Abstract
Roadways in coal mines normally have two vertical side walls and a semicircular arch-shaped roof when viewed in cross section, a design conducive to the stability of surrounding rocks. The North 1 main roadway in Duerping Coal Mine has suffered severe damage and the conventional support method employed there is incapable of ensuring long-term stability of the surrounding rocks. This study provides a mechanical analysis of this vertical-wall, semicircular-arch (VWSA) roadway using a mechanical model. Formulas describing stresses in the rocks surrounding a VWSA roadway were derived through complex analysis. The stress distribution in the surrounding rocks was then predicted using the formulas. Based on the results, a double-shell support structure consisting of an internal shell, a flexible interlayer, and an external shell was developed as a new technique to stabilize surrounding rocks. The functional mechanisms of the three parts and the specific construction procedure are detailed in this paper. Moreover, the key technical parameters were optimized through a comparative analysis of the surrounding rock’s deformation behavior for different shell and interlayer thicknesses. After implementation of this technique, the floor heave, relative displacement between two sides, and roof lowering in the North 1 main roadway decreased to 82, 185, and 161 mm, respectively, which meet the requirements for long-term service. This verifies the effectiveness of the proposed technique in surrounding rock control.



















Similar content being viewed by others
Explore related subjects
Discover the latest articles and news from researchers in related subjects, suggested using machine learning.References
Bjorkman GS, Richards R (1976) Harmonic holes—an inverse problem in elasticity. J Appl Mech 43(3):414–418
Bjorkman GS, Richards R (1979) Harmonic holes for nonconstant fields. J Appl Mech 46(3):573–576
Bloor AS (2013) Deformation of a circular concrete roadway lining in response to strata movement. Strata Mech 32:223
Chen ZY (1994) Mechanical analysis of surrounding rock. Coal Industry Publishing House, Beijing
Cristescu ND, Paraschiv I (1995) The optimal shape of rectangular-like caverns. Int J Rock Mech Min Sci Geomech Abstr 32(4):285–300
Feng W, Han LJ, Liu CC (2012) Influence of horizontal stress on stress distribution and deformation characteristics around arched roadway. J Saf Sci Technol 8(12):21–26
Goursat E (1898) Leçons sur l’intégration des équations aux dérivées partiellesdu second ordre à deux variables indépendantes. A. Hermann
Guo WY, Zhao TB, Tan YL et al (2017) Progressive mitigation method of rock bursts under complicated geological conditions. Int J Rock Mech Min Sci 96:11–22
He ZL, Qu B (2016) Simulation analysis of floor stress under different lateral pressure coefficients in vertical-wall, semicircular-arch (VWSA) roadway. Min Technol 16(4):38–39 (in Chinese)
Kim BH, Larson MK, Lawson HE (2018) Applying robust design to study the effects of stratigraphic characteristics on brittle failure and bump potential in a coal mine. Int J Min Sci Technol
Koyama Y (2003) Present status and technology of shield tunneling method in Japan[J]. Tunn Undergr Space Technol 18(2):145–159
Lv AZ, Zhang LQ (2007) Underground tunnel mechanics analysis of complex function method. Science Press, Beijing
Muskhelishvili NI (2013) Some basic problems of the mathematical theory of elasticity. Springer, Berlin
Pengfei J, Jian L, Bin H et al (2016) The deformation mechanism and support methods of the water-bearing soft rock roadway. Phys Numer Simul Geotech Eng 22:55
Richards R, Bjorkman GS (1980) Harmonic shape and optimum design. J Eng Mech Div 106(6):1125–1134
Sears MM, Rusnak J, Van Dyke M et al (2017) Coal rib response during bench mining: a case study. Int J Min Sci Technol
Shan RL, Kong XS, Bin LI, Shan P, Xia Y (2014) Supporting design and optimization of large section roadway with straight wall and semicircle arch. China Min Mag 23(1):87–91
Shuancheng GU, Enbo W, Xiangdong SHI (2014) Spandrel failure mechanism analysis of arched roadway in layered rock mass. Saf Coal Min 11:050
Zang CW, Ma CL, Zhuang XA (2012) Research and application of full-length grouted anchor in roadway under mining face. Adv Mater Res Trans Tech Publ 468:2872–2877
Acknowledgements
Financial support for the Fundamental Research Funds for the Central Universities (No. 2015QNB11), the Priority Academic Program Development of Jiangsu Higher Education Institutions (PAPD). The authors gratefully acknowledge financial support of the above items.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Hong-sheng, T., Shi-hao, T., Chen, W. et al. Mechanical analysis of a vertical-wall, semicircular-arch roadway and a repair technique using double-shell support. Environ Earth Sci 77, 509 (2018). https://doi.org/10.1007/s12665-018-7680-3
Received:
Accepted:
Published:
DOI: https://doi.org/10.1007/s12665-018-7680-3