Abstract
This bibliographic study presents a historical perspective on Korea’s construction engineering and management (CEM) research and reports a 27-year analysis of papers written by Korean CEM researchers between 1993 and 2019. Frequency analysis of the collected papers was performed according to three main perspectives: the knowledge area, research topics, and methods. Knowledge area analysis shows that research fields have become more diversified and subdivided. Construction technology, cost management, and planning and schedule management have consistently maintained the top three positions for the past three decades. In addition, quality management, resource management, and risk management were also ranked high in the 2000s. In the 2010s, safety management, environmental management, quality management, and construction industry and business were ranked high. These changes reveal how Korean society’s and industry’s demands have changed over the years. Furthermore, the findings from keyword frequency analysis revealed that the focus of CEM research was mostly on cost and scheduling in the 1990s and on scheduling, risk, cost, and construction automation in the 2000s. The advent of Building Information Modeling (BIM) in the 2010s was an epochal change. This study found that the research methods frequently used by CEM researchers were simulation, optimization, regression analysis, computer vision and image processing, 3D modeling, case-based reasoning, genetic algorithm, case study, economic analysis, and artificial neural network.
Similar content being viewed by others
References
Abudayyeh O, Young AD, Jaselskis E (2004) Analysis of trends in construction research: 1985–2002. Journal of Construction Engineering and Management 130(3):433–439, DOI: https://doi.org/10.1061/(ASCE)0733-9364(2004)130:3(433)
Aghimien DO, Aigbavboa CO, Oke AE, Thwala WD (2020) Mapping out research focus for robotics and automaton research in construction-related studies - A bibliometric approach. Journal of Engineering, Design, and Technology 18(5):1063–1079, DOI: https://doi.org/10.1108/JEDT-09-2019-0237
Ahn CR, Lee S, Sun C, Jebelli H, Yang K, Choi B (2019) Wearable sensing technology applications in construction safety and health. Journal of Construction Engineering and Management 11:03119007, DOI: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001708
Akinlolu M, Haupt TC, Edwards DJ, Simpeh F (2020) A bibliometric review of the status and emerging research trends in construction safety management technologies. International Journal of Construction Management, DOI: https://doi.org/10.1080/15623599.2020.1819584
Cha H, Lee D (2014) A case study of time/cost analysis for aged-housing renovation using a pre-made BIM database structure. KSCE Journal of Civil Engineering 19:842–851, DOI: https://doi.org/10.1007/s12205-013-0617-1
Cha HS, Shin KY (2011) Predicting project cost performance level by assessing risk factors of building construction in South Korea. Journal of Asian Architecture and Building Engineering 10(2):437–444, DOI: https://doi.org/10.3130/jaabe.10.437
Chan APC, Chan DWM, Yeung JFY (2009) Overview of the application of “Fuzzy Techniques” in construction management research. Journal of Construction Engineering and Management 135(11):1241–1252, DOI: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000099
Chi S, Caldas CH (2012) Image-based safety assessment: Automated spatial safety risk identification of earthmoving and surface mining activities. Journal of Construction Engineering and Management 138(3):341–351, DOI: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000438
