Skip to main content
Log in

The effects of inspection delay and restoration cost on the optimal inspection and production policy

  • Theoretical Article
  • Published:
OPSEARCH Aims and scope Submit manuscript

Abstract

Economic production lot size models with a process inspection delay have been studied over several decades in the literature. When an imperfect process is assumed to have a given probability to run from an in-control state to an out-of-control state each time an item is produced, an inspection schedule is arranged to monitor the process reliability; however, a time delay to obtain the inspection results exists. This study further includes process restoration cost in the inspection/production model to study its effects on the optimal production lot size and the economic inspection lot under the consideration of minimizing the approximated total cost per week. For the case of multiple inspections, when the restoration cost is considered, the resulting the economic inspection lot may depend on the production lot size, especially when the fixed part of the restoration cost is large.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1

Similar content being viewed by others

References

  1. Lee, H., Rosenblatt, M.: Simultaneous determination of production cycle and inspection schedules in a production system. Manag. Sci. 33, 1125–1136 (1987)

    Article  Google Scholar 

  2. Makis, V., Fung, J.: An EMQ model with inspections and random machine failures. J. Oper. Res. Soc. 49, 66–76 (1998)

    Article  Google Scholar 

  3. Porteus, E.: Optimal lot sizing, process quality improvement and setup cost reduction. Oper. Res. 34, 137–144 (1986)

    Article  Google Scholar 

  4. Porteus, E.: The impact of inspection delay on process and inspection lot sizing. Manag. Sci. 36, 999–1007 (1990)

    Article  Google Scholar 

  5. Raz, T., Herer, Y., Grosfeld-Nir, A.: Economic optimization of off-line inspection. IIE Trans. 32, 205–217 (2000)

    Google Scholar 

  6. Tseng, S.T.: Optimal preventive maintenance policy for deteriorating production systems. IIE Trans. 28, 687–694 (1996)

    Article  Google Scholar 

  7. Wang, C.H.: Optimal production and maintenance policy for imperfect production systems. Naval Res. Logist. 53, 151–156 (2006)

    Article  Google Scholar 

  8. Wang, C.H., Yeh, R.H.: Utilizing an approximate solution to obtain the real optimal solution for a production and inspection model. Appl. Math. Model. 33, 3769–3775 (2009)

    Article  Google Scholar 

  9. Yao, M.J., Chen, S.C., Chang, Y.J.: A common cycle approach for solving the economic lot and inspection scheduling problem. J. Ind. Manag. Optim. 8(1), 141–162 (2011)

    Article  Google Scholar 

  10. Yao, M.J., Chen, S.C., Chang, Y.J., Tseng, T.Y.: Solving the economic lot and inspection scheduling problem using the extended basic period approach under power-of-two policy. J. Chin. Inst. Ind. Eng. 29(1), 43–60 (2012)

    Google Scholar 

Download references

Acknowledgements

The authors would like to thank the two anonymous referees together with the Managing Editor, N. M. Ganguli and the Editor in Chief, Professor S. G. Deshmukh, for their helpful comments. Based on these comments, some changes to the revised manuscript have been made.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Chih-Hsiung Wang.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Tsai, W.C., Shih, NH. & Wang, CH. The effects of inspection delay and restoration cost on the optimal inspection and production policy. OPSEARCH 55, 187–195 (2018). https://doi.org/10.1007/s12597-017-0313-x

Download citation

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s12597-017-0313-x

Keywords

Navigation