Abstract
In community emergency management, it is crucial to generate evacuation task plans (ETPs) to help reduce risks in complex disaster situations. Case-driven and model-driven approaches have their respective advantages in generating ETPs, which can complement each other. With case-driven approach, historical experience can be fully used to establish the relationship between typhoon scenarios and historical ETPs. Through model-driven approach, the continuity of ETPs can be guaranteed when required information to operate the plans is missing. This study aims at proposing an integrated approach that can combine the benefits of both case-driven approaches and model-driven approaches. Based on the structural modeling of evacuation tasks, this paper proposes an integrated approach to generate ETPs for community typhoon emergencies. Finally, a case that is based on actual problems is provided to verify the reasonability and effectiveness of the proposed method.
Similar content being viewed by others
References
Amailef K, Lu J (2013) Ontology-supported case-based reasoning approach for intelligent m-Government emergency response services. Decis Support Syst 55:79–97
Bish DR, Sherali HD (2013) Aggregate-level demand management in evacuation planning. Eur J Oper Res 224:79–92
Blecic I, Cecchini A, Pusceddu C (2008) Constructing strategies in strategic planning: a decision support evaluation model. Oper Res Int J 8:153–166
Bretschneider S, Kimms A (2012) Pattern-based evacuation planning for urban areas. Eur J Oper Res 216:57–69
Chassiakos AP (2006) Longest path time-cost analysis of construction projects with generalised activity constraints. Oper Res Int J 6:271
Chen R, Sharman R, Rao HR, Upadhyaya SJ (2013) Data model development for fire related extreme events: an activity theory approach. MIS Quart 37:125–147
China Meteorological Administration (2017a) Guangdong: starting 3rd level emergency response during Pakhar. http://www.cma.gov.cn/2011xwzx/2011xgzdt/201708/t20170826_447380.html/ Accessed 21 March 2018
China Meteorological Administration (2017b) Overlapping influences need to be considered during Pakhar. http://www.cma.gov.cn/2011xwzx/2011xqxxw/2011xqxyw/201708/t20170827_447438.html/ Accessed 21 March 2018
Fan ZP, Li YH, Zhang Y (2015) Generating project risk response strategies based on CBR: a case study. Expert Syst Appl 42:2870–2883
Godinho P, Costa JP (2017) A stochastic model and algorithms for determining efficient time–cost tradeoffs for a project activity. Oper Res Int J. https://doi.org/10.1007/s12351-017-0326-5
Hu Y, Zhang XZ, Ngai EWT, Cai RC, Liu M (2013) Software project risk analysis using Bayesian networks with causality constraint. Decis Support Syst 56:439–449
Ju Y, Wang A, Liu X (2012) Evaluating emergency response capacity by fuzzy AHP and 2-tuple fuzzy linguistic approach. Expert Syst Appl 39:6972–6981
Kim HY, Won CH (2018) Forecasting the volatility of stock price index: a hybrid model integrating LSTM with multiple GARCH-type models. Expert Syst Appl 103:25–37
Kolen B, Helsloot I (2014) Decision-making and evacuation planning for flood risk management in the Netherlands. Disasters 38:610–635
Krleza D, Fertalj K (2017) Graph matching using hierarchical fuzzy graph neural networks. IEEE Trans Fuzzy Syst 25:892–904
Liu D, Wang H, Qi C, Zhao P, Wang J (2016) Hierarchical task network-based emergency task planning with incomplete information, concurrency and uncertain duration. Knowl Based Syst 112:67–79
Lupiani E, Juarez JM, Palma J, Marin R (2017) Monitoring elderly people at home with temporal case-based reasoning. Knowl-Based Syst 134:116–134
Ongkunaruk P, Wongsatit W (2014) An ECRS-based line balancing concept: a case study of a frozen chicken producer. Bus Process Manag J 20:678–692
Othman SH, Beydoun G (2013) Model-driven disaster management. Inf Manag Amster 50:218–228