Chi S, Han S, Kim DY (2013) The relationship between unsafe working conditions and workers’ behavior and their impacts on injury severity in the US Construction Industry. Journal of Construction Engineering and Management-ASCE 139(7):826–838, DOI: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000657
Chi S, Han S, Kim DY, Shin Y (2015) Accident risk identification and its impact analyses for strategic construction safety management. Journal of Civil Engineering and Management 21(4):524–538, DOI: https://doi.org/10.3846/13923730.2014.890662
Choi B, Ahn S, Lee S (2017) Construction workers’ group norms and personal standards regarding safety behavior: Social identity theory perspective. Journal of Management in Engineering 33(4):04017001, DOI: https://doi.org/10.1061/(ASCE)ME.1943-5479.0000511
Construction Industry Institute (CII) (2022) Knowledge areas. Retrieved March 27, 2022, https://www.construction-institute.org/resources/knowledgebase/knowledge-areas
Dixit S, Mandal SN, Thanikal JV, Saurabh K (2019) Evolution of studies in construction productivity: A systematic literature review (2006–2017). Ain Shams Engineering Journal 10:555–564, DOI: https://doi.org/10.1016/j.asej.2018.10.010
Goetsch D (2013) Project management for construction. Pearson Gould F, Joyce N (2013) Construction project management. 4th Edition, Pearson
Halpin DW, Senior BA, Lucko G (2017) Construction management. 5th edition, Wiley
Ham Y-B, Kwon S-W, Noh J-H, Han J-G, Kim K-T (2006) Development of road stripe removing equipment using high-pressure water Jet. Automation in Construction 15(5):578–588, DOI: https://doi.org/10.1016/j.autcon.2005.06.017
Han SH, Park HK (2004) Categorical relationship approach as an alternative risk analysis for predicting cost contingency. KSCE Journal of Civil Engineering 8(2):173–180, DOI: https://doi.org/10.1007/BF02829117
Hasan A, Baroudi B, Elmualin A, Rameezdeen R (2018) Factors affecting construction productivity: A 30 year systematic review. Engineering, Construction and Architectural Management 25(7):916–937, DOI: https://doi.org/10.1108/ECAM-02-2017-0035
Hong T, Cho K, Hyun C, Han S (2011) Simulation-based schedule estimation model for ACS-based core wall construction of high-rise building. Journal of Construction Engineering and Management 137(6):393–402, DOI: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000300
Hong T, Hastak M (2005) MEMRRES: Model for evaluating maintenance, repair and rehabilitation strategies in concrete bridge decks. Civil Engineering and Environmental System 22(4):233–248, DOI: https://doi.org/10.1080/10286600500392742
Hong T, Kim J, Koo C (2012) LCC and LCCO2 analysis of green roofs in elementary schools with energy saving measures. Energy and Buildings 45:229–239, DOI: https://doi.org/10.1016/j.enbuild.2011.11.006
Hu X, Xia B, Skitmore M, Chen Q (2016) The application of case-based reasoning in construction management research: An overview. Automation in Construction 72(2):65–74, DOI: https://doi.org/10.1016/j.autcon.2016.08.023
Hwang S, Jebelli H, Choi B, Choi M, Lee S (2018) Measuring workers’ emotional state during construction tasks using wearable EEG. Journal of Construction Engineering and Management 144(7):04018050, DOI: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001506
Jeong W, Chang S, Son J, Lee J (2016) BIM-integrated construction operation simulation for just-in-time production management. Sustainability 8:1106, DOI: https://doi.org/10.3390/su8111106
Jeong J, Hong T, Ji C, Kim J, Lee M, Jeong K, Lee S (2017) An integrated evaluation of productivity, cost and CO2 emission between prefabricated and conventional columns. Journal of Cleaner Production 142:2393–2406, DOI: https://doi.org/10.1016/j.jclepro.2016.11.035
