Skip to main content
Log in

Long-term scheduling of hydro-thermal power systems using scenario fans

  • Original Paper
  • Published:
Energy Systems Aims and scope Submit manuscript

Abstract

This paper presents a method for solving the long-term multireservoir hydro-thermal scheduling problem based on stochastic linear programming. Decisions for each week are determined by solving a two-stage stochastic linear programming problem, where reservoir inflow stochasticity for future weeks is represented as a fan of historical inflow records. The overall scheduling problem is then solved as a sequence of such problems. The method is tested on a data set for the Nordic power system, and its performance—in terms of socio-economic surplus, reservoir handling and computation time—is compared with a well established model for solving the identical problem.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Botnen, O.J., Johannesen, A., Haugstad, A., Kroken, S., Frøystein, O.: Modelling of hydropower scheduling in a national/international context. In: Brock, E., Lysne, D. (eds.) Hydropower 92, Lillehammer (1992)

    Google Scholar 

  2. Coin-CLP: http://www.coin-or.org/projects/Clp.xml

  3. Egeland, O., Hegge, J., Kylling, E., Nes, J.: The extended power pool model. Operation planning of a multi-river and multi-reservoir hydro-dominated power production system. A hierarchical approach. In: CIGRE, paper 32–14 (1982)

    Google Scholar 

  4. Flatabø, N., Doorman, G., Grande, O.S., Randen, H., Wangensteen, I.: Experience with the Nord Pool design and implementation. IEEE Trans. Power Syst. 18(2), 541–547 (2003)

    Article  Google Scholar 

  5. Gjelsvik, A., Mo, B., Haugstad, A.: Long- and medium-term operations planning and stochastic modelling. In: Hydro-dominated power systems based on stochastic dual dynamic programming, Handbook of Power Systems I. Energy Systems, pp. 33–55. Springer, Berlin (2010)

    Google Scholar 

  6. Gjelsvik, A., Røtting, T.A., Røynstrand, J.: Long-term scheduling of hydro-thermal power systems. In: Brock, E., Lysne, D. (eds.) Hydropower 92, pp. 539–546. Lillehammer (1992)

    Google Scholar 

  7. Neto, T.A.A., Pereira, M.V.F., Kelman, J.: A risk-constrained stochastic dynamic programming approach to the operation planning of hydrothermal systems. IEEE Trans. Power Aparatus Syst. PAS-104(2), 273–279 (1985)

    Article  Google Scholar 

  8. Pereira, M.V.F.: Optimal stochastic operations scheduling of large hydroelectric systems. Electr. Power Energy Syst. 11(3), 161–169 (1989)

    Article  Google Scholar 

  9. Pereira, M.V.F., Pinto, L.M.V.G.: Stochastic optimization of a multireservoir hydroelectric system: A decomposition approach. Water Resour. Res. 21(6), 779–792 (1985)

    Article  Google Scholar 

  10. Pereira, M.V.F., Pinto, L.M.V.G.: Multi-stage stochastic optimization applied to energy planning. Math. Program. 52, 359–375 (1991)

    Article  MATH  MathSciNet  Google Scholar 

  11. Stage, S., Larsson, Y.: Incremental cost of water power. Trans. Am. Inst. Electr. Eng. 80(3), 361–364 (1961)

    Google Scholar 

  12. Turgeon, A.: Optimal operation of multireservoir power systems with stochastic inflows. Water Resour. Res. 16(2), 275–283 (1980)

    Article  Google Scholar 

  13. Van Slyke, R.M., Wets, R.: L-shaped linear programs with applications to optimal control and stochastic programming. SIAM J. Appl. Math. 17(4), 638–663 (1969)

    Article  MATH  MathSciNet  Google Scholar 

  14. Wolfgang, O., Haugstad, A., Mo, B., Gjelsvik, A., Wangensteen, I., Doorman, G.: Hydro reservoir handling in Norway before and after deregulation. Energy 34(10), 1642–1651 (2009)

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to A. Helseth.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Helseth, A., Mo, B. & Warland, G. Long-term scheduling of hydro-thermal power systems using scenario fans. Energy Syst 1, 377–391 (2010). https://doi.org/10.1007/s12667-010-0020-7

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s12667-010-0020-7

Keywords

Navigation