Abstract
The existing calculation process of the cantilever cast arch-cable force has a poor fit with the actual process, leading to the lack of good parameter corrections. To improve the overall control quality of the linearity and stress of the arch ring, there is an urgent need for a solution method with higher flexibility and better practicability. Combined with the existing research results, this study proposes a multi-loop nesting algorithm. The algorithm decomposes the whole construction process into individual subsystem control modules, and sets the control indexes of stress and displacement in individual control modules. Subsequently, the analysis and calculation of other modules are completed according to the construction sequence until structure closure. Finally, we determine whether the overall construction control indexes meet the requirements. According to the findings, the results obtained by this algorithm meet the design requirements, and its applicability is verified. Compared with other algorithms, the algorithm is more effective in controlling the stress and deformation of the arch ring during the construction process. This algorithm solves the dispersion between structural systems in previous calculations and has more flexible parameter and control index settings. Additionally, the calculation control idea of this algorithm can be further extended to the construction control of the “cable-beam” cantilever structure.
Similar content being viewed by others
References
Cai J (2003) Calculation of force in control cable for arch segment erection with one-time jacking cable method. Highway Engineering 28(3):16–17, DOI: https://doi.org/10.3969/j.issn.1674-0610.2003.03.005 (in Chinese)
Chen B, Zhang M, Liu J, Li C (2021) Application and prospects of concrete arch bridges in China. Journal of Fuzhou University (Natural Science Edition) 49(5):716–726 (in Chinese)
Deng K, Yan G Yang H, Zhao C (2019) RC arch bridge seismic performance evaluation by sectional NM interaction and coupling effect of brace beams. Engineering Structures 183:18–29, DOI: https://doi.org/10.1016/j.engstruct.2019.01.013
Feng Y, Lan C, Briseghella B, Fenu L, Zordan T (2022) Cable optimization of a cable-stayed bridge based on genetic algorithms and the influence matrix method. Engineering Optimization 54(1):20–39, DOI: https://doi.org/10.1080/0305215X.2020.1850709
JTG 3362-2018 (2018) Specifications for design of highway reinforced concrete and prestressed concrete bridges and culverts. JTG 3362-2018, China Communications Press Co., Ltd, Beijing, China
JTG D61-2005 (2005) Code for design of highway masonry bridges and culverts. JTG D61-2005, China Communications Press Co., Ltd, Beijing, China
JTG/T 3650-2020 (2020) Technical specifications for construction of highway bridges and culverts. JTG/T 3650-2020, China Communications Press Co., Ltd, Beijing, China
Lei J (2015) Long-span bridge structure theory and application. Beijing Jiaotong University Press, Beijing, China, 158–162
Li Y, Li Y, Li J (2019) The cable force optimization method of large-Span concrete filled steel tubular arch bridge with cable-stayed construction. Progress in Steel Building Structures 21(2):33–39, DOI: https://doi.org/10.13969/j.cnki.cn31-1893.2019.02.004 (in Chinese)
Liu J, Chen B, Li C, Zhang M, Mou T, Tabatabai H (2022a) Recent application of research on concrete arch bridges in China. Structural Engineering International 1–5, DOI: https://doi.org/10.1080/10168664.2022.2058441
Liu ZW, Zhou SX, Zou K, Qu YH (2022b) A numerical analysis of buckle cable force of concrete arch bridge based on stress balance method. Scientific Reports 12(1):1–15
Lu X, Lin K, Li C, Li Y (2018) New analytical calculation models for compressive arch action in reinforced concrete structures. Engineering Structures 168:721–735, DOI: https://doi.org/10.1016/j.engstruct.2018.04.097
Lu Y, Peng W, Tian Z (2013) Research on the construction control of long-span reinforced concrete box arch hanging and casting. Journal of China & Foreign Highway 33(2):189–192, DOI: https://doi.org/10.3969/j.issn.1671-2579.2013.02.049 (in Chinese)
Mermigas KK, Wang H (2019) Comparative study of the proportions and efficiency of steel arch bridges. International Conference on Arch Bridges 280–288, DOI: https://doi.org/10.1007/978-3-030-29227-0_28
Minh HL, Sang-To T, Khatir S, Wahab MA, Cuong-Le T (2023) Damage identification in high-rise concrete structures using a bio-inspired meta-heuristic optimization algorithm. Advances in Engineering Software 176:103399, DOI: https://doi.org/10.1016/j.advengsoft.2022.103399
Modena C, Tecchio G, Pellegrino C, da Porto F, Dona M, Zampieri P, Zanini MA (2015) Reinforced concrete and masonry arch bridges in seismic areas: Typical deficiencies and retrofitting strategies. Structure and Infrastructure Engineering 11(4/6):415–442, DOI: https://doi.org/10.1080/15732479.2014.951859
Pan Z, Xiong X, Zhang Z (2021) Study on the correction of cable force of large-span overhanging arch based on MPGA algorith. Highway 66(1):194–197
Peng W (2020) Research on cable force optimization and arch ring stress regulation during construction of long-span concrete arch bridge with cantilever casting methods. PhD Thesis, Changsha University of Science & Technology, Changsha, China (in Chinese)