Ji SH, Park M, Lee HS (2011) Cost estimation model for building projects using case-based reasoning. Canadian Journal of Civil Engineering 38(5):570–581, DOI: https://doi.org/10.1139/l11-016
Jung W, Han SH (2017) Which risk management is most crucial for controlling project cost? Journal of Management in Engineering 33(5):04017029, DOI: https://doi.org/10.1061/(ASCE)ME.1943-5479.0000547
Jung Y, Joo M (2011) Building information modelling (BIM) framework for practical implementation. Automation in Construction 20(2): 126–133, DOI: https://doi.org/10.1016/j.autcon.2010.09.010
Jung N, Lee G (2019) Automated classification of building information modeling (BIM) case studies by BIM use based on natural language processing (NLP) and unsupervised learning. Advanced Engineering Informatics 41:100917, DOI: https://doi.org/10.1016/j.aei.2019.04.007
Jung M, Park M, Lee HS, Kim H (2016) Weather-delay simulation model based on vertical weather profile for high-rise building construction. Journal of Construction Engineering and Management 142(6): 04016007, DOI: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001109
Jung P, Seo J, Lee J (2009) Probabilistic value analysis methodology for public water supply systems. Civil Engineering and Environmental Systems 26(2):141–155, DOI: https://doi.org/10.1080/10286600801920688
Jung Y, Woo S (2004) Flexible work breakdown structure for integrated cost and schedule control. Journal of Construction Engineering and Management 130(5):616–625, DOI: https://doi.org/10.1061/(ASCE)0733-9364(2004)130:5(616)
Kang S, Kim S, Park K, Jung N, Kim W, Son J (2021) History of Construction Management in Korea. Korean Studies Information and Korea Institute of Construction Engineering and Management (in Korean)
Kang LS, Park IC, Lee BH (2001) Optimal schedule planning for multiple, repetitive construction process. Journal of Construction Engineering and Management 127(5):382–390, DOI: https://doi.org/10.1061/(ASCE)0733-9364(2001)127:5(382)
Kang LS, Paulson BC (1998) Information management to integrate cost and schedule for civil engineering projects. Journal of Construction Engineering and Management 124(5):381–389, DOI: https://doi.org/10.1061/(ASCE)0733-9364(1998)124:5(381)
Ke Y, Wang S, Chan APC, Cheung E (2009) Research trend of public-private partnership in construction journals. Journal of Construction Engineering and Management 135(10):1076–1086, DOI: https://doi.org/10.1061/(ASCE)0733-9364(2009)135:10(1076)
Khan N, Ali AK, Skibniewski MJ, Lee DY, Park C (2019) Excavation safety modeling approach using BIM and VPL. Advances in Civil Engineering, DOI: https://doi.org/10.1155/2019/1515808
Kim Y-S (1998) Development and application of an automatic crack and joint sealing system. KSCE Journal of Civil Engineering 2(4): 407–417
Kim Y-S (2002) A man-machine balanced rapid object model for automation of pavement crack sealing and maintenance. Canadian Journal of Civil Engineering 29(3):459–474, DOI: https://doi.org/10.1139/l02-018
Kim H, Anderson K, Lee S, Hildreth J (2013a) Generating construction schedules through automatic data extraction using open BIM (building information modeling) technology. Automation in Construction 35(11):285–295, DOI: https://doi.org/10.1016/j.autcon.2013.05.020
Kim S, Chin S, Kwon S (2019a) A discrepancy analysis of BIM-based quantity take-off for building interior components. Journal of Management in Engineering 35(3):0519001, DOI: https://doi.org/10.1061/(ASCE)ME.1943-5479.0000684
