Construction simulation and real-time control for high arch dam

  • Published:
Transactions of Tianjin University Aims and scope Submit manuscript

Abstract

A method of combining dynamic simulation with real-time control was proposed to fit the randomness and uncertainty in the high arch dam construction process. The mathematical logic model of high arch dam construction process was established. By combining dynamic construction simulation with schedule analysis, the process of construction schedule forecasting and analysis based on dynamic simulation was studied. The process of real-time schedule control was constructed and some measures for dynamic adjustment and control of construction schedule were provided. A system developed with the method is utilized in a being constructed hydroelectric project located at the Yellow River in northwest China, which can make the pouring plan of the dam in the next stage (a month, quarter or year) to guide the practical construction. The application result shows that the system provides an effective technical support for the construction and management of the dam.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Jurecha W, Widmann R. Optimization of dam concreting by cable-cranes [C] 11th International Congress on Large Dams, 1973. 43–49.

  2. Lu Ming. Simplified discrete-event simulation approach for construction simulation [J]. Journal of Construction Engineering and Management, 2003, 129(5):537–546.

    Article  Google Scholar 

  3. Mohamed Y, Abourizk S M. Framework for building intelligent simulation models of construction operations [J]. Journal of Computing in Civil Engineering, 2005, 19(3): 277–291.

    Article  Google Scholar 

  4. Zhong Denghua, Li Jingru, Zhu Huirong et al. Geographic information system-based visual simulation methodology and its application in concrete dam construction processes [J]. Journal of Construction Engineering and Management, 2004, 130(5): 742–750.

    Article  Google Scholar 

  5. Zhong Denghua, Lian Jiliang, Zhu Huirong. 3D dynamic visual simulation of concrete dam construction [J]. Journal of Tianjin University, 2004, 37(1):45–49(in Chinese).

    Google Scholar 

  6. Lian Jiliang, Zhong Denghua. DamVSIS visual simulation system used in concrete dam construction [J]. Journal of Tianjin University, 2006, 39(Suppl):398–405.

    Google Scholar 

  7. Zhong Denghua, Lian Jiliang, Zhang Zongliang et al. Study on the visualization about its simulation calculating of concrete dam construction [J]. System Engineering Theory and Practice, 2003, 6(6):133–138(in Chinese).

    Google Scholar 

  8. Zhong Denghua, Wu Kangxin, Ren Bingyu. Dynamic simulation for high arch dam construction process based on object-oriented technology [J]. Journal of Tianjin University, 2007, 40(8):976–982(in Chinese).

    Google Scholar 

  9. Zhong Denghua, Wu Kangxin, Lian Jiliang. Research on construction simulation and optimization for concrete dam based on multi-agent [J]. Journal of System Simulation, 2008, 20(2):485–489, 498(in Chinese).

    Google Scholar 

  10. Zhong Denghua, Zheng Jiaxiang, Liu Donghai et al. Technology and Application of Visual Simulation [M]. China Water Conservancy and Hydropower Press, Beijing, 2002(in Chinese).

    Google Scholar 

  11. Carrie Sturts Dossick, Timothy K Schunk. Subcontractor schedule control method [J]. Journal of Construction Engineering and Management, 2007, 133(3):262–265.

    Article  Google Scholar 

  12. Liu Donghai, Feng Shouzhong, Zhong Denghua et al. Project schedule real-time forecasting and control based on simulated construction process [J]. Journal of Tianjin University, 2006, 39(3):280–283(in Chinese).

    Google Scholar 

  13. Qiu Shiming, Wang Renchao, Gu Peiliang. Study on decision support system of concrete-dam construction [J]. Journal of Tianjin University, 2002, 35(3):392–396(in Chinese).

    MathSciNet  Google Scholar 

  14. Song Yang, Zhong Denghua. Study on construction schedule management and control method for hydraulic and hydropower engineering based on visual simulation [J]. System Engineering Theory and Practice, 2006, 8(8):55–62(in Chinese).

    Google Scholar 

  15. Zhong Denghua, Liu Kuijian. Schedule forecasting and control based on real-time simulation of underground structure group construction [J]. Journal of Tianjin University, 2007, 40(6):721–725(in Chinese).

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Denghua Zhong  (钟登华).

Additional information

ZHONG Denghua, born in 1963, male, Dr, Prof.

Supported by National Natural Science Foundation of China(No.50539120), National Basic Research Program of China(“973”Program,No. 2007 CB714101), National Science Fund for Distinguished Young Scholars of China(No.50525927), and National Natural Science Foundation of China (No.50579045).

Rights and permissions

Reprints and permissions

About this article

Cite this article

Zhong, D., Ren, B. & Wu, K. Construction simulation and real-time control for high arch dam. Trans. Tianjin Univ. 14, 248–253 (2008). https://doi.org/10.1007/s12209-008-0044-4

Download citation

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s12209-008-0044-4

Keywords

Navigation