffSysR (%)

January

89.0

12.70

123.4

119.9

35.47

33.43

12.04

11.35

February

111.0

15.00

142.4

138.6

39.80

37.55

11.71

11.05

March

153.0

20.00

172.8

167.8

46.96

44.31

11.39

10.74

April

167.0

26.10

169.4

164.3

44.28

41.76

10.95

10.33

May

190.0

30.90

176.3

170.4

44.95

42.33

10.69

10.06

June

191.0

33.30

170.4

164.5

43.00

40.49

10.57

9.95

July

171.0

32.00

157.0

151.6

40.34

37.94

10.76

10.12

August

172.0

31.10

167.1

161.8

42.84

40.37

10.74

10.12

September

163.0

29.60

176.9

171.7

45.67

43.11

10.81

10.21

October

130.0

25.20

158.1

153.5

42.40

40.01

11.24

10.61

November

97.0

18.80

131.9

128.3

36.63

34.58

11.64

10.98

December

86.0

14.20

126.4

122.8

35.74

33.68

11.84

11.16

Year

1720.0

24.12

1872.2

1815.2

498.08

469.56

11.15

10.51

GlobHor horizontal global irradiation, T Amb ambient temperature, Globlnc global incident in coll. plane, GlobEff effective global, corr. for IAM and shadings, EArray effective energy at the output of the array, E_Grid energy injected into grid, EffArrR effic. Eout array/rough area, EffSysR effic. Eout system/rough area

Figure 11 is the detailed analysis of the losses present in the existing solar system. Only 35% of energy from the PV modules is directly used whereas 65% of energy is used after being accumulated in batteries. This accounts for the significant losses in the system up to 8.6% in the form of battery efficiency loss, gassing current (electrolyte dissociation) and battery self-discharge currents.
Fig. 11

Loss diagram for the first year for the existing system

Proposed system

Figure 12 shows the simulation results of normalized production and performance ratio for the proposed system. The PV plant is producing 4.5 kWh of energy per peak watt per day on average basis in a year working at performance ratio of 83.4% over the year including cloudy, foggy and rainy days.
Fig. 12

Normalized production and performance ratio

Table 12 shows the energy produced per month by the PV plant for its first-year operation at different irradiation and temperature levels. Solar system is producing 557.90 MWh of useful energy after calculating all the losses based on average horizontal global irradiance of 1720 kWh/m2 and ambient temperature of 24.12 °C in 1 year.
Table 12

Relative production for the proposed system

Atchison College Lahore

Balances and main results

 

GlobHor (kWh/m2)

T Amb (°C)

Globlnc (KWh/m2)

GlobEff (kWh/m2)

EArray (MWh)

E_Grid (MWh)

EffArrR (%)

EffSysR (%)

January

89.0

12.70

136.1

132.0

43.54

41.29

13.41

12.71

February

111.0

15.00

154.7

150.0

48.63

46.13

13.17

12.49

March

153.0

20.00

183.0

176.5

56.03

53.16

12.83

12.17

April

167.0

26.10

175.2

168.3

51.70

49.02

12.36

11.72

May

190.0

30.90

178.4

170.0

50.91

48.21

11.96

11.33

June

191.0

33.30

170.8

162.3

48.08

45.52

11.80

11.17

July

171.0

32.00

158.9

151.6

45.31

42.87

11.95

11.30

August

172.0

31.10

171.2

163.9

49.20

46.64

12.04

11.41

September

163.0

29.60

185.7

178.7

54.22

51.46

12.24

11.61

October

130.0

25.20

170.0

164.4

51.26

48.65

12.63

11.99

November

97.0

18.80

144.9

140.6

45.01

42.73

13.02

12.36

December

86.0

14.20

140.6

136.5

44.52

42.22

13.26

12.58

Year

1720.0

24.12

1969.5

1894.7

588.42

557.90

12.52

11.87

GlobHor horizontal global irradiation, T Amb ambient temperature, Globlnc global incident in coll. plane, GlobEff effective global, corr. for IAM and shadings, EArray effective energy at the output of the array, E_Grid energy injected into grid, EffArrR effic. Eoutarray/rough area, EffSysR effic. Eout system/rough area

Figure 14 shows the detailed analysis of the losses present in the proposed solar system. It shows that after retrofitting of AC appliances with DC appliances the significant losses associated with the batteries in the form of efficiency loss, gassing current (electrolyte dissociation) and battery self-discharge current have been eliminated resulting in an increase in performance ratio and energy generation of the system.

