Multiproduct and multistage integrated production planning model and algorithm based on an available production capacity network

  • Published:
International Journal of Minerals, Metallurgy and Materials Aims and scope Submit manuscript

Abstract

This research attempts to devise a multistage and multiproduct short-term integrative production plan that can dynamically change based on the order priority and virtual occupancy for application in steel plants. Considering factors such as the delivery time, varietal compatibility between different products, production capacity of variety per hour, minimum or maximum batch size, and transfer time, we propose an available production capacity network with varietal compatibility and virtual occupancy for enhancing production plan implementation and quick adjustment in the case of dynamic production changes. Here available means the remaining production capacity after virtual occupancy. To quickly build an available production capacity network and increase the speed of algorithm solving, constraint selection and cutting methods with order priority were used for model solving. Finally, the genetic algorithm improved with local search was used to optimize the proposed production plan and significantly reduce the order delay rate. The validity of the proposed model and algorithm was numerically verified by simulating actual production practices. The simulation results demonstrate that the model and improved algorithm result in an effective production plan.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Z. Zheng, S.P. Huang, J.Y. Long, and X.Q. Gao, Synergetic method between materials flow and energy flow in iron and steel intelligent manufacturing, Chin. J. Eng., 39(2017), No. 1, p. 115.

    Google Scholar 

  2. A. Kusiak, Smart manufacturing, Int. J. Prod. Res., 56(2018), No. 1–2, p. 508.

    Article  Google Scholar 

  3. Y.N. Qi, Z.G. Mao, M. Zhang, and H.F. Guo, Manufacturing practices and servitization: The role of mass customization and product innovation capabilities, Int. J. Prod. Econ., 228(2020), art. No. 107747.

  4. J.Y. Long, Z. Zheng, and X.Q. Gao, Dynamic scheduling in steelmaking-continuous casting production for continuous caster breakdown, Int. J. Prod. Res., 55(2017), No. 11, p. 3197.

    Article  Google Scholar 

  5. Z.J. Xu, Z. Zheng, and X.Q. Gao, Operation optimization of the steel manufacturing process: A brief review, Int. J. Miner. Metall. Mater., 28(2021), No. 8, p. 1274.

    Google Scholar 

  6. R.Y. Yin, Case study, [in] R.Y. Yin, ed., Theory and Methods of Metallurgical Process Integration, Academic Press, London, 2016, p. 179.

    Chapter  Google Scholar 

  7. B. Zhang, G.S. Wang, Y. Yang, and S. Zhang, Solving the order planning problem at the steelmaking shops by considering logistics balance on the plant-wide process, IEEE Access, 7(2019), p. 139938.

    Article  Google Scholar 

  8. J.H. Lin, M. Liu, J.H. Hao, and P. Gu, Many-objective harmony search for integrated order planning in steelmaking-continuous casting-hot rolling production of multi-plants, Int. J. Prod. Res., 55(2017), No. 14, p. 4003.

    Article  Google Scholar 

  9. S. Lu, H.Y. Su, C. Johnsson, H.S. Shao, and L. Xie, A chance constrained programming approach for multi-product multistage integrated production planning under internal and external uncertainties, [in] 2015 IEEE International Conference on Automation Science and Engineering (CASE), Gothenburg, 2015, p. 880.

  10. A. Witt and S. Voss, Application of a mathematical model to an intermediate- to long-term real-world steel production planning problem based on standard software, Eur. J. Ind. Eng., 5(2011), No. 1, p. 81.

    Article  Google Scholar 

  11. K. Altendorfer and S. Minner, Simultaneous optimization of capacity and planned lead time in a two-stage production system with different customer due dates, Eur. J. Oper. Res., 213(2011), No. 1, p. 134.

    Article  Google Scholar 

  12. J.H. Lin, M. Liu, J.H. Hao, and S.L. Jiang, A multi-objective optimization approach for integrated production planning under interval uncertainties in the steel industry, Comput. Oper. Res., 72(2016), p. 189.

    Article  Google Scholar 

  13. S. Wang, Y.R. Shi, and S.X. Liu, Integrated scheduling for steelmaking continuous casting—hot rolling processes considering hot chain logistics, Math. Probl. Eng., 2020(2020), art. No. 6902934.

  14. S.P. Yuan, T.K. Li, and B.L. Wang, Improved fast elitist non-dominated sorting genetic algorithm for multi-objective steelmaking-continuous casting production scheduling, Comput. Integr. Manuf. Syst., 25(2019), No. 1, p. 115.

    Google Scholar 

  15. W.J. Xu, L.X. Tang, and E.N. Pistikopoulos, Modeling and solution for steelmaking scheduling with batching decisions and energy constraints, Comput. Chem. Eng., 116(2018), p. 368.

    Article  CAS  Google Scholar 

  16. Z.M. Lv and J.Z. Du, Order acceptance and capacity balance for steel plant based on production capacity network flow, [in] R.L. Dou, ed., Proceedings of 2012 3rd International Asia Conference on Industrial Engineering and Management Innovation (IEMI2012), Springer, Berlin, Heidelberg, 2013, p. 97.

    Google Scholar 

  17. M.O. Ball, C.Y. Chen, and Z.Y. Zhao, Available to promise, [in] D. Simchi-Levi, S.D. Wu, Z.J. Shen, eds., Handbook of Quantitative Supply Chain Analysis, Springer, Boston, MA, 2004, p. 447.

    Chapter  Google Scholar 

  18. Q. Liu, Q. Liu, J.P. Yang, J.S. Zhang, S. Gao, Q.D. Li, B. Wang, B.L. Wang, and T.K. Li, Progress of research on steelmaking-continuous casting production scheduling, Chin. J. Eng., 42(2020), No. 2, p. 144.

    Google Scholar 

  19. M.L. Spearman and M.A. Zazanis, Push and pull production systems: Issues and comparisons, Oper. Res., 40(1992), No. 3, p. 521.

    Article  Google Scholar 

  20. W.B. Wang and H.L. Qin, Parallel test using natural coding genetic algorithm, Syst. Eng. Electron., 32(2010), No. 6, p. 1343.

    Google Scholar 

  21. Z. Ruttkay, Constraint satisfaction-A survey, CWI Q., 11(1998), No. 2–3, p. 123.

    Google Scholar 

  22. V. Isoherranen and P. Kess, Production planning optimisation and challenges in steel production: SSAB process review, Int. J. Modell. Oper. Manage., 6(2016), No. 1–2, p. 19.

    Google Scholar 

Download references

Acknowledgements

This work was financially supported by the National Natural Science Foundation of China (No. 51274043). We are grateful for the data provided by LY Steel, China.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Zhi-min Lü.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Lü, Zm., Jiang, Tr. & Li, Zw. Multiproduct and multistage integrated production planning model and algorithm based on an available production capacity network. Int J Miner Metall Mater 28, 1343–1352 (2021). https://doi.org/10.1007/s12613-021-2310-6

Download citation

  • Received:

  • Revised:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s12613-021-2310-6

Keywords

Navigation