Perry RW, Lindell MK (2003) Preparedness for emergency response: guidelines for the emergency planning process. Disasters 27:336–350
Prashar S, Shaw R, Takeuchi Y (2013) Community action planning in East Delhi: a participatory approach to build urban disaster resilience. Mitig Adapt Strat Glob 18:429–448
Psaromiligkos Y, Orfanidou M, Kytagias C, Zafiri E (2011) Mining log data for the analysis of learners’ behaviour in web-based learning management systems. Oper Res Int J 11:187–200
Pyakurel U, Dhamala TN (2016) Continuous dynamic contraflow approach for evacuation planning. Ann Oper Res 253:573–598
Rabbani M, Sabbaghnia A, Mobini M et al (2018) A graph theory-based algorithm for a multi-echelon multi-period responsive supply chain network design with lateral-transshipments. Oper Res Int J. https://doi.org/10.1007/s12351-018-0425-y
Restrepo CE, Simonoff JS, Zimmerman RZ (2009) Causes, cost consequences, and risk implications of accidents in US hazardous liquid pipeline infrastructure. Int J Crit Infrastruct Prot 2:38–50
Shui XG, Zuo XQ, Chen C, Smith AE (2015) A clonal selection algorithm for urban bus vehicle scheduling. Appl Soft Comput 36:36–44
Tang P, Shen GQP (2015) Decision-making model to generate novel emergency response plans for improving coordination during large-scale emergencies. Knowl Based Syst 90:111–128
Thompson RR, Garfin DR, Silver RC (2017) Evacuation from natural disasters: a systematic review of the literature. Risk Anal 37:812–839
Van der Aalst W (2018) Spreadsheets for business process management Using process mining to deal with “events” rather than “numbers”? Bus Process Manag J 24:105–127
Yang L, Su G, Yuan H (2012) Design principles of integrated information platform for emergency responses: the case of 2008 Beijing Olympic Games. Inf Syst Res 23:761–786
Yu F, Li XY, Han XS (2018) Risk response for urban water supply network using case-based reasoning during a natural disaster. Saf Sci 106:121–139
Zhang Y (2016) Selecting risk response strategies considering project risk interdependence. Int J Project Manag 34:819–830
Zhang Y, Fan ZP (2014) An optimization method for selecting project risk response strategies. Int J Project Manag 32:412–422
Zhang M, Gable GG (2017) A systematic framework for multilevel theorizing in information systems research. Inf Syst Res 28:203–224
Zhang B, Li XY, Wang S (2015) A novel case adaptation method based on an improved integrated genetic algorithm for power grid wind disaster emergencies. Expert Syst Appl 42:7812–7824
Zhao P, Wang H, Qi C, Liu D (2017) HTN planning with uncontrollable durations for emergency decision-making. J Intell Fuzzy Syst 33:1–13
Zhu ZQ, Hsu HY, Nagalingam S, Geng L (2013) Literature review on the creativity of CBR applications. Artif Intell Rev 40:379–390
Acknowledgements
This work is supported by the Major Research Project of Nation Natural Science Foundation of China named “Big data Driven Management and Decision-making Research” (No. 91746207), the General Program of Nation Natural Science Foundation of China (No. 71774043) and the Emergency Management Major Research Project of Nation Natural Science Foundation of China (No. 91024028).
Author information
Authors and Affiliations
Corresponding author
Ethics declarations
Conflict of interest
The Authors declare that they have no conflict of interest.
Additional information
Publisher's Note
Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.
Rights and permissions
About this article
Cite this article
Liu, Zg., Li, Xy. & Durrani, D.K. Generating evacuation task plans for community typhoon emergencies: an integration of case-driven and model-driven approaches. Oper Res Int J 21, 745–774 (2021). https://doi.org/10.1007/s12351-019-00481-5
Received:
Revised:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s12351-019-00481-5