Observability Study of the Circuit Variables in the Dry Tailing Processing (DTP) of Golegohar Iron Processing Plant Using Linear and Bilinear Methods

  • Research Article - Chemical Engineering
  • Published:
Arabian Journal for Science and Engineering Aims and scope Submit manuscript

Abstract

To carry out metallurgical and economic calculations as well as plant control, mass balance for mineral processing circuits is a very important and fundamental issue. For this purpose, sufficient and correct data from mineral processing circuits are necessary. On the other hand, due to economic or technical reasons, measurement or sampling from all of circuits is not possible. In this paper, regarding the measurement or sampling system that has been installed in the mineral processing circuit, a basic cycle matrix method was used for the determination of observable and unobservable variables in the mineral processing circuit. Also, two new methods including linear and bilinear methods were used for calculation of observable variables. These methods have been used in the case study related to dry tailing processing of the Golegohar iron processing plant.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Wiegel R.L.: Advance in mineral processing material balances. Can. Metall. Q. 11, 413–424 (1972)

    Article  Google Scholar 

  2. Smith H.W., Ichiyen N.M.: Computer adjustment of metallurgical balances. CIM Bull. 66, 97–100 (1973)

    Google Scholar 

  3. Hodouin D., Kasango T., Kouame E., Everell M.D.: Bilmat-An algorithm for material balancing mineral processing circuits-Applications to comminution, desliming and flotation circuits. CIM Bull. 74, 123–131 (1981)

    Google Scholar 

  4. Hodouin D., Flament F., Bazin C.: Reliability of material balance calculations—a sensitivity approach. Miner. Eng. 2, 157–170 (1989)

    Article  Google Scholar 

  5. Hodouin D., Macgergor J.F., Hou M., Franklin M.: Multivariate statistical analysis of mineral processing plant data. CIM Bull. 86, 23–34 (1993)

    Google Scholar 

  6. Cimon, D.; Barbery, G.; Flament, F.; Hodouin, D.: Materials balance in gold processing plants. Proc. Gold Metal. Int. Symp. 9–21 (1987)

  7. Bazin C., Franklin M.: Real-time material balance for flotation plants using a least squares recursive algorithm. Int. J. Miner. Process. 46, 231–244 (1996)

    Article  Google Scholar 

  8. Hodouin D., Gelpe T., Everell M.D.: Sensitivity analysis of material balance calculations- an application to a cement clinker grinding circuit. Powder Technol. 3, 139–153 (1982)

    Article  Google Scholar 

  9. Makni, S.; Hodouin, D.; Bazin, C.: On-line data reconciliation by minimization of a weighted sum of squared residuals and node imbalances. In: Proceedings of the XIX International Minereral Processing Conference, San Francisco, USA (1995)

  10. Hodouin D., Everell M.D.: A hierarchical procedure for adjustment and material balancing of mineral process data. Int. J. Miner. Process. 7, 91–116 (1980)

    Article  Google Scholar 

  11. Hodouin, D.; Makni, S.: Data reconciliation for stationary multi-phase multi-stream metallurgical processes. Accepted for presentation at the IFAC–MMM Symposium, Düsseldorf (1998)

  12. Hodouin D., Mirabedini A., Makni S., Bazin C.: Reconciliation of mineral processing data containing correlated measurement errors. Int. J. Miner. Process. 54, 201–215 (1998)

    Article  Google Scholar 

  13. Mandel D., Abdollahzadeh A., Maquin D., Ragot J.: Data reconciliation by inequality balance equilibration: a LMI approach. Int. J. Miner. Process. 53, 157–168 (1998)

    Article  Google Scholar 

  14. Bazin C., Hodouin D., Zouadi M.: Data reconciliation and equilibrium constant estimation: application to copper solvent extraction. Hydrometallurgy 80, 43–53 (2005)

    Article  Google Scholar 

  15. Andrade Lima L.R.P.: Nonlinear data reconciliation in gold processing plants. Miner. Eng. 19, 938–951 (2006)

    Article  Google Scholar 

  16. Alhaj Dibo M., Maquin D., Ragot J.: Data reconciliation: a robust approach using a contaminated distribution. Control Eng. Pract. 16, 159–170 (2008)

    Article  Google Scholar 

  17. Vasebi A., Poulin E., Hodouin D.: Dynamic data reconciliation in mineral and metallurgical plants. Annu. Rev. Control 36, 235–243 (2012)

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Mehdi Rahimi.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Rahimi, M., Abdollahzadeh, A. & Rezai, B. Observability Study of the Circuit Variables in the Dry Tailing Processing (DTP) of Golegohar Iron Processing Plant Using Linear and Bilinear Methods. Arab J Sci Eng 39, 5847–5859 (2014). https://doi.org/10.1007/s13369-014-1177-5

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s13369-014-1177-5

Keywords

Navigation