Qin D, Zheng J, Du H, Han Y, Zheng J, Wei L (2020) Optimization calculation method for stayed-buckle cable force under one-time tension by fastening stay method and its application. China Railway Science (6):52–60, DOI: https://doi.org/10.3969/j.issn.1001-4632.2020.06.06 (in Chinese)
Sang-To T, Hoang-Le M, Wahab MA, Cuong-Le T (2022) An efficient planet optimization algorithm for solving engineering problems. Scientific Reports 12(1):8362, DOI: https://doi.org/10.1038/s41598-022-12030-w
Sang-To T, Le-Minh H, Wahab MA, Thanh CL (2023) A new metaheuristic algorithm: Shrimp and Goby association search algorithm and its application for damage identification in large-scale and complex structures. Advances in Engineering Software 176:103363, DOI: https://doi.org/10.1016/j.advengsoft.2022.103363
Sun B, Wang Q, Tian Z (2020) Research on the application of simulated annealing algorithm in the calculation of cable-stayed force of cantilever cast arch bridge. Journal of China & Foreign Highway 40(4):92–96, DOI: https://doi.org/10.14048/j.issn.1671-2579.2020.04.019
Sun Y, Xu Y, Guo J, Cao H (2022) Constructional safety-based cost optimization for the buckle–anchorage system of cantilever casting concrete arch bridges. Journal of Bridge Engineering 27(5):04022022, DOI: https://doi.org/10.1061/(ASCE)BE.1943-5592.0001859
Tian Z, Chen D, Yan D, Chen Z (2004a) Study of key technology with construction control of steel box basket-handling arch bridge. China Journal of Highway and Transport 17(3):46–50, DOI: https://doi.org/10.3321/j.issn:1001-7372.2004.03.010 (in Chinese)
Tian Z, Chen D, Yan D, He B, Jiang T (2004b) Determination of the buckle cable force and precamber in the process of assembling arch ring segments of a long-span arch bridge. Journal of the China Railway Society 26(3):81–87, DOI: https://doi.org/10.3321/j.issn:1001-8360.2004.03.016 (in Chinese)
Tian ZC, Peng WP, Zhang JR, Jiang TY, Deng Y (2019) Determination of initial cable force of cantilever casting concrete arch bridge using stress balance and influence matrix methods. Journal of Central South University 26(11):3140–3155, DOI: https://doi.org/10.1007/s11771-019-4242-0
Wang F (2008) Analysis of long-span PC continuous rigid frame bridges construction control and concrete creep and shrinkage effect. MSc Thesis, Beijing Jiaotong University, Beijing, China (in Chinese)
Wang L (2021) Comprehensive simulation on shrinkage and creep effects of concrete in bridges during time-varying process. Journal of Highway and Transportation Research and Development 38(2):54–61, DOI: https://doi.org/10.3969/j.issn.1002-0268.2021.02.008 (in Chinese)
Xu Y, Shen C, Zhu Y, Wang C (2016) Improved iteration algorithm for determination of tension of fastening stays for cantilever construction of arch bridge. Bridge Construction 46(2):65–69 (in Chinese)
Yan D, Tian Z, Li X, Tu G (2004) Finite element method and application for the shrinkage and creep of concrete bridges. China Journal of Highway and Transport 17(2):55, DOI: https://doi.org/10.3321/j.issn:1001-7372.2004.02.012 (in Chinese)
Zhang W (2014) Study on the reasonable design state of long-span RC arch bridge utilizing combined construction method. MSc Thesis, Chongqing Jiaotong University, Chongqing, China (in Chinese)
Zhang D, He W, Jiang C, Yuan L (2012) Construction monitoring and control of cantilever casting of arch ring of new Midi bridge in Panzhihua. Bridge Construction 42(4):87–92 (in Chinese)
Zhang Y, Li C, Dong C (2004) Discussion on “Zero Moment Method” in the cable calculation of cable-stay. Journal of Transport Science and Engineering 20(1):15–18, DOI: https://doi.org/10.3969/j.issn.1674-599X.2004.01.004 (in Chinese)
Zhang J, Zheng J, Qin R (2002) A calculation method for optimizing the installation process of CFST arch bridge. Bridge Construction (1):52–54, DOI: https://doi.org/10.3969/j.issn.1003-4722.2002.01.016 (in Chinese)
Zhou Q, Zhou J, Chen J, Feng Y (2019) Improved algorithm of cable force optimization of one-time tensioning for arch bridge. Journal of Fuzhou University(Natural Science Edition) 47(3):412–416, DOI: https://doi.org/10.7631/issn.1000-2243.18213 (in Chinese)
Zhou Q, Zhou J, Ma H, Li X, Zhang L (2020) Improved algorithm of cable force for one-time cable tensioning on steel tube arch ribs with segmental hoisting. Journal of Traffic and Transportation Engineering 20(1):92–101, DOI: https://doi.org/10.19818/j.cnki.1671-1637.2020.01.007 (in Chinese)
Acknowledgments
The authors declare no conflict of interest. This work was conducted with financial support from the National Natural Science Foundation of China (Grant No.51478049, 52078058), Hunan Provincial Natural Science Foundation Project of China (Grant No.2022JJ50323), the Major Technological Achievements Transformation Program of Hunan Strategic emerging industries of China(Grant No.2017GK4034), and the Graduate Student Research Innovation Project of Hunan Province (CSUST)(Grant No. CX20200834). The supports are gratefully acknowledged.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Tian, Z., Cai, Y., Peng, W. et al. Multi-loop Nesting Algorithm and Response Analysis of Cable Forces of Long Span Cantilever Cast Arch Bridges during Construction. KSCE J Civ Eng 28, 699–714 (2024). https://doi.org/10.1007/s12205-023-1970-3
Received:
Revised:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s12205-023-1970-3