Kim Y-S, Haas CT, Greer R (1998) Path planning for machine vision assisted, teleoperated pavement crack sealer. Journal of Transportation Engineering 124(2):137–143, DOI: https://doi.org/10.1061/(ASCE)0733-947X(1998)124:2(137)
Kim J, Han S, Hyun CT (2019b) Identification and reduction of synchronous replacements in life-cycle cost analysis of equipment. Journal of Management in Engineering 35(1):04018058, DOI: https://doi.org/10.1061/(ASCE)ME.1943-5479.0000673
Kim YW, Han SH, Yi JS, Chang S (2016a) Supply chain cost model for prefabricated building material based on time-driven activity-based costing. Canadian Journal of Civil Engineering 43(4):287–293, DOI: https://doi.org/10.1139/cjce-2015-0010
Kim Y-S, Jung M-H, Cho Y-K, Lee J, Jung U (2007) Conceptual design and feasibility analyses of a robotic system for automated exterior wall painting. International Journal of Advanced Robotic Systems 4(4):1, DOI: https://doi.org/10.5772/5668
Kim KJ, Kim K (2010) Preliminary cost estimation model using case-based reasoning and genetic algorithms. Journal of Computing in Civil Engineering 24(6), DOI: https://doi.org/10.1061/(ASCE)CP.1943-5487.0000054
Kim K, Kim H, Kim H (2017) Image-based construction hazard avoidance system using augmented reality in wearable device. Automation in Construction 83:390–403, DOI: https://doi.org/10.1016/j.autcon.2017.06.014
Kim JI, Koo B, Suh S, Suh W (2016b) Integration of BIM and GIS for formal representation of walkability for safe routes to school programs. KSCE Journal of Civil Engineering 20(5):1669–1675, DOI: https://doi.org/10.1007/s12205-015-0791-4
Kim YS, Lee JB, Kim S-K, Lee JH (2009a) Development of an automated machine for PHC pile head grinding and crushing work. Automation in Construction 18(6):737–750, DOI: https://doi.org/10.1016/J.AUTCON.2009.02.008
Kim S, Lee S, Na YJ, Kim JT (2013b) Conceptual model for LCC-based LCCO2 analysis of apartment buildings. Energy and Buildings 64:285–291, DOI: https://doi.org/10.1016/j.enbuild.2013.05.016
Kim H, Lee HS, Park M, Chung B, Hwang S (2015) Information retrieval framework for hazard identification in construction. Journal of Computing in Civil Engineering 29(3):04014052
Kim H, Lee HS, Park M, Chung B, Hwang S (2016c) Automated hazardous area identification using laborers’ actual and optimal routes. Automation in Construction 65:21–32, DOI: https://doi.org/10.1016/j.autcon.2016.01.006
Kim T, Lim H, Cho H, Kang K-I (2014) Automated lifting system integrated with construction hoists for table formwork in tall buildings. Journal of Construction Engineering and Management 140(10), DOI: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000884
Kim GH, Park HY, Shin JM (2013c) An assessment of the accuracy of cost estimation using Building Information Modeling in design process. In Applied Mechanics and Materials (Vol. 291, pp. 2822–2825). Trans Tech Publications Ltd.
Kim H, Rauch AF, Haas CT (2003) Automated quality assessment of stone aggregates based on laser imaging and Neural Network. Journal of Computing in Civil Engineering 18(1):58–64, DOI: https://doi.org/10.1061/(ASCE)0887-3801(2004)18:1(58)
Kim S-K, Russel J (2003a) Framework for an intelligent earthwork system: Part I. System architecture. Automation in Construction 12(1):1–13, DOI: https://doi.org/10.1016/S0926-5805(02)00034-1
Kim S-K, Russel J (2003b) Framework for an intelligent earthwork system: Part II. System Architecture Automation in Construction 12(1):15–27, DOI: https://doi.org/10.1016/S0926-5805(02)00034-1
Kim S-K, Seo J, Russel JS (2012) Intelligent navigation strategies for an automated earthwork system. Automation in Construction 21:132–147, DOI: https://doi.org/10.1016/j.autcon.2011.05.021