The loss diagram for the PV system after modifications and upgrading the existing system shows that 557.9 MWh is the useful energy available after calculating all the losses. There is 88.9 MWh increase in the units produced. The loss diagram in Fig. 13 shows that the overall battery efficiency losses for the complete system are 9.6% out of which 3.1% are due to gassing current which is also defined as electrolytic dissociation and 0.2% due to battery self-discharge current [23]. These losses due to battery DC–AC conversion have been eliminated in the new system resulting in improved efficiency by 9.6%.
Fig. 13

Loss diagram for the first year

Results and discussion

The performance ratio improvement and energy production attained for each respective month for the given irradiance data for both existing and proposed solar system are given in Table 13. The existing solar system working on performance ratio of 73.80% produces 469.56 kWh units and the proposed system working on 83.40% efficiency can produce 557.9 MWh of energy in one complete year.
Table 13

Month-wise improvement of PR and kWh

Month

Horizontal global irradiation (kWh/m2)

Existing system

New system

PR

Energy (kWh)

PR

Energy (kWh)

Jan

88.99

79.52

33.43

87.99

41.29

Feb

110.99

77.26

37.55

86.06

46.13

Mar

152.87

75.23

44.31

83.99

53.16

Apr

166.98

72.53

41.76

81.19

49.02

May

190.03

70.95

42.33

79.27

48.21

Jun

191.05

70.29

40.49

78.47

45.52

Jul

170.97

71.57

37.94

79.56

42.87

Aug

172.05

71.35

40.37

79.67

46.64

Sep

163.09

71.77

43.11

80.37

51.46

Oct

130.12

74.52

40.01

83.01

48.65

Nov

97.01

77.08

34.58

85.54

42.73

Dec

85.91

78.19

33.68

86.75

42.22

Total

1720 kWh/m2

73.80%

469.56

83.40%

557.9

The month-wise performance ratio trend for the first year of the existing and the proposed system can be observed in Fig. 14. The trend shows an increase of 9.6% over the year.
Fig. 14

Performance ratio graph for the first year

The increased production of energy in the new system due to increased efficiency of the system is presented in Fig. 15.
Fig. 15

Energy production graph for the first year

The computer simulation results show that efficiency of the system can be improved by 9.6% for its day time usage when solar is being directly utilized by the load. These 9.6% are the minimum losses which are associated with DC–AC–DC convertor losses. These losses can be minimized by direct utilization of DC power. As a result, the overall performance ratio of the system can be increased from 73.8 to 83.4%. For the remaining AC load of 75 kW, the normal DC–AC conversion is applicable. The solar modules installed can produce 557.9 MWh of electricity units annually, whereas existing system produces only 469 MWh. The system which previously provides power to only 66.66% of total load can now run the complete 100% load at the same time reducing daily grid usage from 10 to 6 h and completely eliminating the use of diesel generator. The battery life is also enhanced as the number of battery cycles increases from 3800 to 5000 due to reduction of DOD from 35 to 26%.

Conclusions

By replacing traditional AC appliances with energy-efficient DC appliances in the existing solar system, load is reduced by 58% of total load, i.e. from 425 to 250 kW. Further, by ensuring direct utilization of DC power to run DC appliances, DC–AC–DC power converter losses for 70% load are reduced by 9.6%. For the remaining 30% load, the efficiency stays the same as a conventional hybrid system. Hence, efficiency improvement for 70% load results in a much quicker payback time due to improvement of performance ratio to 83.4% for the overall system. 340 kWp of PV which previously provide power to only 66.66% load can now run the 100% load. Further, implementing this technique ensures uninterrupted power supply to the complete load at much lesser rate. It also ensures the use of generator to the minimum extent. The overall life of the batteries is also prolonged due to direct utilization feature resulting in increased duty cycles, reduced operation and maintenance expense over the plant life cycle of 25 years.

Notes

Compliance with ethical standards

Conflict of interest

We declare that the manuscript has not been published before nor submitted to another journal for the consideration of publication. It is the sole work and property of all the mentioned authors and there is no conflict of interest with anyone.

