Optimizing large scale upgradations involving movable assets

  • Application Article
  • Published:
OPSEARCH Aims and scope Submit manuscript

Abstract

Product upgradations are common, as it is practical and economical in many cases, compared to complete replacement. Proper planning and scheduling using quantitative techniques can be helpful in the case of large-scale upgradations involving movable assets, like rolling stock. There is a possibility of doing the upgradation of the asset in multiple locations, and there are operational constraints involved in executing the process. In this paper, we propose integer programming models to optimize the execution of these types of upgrades. A case involving retrofitting of bio-toilets in Indian Railways is used as an example. Computations are done for the allocation of movable assets for retrofit in a division of Southern Railways. The central unit decides the number of items to be retrofitted in each facility and facilities to be upgraded based on the output of the optimization model. Subsequently, a model for scheduling retrofitting at a facility is also discussed. There are other problems in the industry involving other movable assets like automobile and naval vessels, where extension of these models can be useful.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6

Similar content being viewed by others

References

  1. Alfieri, A., Groot, R., Kroon, L., Schrijver, A.: Efficient circulation of railway rolling stock. Transp. Sci. 40(3), 378–391 (2006)

    Article  Google Scholar 

  2. Budai, G., Huisman, D., Dekker, R.: Scheduling preventive railway maintenance activities. J. Oper. Res. Soc. 57(9), 1035–1044 (2006)

    Article  Google Scholar 

  3. Caprara, A., Kroon, L., Monaci, M., Peeters, M., Toth, P.: Passenger railway optimization. Handb. Oper. Res. Manag. Sci. 14, 129–187 (2007)

    Google Scholar 

  4. Chung, W.H., Kremer, G.E.O., Wysk, R.A.: A dynamic programming method for product upgrade planning incorporating technology development and end-of-life decisions. J. Ind. Prod. Eng. 34(1), 30–41 (2017)

    Google Scholar 

  5. Giacco, G.L., Carillo, D., D’Ariano, A., Pacciarelli, D., Marín, Á.G.: Short-term rail rolling stock rostering and maintenance scheduling. Transp. Res. Procedia 3, 651–659 (2014)

    Article  Google Scholar 

  6. Higgins, A.: Scheduling of railway track maintenance activities and crews. J. Oper. Res. Soc. 49(10), 1026–1033 (1998)

    Article  Google Scholar 

  7. Huisman, D., Kroon, L.G., Lentink, R.M., Vromans, M.J.: Operations research in passenger railway transportation. Statistica Neerlandica 59(4), 467–497 (2005)

    Article  Google Scholar 

  8. Lidén, T.: Railway infrastructure maintenance-a survey of planning problems and conducted research. Transp. Res. Procedia 10, 574–583 (2015)

    Article  Google Scholar 

  9. Ministry of Railways, G.o.I.: Indian railways year book 2018–19. Technical report (2019)

  10. Riggs, L.S., Sanvido, V.E.: Managing retrofit projects. Technical report, Georgia Institute of Technology (1991)

  11. Tönissen, D., Arts, J., Shen, Z.J.: Maintenance location routing for rolling stock under line and fleet planning uncertainty. Transp. Sci. 53(5), 1252–1270 (2019)

    Article  Google Scholar 

  12. Tréfond, S., Billionnet, A., Elloumi, S., Djellab, H., Guyon, O.: Optimization and simulation for robust railway rolling-stock planning. J. Rail Transp. Plan. Manag. 7(1–2), 33–49 (2017)

    Google Scholar 

  13. Vale, C., Ribeiro, I.M., Calçada, R.: Integer programming to optimize tamping in railway tracks as preventive maintenance. J. Transp. Eng. 138(1), 123–131 (2011)

    Article  Google Scholar 

Download references

Acknowledgements

We thank the editor and the anonymous reviewers for their insightful comments, which helped in improving the paper. We would also like to thank the Southern Railway officials for permission for site visits and discussions.

Author information

Authors and Affiliations

Authors

Contributions

The authors confirm the responsibility for the following: study conception and experiment design, data collection, analysis and interpretation of results, and manuscript preparation.

Corresponding author

Correspondence to Swapnesh Subramanian.

Ethics declarations

Funding

Not applicable.

Conflict of interest

The authors declare that they have no conflicts of interest or competing interests.

Availability of data and material

The data is available in the following weblink: https://figshare.com/s/7c2e17ae297b1750de5a.

Code availability

The codes are available in the following weblink: https://figshare.com/s/7c2e17ae297b1750de5a.

Additional information

Publisher's Note

Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Subramanian, S., Rangaraj, N. Optimizing large scale upgradations involving movable assets. OPSEARCH 59, 930–944 (2022). https://doi.org/10.1007/s12597-022-00579-z

Download citation

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s12597-022-00579-z

Keywords

Navigation