Kim C, Son H, Kim H, Han S (2008) Applicability of flash laser distance and ranging to three-dimensional spatial information acquisition and modeling on a construction site. Canadian Journal of Civil Engineering 35(11), DOI: https://doi.org/10.1139/L08-082
Kim YS, Yoo HS, Lee JH, Han SW (2009b) Chronological development history of X-Y table based pavement crack sealers and research findings for practical use in the field. Automation in Construction 18(5):13–524, DOI: https://doi.org/10.1016/j.autcon.2009.02.007
Knutson K, Schexnayder C, Fiori C, Mayo R (2008) Construction management fundamentals. 2nd Edition, McGraw Hill
Koo B, Shin B (2018) Applying novelty detection to identify model element to IFC class misclassifications on architectural and infrastructure building information models. Journal of Computational Design and Engineering 5(4):391–400, DOI: https://doi.org/10.1016/j.jcde.2018.03.002
Koo B, Shin B, Lee G (2017) A cost-plus estimating framework for BIM related design and engineering services. KSCE Journal of Civil Engineering 21(7):2558–2566, DOI: https://doi.org/10.1007/s12205-017-1808-y
Koo C, Hong T, Kim J, Kim H (2015) An integrated multi-objective optimization model for establishing the low-carbon scenario 2020 to achieve the national carbon emissions reduction target for residential buildings. Renewable and Sustainable Energy Reviews 49:410–425, DOI: https://doi.org/10.1016/j.rser.2015.04.120
Kulkarni P, Londhe S, Deo M (2017) Artificial neural networks for construction management: A review. Journal of Soft Computing in Civil Engineering 1(2):70–88, DOI: https://doi.org/10.22115/SCCE.2017.49580
Kwon N, Cho J, Lee HS, Yoon I, Park M (2019) Compensation cost estimation model for construction noise claims using case-based reasoning. Journal of Construction Engineering and Management 145(8):04019047, DOI: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001675
Kwon N, Park M, Lee HS, Ahn J, Kim S (2017) Construction noise prediction model based on case-based reasoning in the preconstruction phase. Journal of Construction Engineering and Management 143(6): 04017008, DOI: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001291
Kwon S, Lee M, Lee M, Lee S, Lee J (2013) Development of optimized point cloud merging algorithms for accurate processing to create earthwork site models. Automation in Construction 35:618–624, DOI: https://doi.org/10.1016/j.autcon.2013.01.004
Le QT, Pedro A, Park CS (2015) A social virtual reality based construction safety education system for experiential learning. Journal of Intelligent & Robotic Systems 79(3):487–506, DOI: https://doi.org/10.1007/s10846-014-0112-z
Lee DE (2005) Probability of project completion using stochastic project scheduling simulation. Journal of Construction Engineering and Management 131(3):310–318, DOI: https://doi.org/10.1061/(ASCE)0733-9364(2005)131:3(310)
Lee G, Cho J, Ham S, Lee T, Lee G, Yun S-H, Yang H-J (2012a) A BIM- and sensor-based tower crane navigation system for blind lifts. Automation in Construction 26(10):1–10, DOI: https://doi.org/10.1016/j.autcon.2012.05.002
Lee G, Kim H-H, Lee C-J, Ham S-I, Yun S-H, Cho H, Kim BK, Kim GT, Kim K (2009) A laser-technology-based lifting-path tracking system for a robotic tower crane. Automation in Construction 18(7):865–874, DOI: https://doi.org/10.1016/j.autcon.2009.03.011
Lee S-K, Kim K-R, Yu J-H (2014) BIM and ontology-based approach for building cost estimation. Automation in Construction 41(5):96–105, DOI: https://doi.org/10.1016/j.autcon.2013.10.020