References

  1. 1.
    Sampaio, P.G.V., González, M.O.A.: Renew. Sustain. Energy Rev. 74, 590 (2017)CrossRefGoogle Scholar
  2. 2.
    Manju, S., Sagar, N.: Renew. Sustain. Energy Rev. 70, 298 (2017)CrossRefGoogle Scholar
  3. 3.
    Mueller, S.: Next Generation Wind and Solar Power, from Cost to Value. International Energy Agency, Paris (2016)Google Scholar
  4. 4.
    Murphy, F., McDonnell, K.: MDPI Sustain. 9, 302 (2017)CrossRefGoogle Scholar
  5. 5.
    Darghouth, N.R., Wiser, R.H., Barbose, G., Mills, A.D.: Appl. Energy 162, 713 (2016)CrossRefGoogle Scholar
  6. 6.
    Kempener, R., Borden, E.: Battery Storage for Renewables: Market Status and Technology Outlook, p. 32. International Renewable Energy Agency, Abu Dhabi (2015)Google Scholar
  7. 7.
    Rauf, S., Wahab, A., Rizwan, M., Khan, N.: In application of dc-grid for efficient use of solar PV system in smart grid. In: Shakshuki, E. (ed.) Procedia Computer Science, Proceedings of the 6th International Conference on Sustainable Energy Information Technology, Madrid, 23–26 May 2016, pp. 902–906 (2016)Google Scholar
  8. 8.
    Obi, M., Bass, R.: Renew. Sustain. Energy Rev. 58, 1082 (2016)CrossRefGoogle Scholar
  9. 9.
    Lucía, Ó., Cvetkovic, I., Sarnago, H., Boroyevich, D., Mattavelli, P., Lee, F.C.: IEEE J. Emerg. Sel. Top. Power Electron. 1, 315 (2013)CrossRefGoogle Scholar
  10. 10.
    Vossos, V., Garbesi, K., Shen, H.: Energy Build. 68, 223 (2014)CrossRefGoogle Scholar
  11. 11.
    Kim, Youngjin: Energies 10, 427 (2017)CrossRefGoogle Scholar
  12. 12.
    Garbesi, K., Vossos, V., Shen, H., Taylor, J., Burch, G.: Catalog of DC Appliances and Power Systems. Berkeley National Laboratory in association with the US Department of Energy, Berkeley (2011)Google Scholar
  13. 13.
    Dastgeer, F., Gelani, H.E.: Energy Build. 138, 648 (2017)CrossRefGoogle Scholar
  14. 14.
    Crawley, D.B., Hand, J.W., Kummert, M., Griffith, B.T.: Contrasting the capabilities of building energy performance simulation programs. Build. Environ. 43(4), 661–673 (2008)CrossRefGoogle Scholar
  15. 15.
    Sinha, S., Chandel, S.S.: Review of software tools for hybrid renewable energy systems. Renew. Sustain. Energy Rev. 32, 192–205 (2014)CrossRefGoogle Scholar
  16. 16.
    Sauer, K.J., Roessler, T., Hansen, C.W.: Modeling the irradiance and temperature dependence of photovoltaic modules in PVsyst. IEEE J. Photovolt. 5(1), 152–158 (2015)CrossRefGoogle Scholar
  17. 17.
    Faranda, R.S., Hafezi, H., Leva, S., Mussetta, M., Ogliari, E.: The optimum PV plant for a given solar DC/AC converter. Energies 8(6), 4853–4870 (2015)CrossRefGoogle Scholar
  18. 18.
    Dolara, A., et al.: Performance analysis of a single-axis tracking PV system. IEEE J. Photovolt. 2(4), 524–531 (2012)CrossRefGoogle Scholar
  19. 19.
    Mermoud, A., Lejeune, T.: Performance assessment of a simulation model for PV modules of any available technology. 25th Eur. PV Sol. Energy Conf., pp. 6–10 (2010)Google Scholar
  20. 20.
    Manimekalai, P., Harikumar, R., Raghavan, S.: Int. J. Comput. Appl. 82, 29 (2013)Google Scholar
  21. 21.
    Cetin, E., Yilanci, A., Ozturk, H.K., Colak, M., Kasikci, I., Iplikci, S.: Energy Build. 42, 1344 (2010)CrossRefGoogle Scholar
  22. 22.
    Perez, R., Ineichen, P., Seals, R.: Solar Energy 44, 271 (1990)CrossRefGoogle Scholar
  23. 23.
    Moslehi, K.: IEEE Trans. 1(1), 57 (2014)MathSciNetGoogle Scholar

Copyright information

© The Author(s) 2018

Open AccessThis article is distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution, and reproduction in any medium, provided you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license, and indicate if changes were made.

Authors and Affiliations

  1. 1.Center for Energy Research and DevelopmentUniversity of Engineering and Technology Lahore (UET Lahore)LahorePakistan
  2. 2.Faculty of Information TechnologyUniversity of Central PunjabPunjabPakistan

Personalised recommendations