Abstract
As the electric transmission system in the U.S. ages, mitigating the risk of high-voltage transformer failures becomes an increasingly important issue for transmission owners and operators. This paper introduces a model that supports these efforts by optimizing the acquisition and the deployment of high-voltage transformers dynamically over time. We formulate the problem as a Markov Decision Process which cannot be solved for realistic problem instances. Instead we solve the problem using approximate dynamic programming using three different value function approximations, which are compared against an optimal solution for a simplified version of the problem. The methods include a separable, piecewise linear value function, a piecewise linear, two-dimensional approximation, and a piecewise linear function based on an aggregated inventory that is shown to produce solutions within a few percent with very fast convergence. The application of the best performing algorithm to a realistic problem instance gives insights into transformer management issues of practical interest.
Similar content being viewed by others
References
Ahmed, S., King, A.J., Parija, G.: A multi-stage stochastic integer programming approach for capacity expansion under uncertainty. J. Glob. Optim. 26, 3–24 (2003)
Bertsekas, D., Tsitsiklis, J.: Neuro-dynamic Programming. Athena Scientific, Belmont (1996)
Caroe, C.C., Tind, J.: L-shaped decomposition of two-stage stochastic programs with integer recourse. Math. Program. 83(3), 139–152 (1998)
Chen, Q.M., Egan, D.M.: A Bayesian method for transformer life estimation using Perks’ hazard function. IEEE Trans. Power Syst. 21(4), 1954–1965 (2006)
Chowdhury, A.A., Koval, D.O.: Development of probabilistic models for computing optimal distribution substation spare transformers. IEEE Trans. Ind. Appl. 41(6), 1493–1498 (2005)
De Véricourt, F., Karaesmen, F., Dallery, Y.: Optimal stock allocation for a capacitated supply system. Manage. Sci. 48(11), 1486–1501 (2002)
Deshpande, V., Cohen, M.A., Donohue, K.: A threshold inventory rationing policy for service-differentiated demand classes. Manage. Sci. 49(6), 683–703 (2003)
Godfrey, G., Powell, W.: An adaptive dynamic programming algorithm for dynamic fleet management, I: Single period travel times. Transp. Sci. 36, 21–39 (2002)
Godfrey, G.A., Powell, W.B.: An adaptive, distribution-free approximation for the newsvendor problem with censored demands, with applications to inventory and distribution problems. Manage. Sci. 47, 1101–1112 (2001)
Ha, A.Y.: Stock-rationing policy for make-to-stock production system with two priority classes and backordering. Nav. Res. Logist. 44, 457–472 (1997)
Huiskonen, J.: Maintenance spare parts logistics: special characteristics and strategic choices. Int. J. Prod. Econ. 71, 125–134 (2001)
Kogan, V.I., Roeger, C.J., Tipton, D.E.: Substation distribution transformers failures and spares. IEEE Trans. Power Syst. 11(4), 1905–1912 (1996)
Laporte, G., Louveaux, E.V.: The integer L-shaped method for stochastic integer programs with complete recourse. Oper. Res. Lett. 13, 133–142 (1993)
Li, W., Vaahedi, E., Mansour, Y.: Determining number and timing of substation spare transformers using a probabilistic cost analysis approach. IEEE Trans. Power Deliv. 14(3), 934–939 (1999)
Muckstadt, J.A.: Analysis and Algorithms for Service Parts Supply Chains. Springer, Berlin (2005)
Nemhauser, G., Wolsey, L., Fisher, M.: An analysis of approximations for maximizing submodular set functions—I. Math. Program. 14, 265–294 (1978)
Norkin, V.I., Ermoliev, Y.M., Ruszczynski, A.: On optimal allocation of indivisibles under uncertainty. Oper. Res. 46(3), 381–395 (1998)
Parija, G.R., Ahmed, S., King, A.J.: On bridging the gap between stochastic integer programming and MIP solver technologies. INFORMS J. Comput. 16(1), 73–83 (2004)
Powell, W.B.: Approximate Dynamic Programming: Solving the Curses of Dimensionality. Wiley, Hoboken (2007)
Powell, W.B., Shapiro, J.A., Simão, H.P.: An adaptive dynamic programming algorithm for the heterogeneous resource allocation problem. Transp. Sci. 36, 231–249 (2002)
Simão, H., Powell, W.: Approximate dynamic programming for management of high-value spare parts. J. Manuf. Technol. Manag. 20, 147–160 (2009)
Tempelmeier, H.: Supply chain inventory optimization with two customer classes in discrete time. Eur. J. Oper. Res. 174, 600–621 (2005)
Topaloglu, H., Powell, W.B.: Dynamic programming approximations for stochastic, time-staged integer multicommodity flow problems. INFORMS J. Comput. 18(1), 31–42 (2006)
Topkis, D.M.: Optimal ordering and rationing policies in a non-stationary dynamic inventory model with n demand classes. Manage. Sci. 15(3), 160–176 (1968)
Wong, H., Van Houtum, G., Cattrysse, D., Van Oudheusden, D.: Simple, efficient heuristics for multi-item multi-location spare parts systems with lateral transshipments and waiting time constraints. J. Oper. Res. Soc. 56, 1419–1430 (2005)
Wong, H., Van Houtum, G.J., Cattrysse, D., Oudheusden, D.V.: Multi-item spare parts systems with lateral transshipments and waiting time constraints. Eur. J. Oper. Res. 171, 1071–1093 (2006)
Zipkin, P.: Foundations of Inventory Management. McGraw-Hill, New York (2000)
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Enders, J., Powell, W.B. & Egan, D. A dynamic model for the failure replacement of aging high-voltage transformers. Energy Syst 1, 31–59 (2010). https://doi.org/10.1007/s12667-009-0006-5
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s12667-009-0006-5