Lee C, Lee G (2014) Feasibility of beam erection with a motorized hook-block. Automation in Construction 41:25–32, DOI: https://doi.org/10.1016/j.autcon.2014.01.003
Lee C, Lee G, Park S, Cho J (2012b) Analysis of field applicability of the rotation-controllable tower-crane hook block. Automation in Construction 21:81–88, DOI: https://doi.org/10.1016/j.autcon.2011.05.015
Lee DE, Lim TK, Arditi D (2012c) Stochastic project financing analysis system for construction. Journal of Construction Engineering and Management 138(3):376–389, DOI: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000432
Lee J, Lorenc SJ, Bernold LE (1999) Saving lives and money with robotic trenching and pipe installation. Journal of Aerospace Engineering 12(2):43 9, DOI: https://doi.org/10.1061/(ASCE)0893-1321(1999)12:2(43)
Lee HS, Yi KJ (1999) Application of mathematical matrix to integrate project schedule and cost. Journal of Construction Engineering and Management 125(5):339–346, DOI: https://doi.org/10.1061/(ASCE)0733-9364(1999)125:5(339)
Lee J-H, Yoo H-S, Kim Y-S, Lee J-B, Cho M-Y (2006) The development of a machine vision-assisted teleoperated pavement crack sealer. Automation in Construction 5(5):616–626, DOI: https://doi.org/10.1016/j.autcon.2005.06.018
Liao TW, Egbelu PJ, Sarker BR, Leu SS (2011) Metaheuristics for project and construction management - A state-of-the-art review. Automation in Construction 20(5):491–505, DOI: https://doi.org/10.1016/j.autcon.2010.12.006
Mok KY, Shen GQ, Yang J (2015) Stakeholder management studies in mega construction projects: A review and future directions. International Journal of Project Management 33:446–457, DOI: https://doi.org/10.1016/j.ijproman.2014.08.007
Moon H, Dawood N, Kang L (2014) Development of workspace conflict visualization system using 4D object of work schedule. Advanced Engineering Informatics 28(1):50–65, DOI: https://doi.org/10.1016/j.aei.2013.12.001
Moon S, Seo J (2017) Virtual graphic representation of construction equipment for developing a 3D earthwork BIM. Journal of Civil Engineering and Management 23(8):977–984, DOI: https://doi.org/10.3846/13923730.2017.1348981
Moon S, Yang B, Kim J, Seo J (2010) Effectiveness of remote control for a concrete surface grinding machine. Automation in Construction 19(6):734–741, DOI: https://doi.org/10.1016/j.autcon.2010.03.001
Moon T, Shin DH (2018) Forecasting model of construction cost index based on VECM with search query. KSCE Journal of Civil Engineering 22(8):2726–2734, DOI: https://doi.org/10.1007/s12205-017-0897-y
Oberlender GD (2014) Project management for engineering and construction. 3rd Edition, McGraw Hill
Park HK, Han SH, Russell JS (2005) Cash flow forecasting model for general contractors using moving weights of cost categories. Journal of Management In Engineering 21(4):164–172, DOI: https://doi.org/10.1061/(ASCE)0742-597X(2005)21:4(164)
Park CS, Kim HJ (2013) A framework for construction safety management and visualization system. Automation in Construction 33:95–103, DOI: https://doi.org/10.1016/j.autcon.2012.09.012
Pham HC, Pedro A, Le QT, Lee DY, Park CS (2019) Interactive safety education using building anatomy modelling. Universal Access in the Information Society 18(2):269–285, DOI: https://doi.org/10.1007/s10209-017-0596-y
Pietroforte R, Stefani TP (2004) ASCE journal of construction engineering and management: Review of the Years 1983–2000. Journal of Construction Engineering and Management 130(3):440–448, DOI:https://doi.org/10.1061/(ASCE)0733-9364(2004)130:3(440)
Project Management Institute (PMI) (2016) Construction extension to the PMBOK Guide. Project Management Institute, Newtown Square, Pennsylvania, U.S.
