Geological and geotechnical aspects of underground coal mining methods within Australia

  • Original Article
  • Published:
Environmental Earth Sciences Aims and scope Submit manuscript

Abstract

About one quarter of the coal produced in Australia is by underground mining methods. The most commonly used underground coal mining methods in Australia are longwall, and room and pillar. This paper provides a detailed review of the two methods, including their advantages and disadvantages, the major geotechnical and operational issues, and the factors that need to be considered regarding their choice, including the varying geological and geotechnical conditions suited to a particular method. Factors and issues such as capital cost, productivity, recovery, versatility and mine safety associated with the two methods are discussed and compared. The major advantages of the longwall mining method include its suitability for mining at greater depth, higher recovery, and higher production rate compared to room and pillar. The main disadvantages of the room and pillar method are the higher risks of roof and pillar collapse, higher capital costs incurred as well as lower recovery rate.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7

Similar content being viewed by others

References

  • Anon (1998) Benchmarking the productivity of Australia’s black coal industry. Tasman Asia Pacific Pty Ltd, Australia

  • Australian Bureau of Statistics (ABS) (2006) Price index of materials used in coal mining Australia, publication no. 6427.0. http://www.abs.gov.au. Accessed 28 September 2006

  • Australian Coal Association (2006) http://www.australiancoal.com.au. Accessed 4 August 2006

  • Bayer A, Nienhaus K (2000) Capacity model for room and pillar operations with continuous miners. University of Technology, Aachen

    Google Scholar 

  • Bieniawski ZT (1983) New design approach for room-and-pillar coal mines in the USA. In: Proceedings of 5th congress of the international society for rock mechanics, Melbourne

  • Bise CJ (1995) Technology improvements aid room-and-pillar coal mining. Min Eng 47:1107–1110

    Google Scholar 

  • Bogert H, Jung SJ, Lim HW (1997) Room and pillar stope design in highly fractured area. Int J Rock Mech Min Sci 34:145.e1–145.e14

    Article  Google Scholar 

  • Bugden A, Minney D, Altounyan P (2001) Improving roof control at a South African coal mine. In: 20th international conference on ground control in mining. West Virginia University, USA

  • Darmstadter J (1997) Productivity change in US coal mining. Resources for the Future. http://www.rff.org/Documents/RFF-DP-97-40.pdf

  • Department of Environmental Protection, Pennsylvania (2006) http://www.depweb.state.pa.us/dep/site/default.asp. Accessed 5 September 2006

  • DPMC (2006) The Department of the Prime Minister and Cabinet. http://www.dpmc.gov.au. Accessed 18 August 2006

  • Environmental Protection Agency (2006) Overview of mining methods. http://www.epa.gov/Region3/mtntop/pdf/Appendices/Appendix%20H%20Engineering/MRT%20Symposium%20Proceedings/overview.PDF). Accessed 26 July 2006

  • Fowler J, Hebblewhite B (2003) Managing the hazard of wind blast/air blast in caving operations in Australian underground mines. In: 1st AGCM conference, 10–13 November 2003

  • Ghose AK (1984) Underground methods of extraction of thick coal seams—a global survey. Min Sci Technol 2:17–32. doi:10.1016/S0167-9031(84)90171-3

    Article  Google Scholar 

  • GNSW (2006) Mining data base report—Government of New South Wales. Department of Primary Industries, New South Wales (2006) http://www.dpi.nsw.gov.au. Accessed 12 August 2006

  • GQ (2006) Mining data base report—Government of Queensland, Department of Natural Resources and Minerals, Queensland (2006). http://www.nrm.qld.gov.au Accessed 12 August 2006

  • GSA (2006) Mining data base report—Government of South Australia, Primary Industries and Resources, South Australia (2006) http://www.pir.sa.gov.au. Accessed 12 August 2006

  • GT (2006) Mining data base report-Government of Tasmania, Infrastructure and Resource Information Service, Tasmania (2006) http://www.iris.tas.gov.au. Accessed 12 August 2006

  • GV (2006) Mining data base report—Government of Victoria, Department of Primary Industries, Victoria (2006) http://www.dpi.vic.gov.au. Accessed 12 August 2006

  • GWA (2006) Mining data base report-Government of Western Australia, Department of Industry and Resources, Western Australia (2006) http://www.doir.wa.gov.au. Accessed 12 August 2006

  • Hebblewhite B (2003) Management of geotechnical risks in mining projects. School of Mining Engineering, University of NSW, Australia

    Google Scholar 

  • Kelly M (1999) 3D Aspects of longwall geomechanics. Longwall Mining Summit, Yeppoon, Queensland

  • Kvitkovich J, Weisdack G (2005) Importance of longwall mining to the coal industry. Mining Eng ProQuest Sci J (December, 2005)

  • Loui JP, Sheorey PR (2002) Estimation of non-effective width for different panel shapes in room and pillar extraction. Int J Rock Mech Min Sci 39:95–99. doi:10.1016/S1365-1609(01)00074-0

    Article  Google Scholar 

  • Mark C, Chase F, Pappas D (2003) Reducing the risk of ground falls during pillar recovery. National Institute for Occupational Safety and Health, Pittsburgh

    Google Scholar 

  • Noaks M, Landz T (1993) Cost estimation handbook for the Australian mining industry. AusIMM Publishers, Melbourne

    Google Scholar 

  • Peng SS (1995) Rapid development: differing room-and-pillar techniques offer operators flexibility. Coal 100:41–43

    Google Scholar 

  • Peng SS, Chiang HS (1984) Longwall mining. Wiley, New York

    Google Scholar 

  • Trueman R, Lyman G, Cocker A (2009) Longwall roof control through a fundamental understanding of shield–strata interaction. Int J Rock Mech Min Sci 46(2):371–380

    Article  Google Scholar 

  • University of Wollongong (2006) http://www.uow.edu.au. Accessed 6 August 2006

  • Westcott P (2004) Dragline or truck/shovel? Some technical and business considerations. University of New South Wales, Mitsubishi Development Pty Ltd, Australia

  • Whittles DN, Reddish DJ, Lowndes IS (2007) The development of a coal measure classification (CMC) and its use for prediction of geomechanical parameters. Int J Rock Mech Min Sci 44:496–513. doi:10.1016/j.ijrmms.2006.08.002

    Article  Google Scholar 

  • Wilson AH (1983) The stability of underground workings in the soft rocks of the coal measures. Int J Min Eng 1:91–187. doi:10.1007/BF00880785

    Article  Google Scholar 

  • Zhitkov EF (1975) Calculation of the widths of rooms and pillars with roof control by convergence on yielding pillars. Sov Min Sci 11:17–22. doi:10.1007/BF02501008s

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to P. G. Ranjtih.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Scott, B., Ranjtih, P.G., Choi, S.K. et al. Geological and geotechnical aspects of underground coal mining methods within Australia. Environ Earth Sci 60, 1007–1019 (2010). https://doi.org/10.1007/s12665-009-0239-6

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s12665-009-0239-6

Keywords

Navigation