Skip to main content

Table 7 Profit detail calculation after optimization

From: Optimization of operating conditions of CO2-enhanced gas recovery and carbon sequestration

ParameterKWAGADAPSORWA
Income from CH4 (USD/day)7.1396.8697.1396.97.139
Income from condensate (USD/day)13,947.713,421.34213,947.713,481.04113,947.7
CO2 procurement cost (USD/day)839.333820.532839.333839.333839.333
CO2 separation cost (USD/day)203.656199.094203.656203.656203.656
Pump cost (USD/day)577.165556.338577.165576.026577.165
Profit (USD/day)12,334.68511,852.24712,334.68511,868.38612,334.685