Seo JW, Choi HH (2008) Risk-based safety impact assessment methodology for underground construction projects in Korea. Journal of Construction Engineering And Management 134(1):72–81, DOI: https://doi.org/10.1061/(ASCE)0733-9364(2008)134:1(72)
Seo J, Lee S, Kim J, Kim S-K (2011) Task planner design for a automated excavation system. Automation in Construction 20(7):954–966, DOI: https://doi.org/10.1016/j.autcon.2011.03.013
Son H, Kim C, Choi K (2010a) Rapid 3D object detection and modeling using range data from 3d range imaging camera for heavy equipment operation. Automation in Construction 19(7):898–906, DOI: https://doi.org/10.1016/j.autcon.2010.06.003
Son H, Kim C, Kim H, Han SH, Kim MK (2010b) Trend analysis of research and development on automation and robotics technology in the construction industry. KSCE Journal of Civil Engineering 13(2):131–139, DOI: https://doi.org/10.1007/s12205-010-0131-7
Sourani A, Sohail M (2013) The delphi method: Review and use in construction management research. International Journal of Construction Education and Research 11(1):54–76, DOI: https://doi.org/10.1080/15578771.2014.917132
Wang C, Cho YK, Kim C (2015) Automatic BIM component extraction from point clouds of existing buildings for sustainability applications. Automation in Construction 56:1–13, DOI: https://doi.org/10.1016/j.autcon.2015.04.001
Won J, Lee G (2016) How to tell if a BIM project is successful: A goal-driven approach. Automation in Construction 69:34–43, DOI: https://doi.org/10.1016/j.autcon.2016.05.022
Won J, Lee G, Dossick C, Messner J (2013) Where to focus for successful adoption of building information modeling within organization. Journal of Construction Engineering and Management 139(11): 04013014, DOI: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000731
Xu JW, Moon S (2013) Stochastic forecast of construction cost index using a cointegrated vector autoregression model. Journal of Management in Engineering 29(1):10–18, DOI: https://doi.org/10.1061/(ASCE)ME.1943-5479.0000112
Yang H, Yeung JFY, Chan APC, Chiang YH, Chan DWM (2010) A critical review of performance measurement in construction. Journal of Facilities Management 8(4):269–284, DOI: https://doi.org/10.1108/14725961011078981
Yeom D-J, Yoo H-S, Kim Y-S (2019) 3D Surround local sensing system H/W for intelligent excavation robot (IES). Journal of Asian Architecture and Building Engineering 18(5):439–456, DOI: https://doi.org/10.1080/13467581.2019.1679148
Yi JS (2006) The application of CBR for improving forecasting performance of periodic expenditures-focused on analysis of expenditure progress curves. Architectural Research 8(1):77–84
Yi CY, Gwak HS, Kim BS, Lee DE (2018) Stochastic multi-variate performance trade-off method for technical tender evaluation. KSCE Journal of Civil Engineering 22(11):4240–4253, DOI: https://doi.org/10.1007/s12205-018-2563-4
Yoo H, Kim Y-S (2017) Development of a 3D local terrain modeling system of intelligent excavation robot. KSCE Journal of Civil Engineering 21:565–578, DOI: https://doi.org/10.1007/s12205-016-0309-8
Yu YS, Choi JW, Kim TW, Lee C (2019) A risk assessment method using disaster influence factors on construction project. Journal of the Architectural Institute of Korea Planning & Design 35(6):3–12
Yun S-H, Jun K-H, Son C-B, Kim S-C (2014) Preliminary study for performance analysis of BIM-based building construction simulation system. KSCE Journal of Civil Engineering 18(3):531–540, DOI: https://doi.org/10.1007/s12205-014-0174-2
Zhou Z, Goh YM, Li Q (2014) Overview and analysis of safety management studies in the construction industry. Safety Science 72: 337–350
Zhou Z, Irizarry J, Li Q (2013a) Applying advanced technology to improve safety management in the construction industry: A literature review. Construction Management and Economics 31(6):606–622, DOI: https://doi.org/10.1080/01446193.2013.798423
Zhou J, Lov PED, Wang X, Teo KL, Irani Z (2013b) A review of methods and algorithms for optimizing construction scheduling. Journal of the Operation Research Society 64:1091–1105, DOI: https://doi.org/10.1057/jors.2012.174
Acknowledgments
This work was supported by a Korea Institute of Construction Engineering and Management (KICEM) Research Grant in 2021 and an Incheon National University Research Grant in 2021.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Kang, S., Kang, Y. & Kim, S. Long-term Trends in Construction Engineering and Management Research in Korea. KSCE J Civ Eng 27, 1883–1897 (2023). https://doi.org/10.1007/s12205-023-1249-8
Received:
Revised:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s12205-023-1249-8