A Robust Bi-objective Optimization Model for Resource Levelling Project Scheduling Problem with Discounted Cash Flows

  • Construction Management
  • Published:
KSCE Journal of Civil Engineering Aims and scope

Abstract

Due to limited financial resources and high costs of infrastructure projects, project stakeholders seek to gain maximum profits with optimal resource utilization as well as cost and time minimization. Therefore, this study presents a multi-mode resource-constrained project scheduling model considering the uncertain parameters of cost and time together with the goals of maximizing the net present value and minimizing resource usage fluctuation. Also, the assumptions related to the real-world projects regarding multi-mode activities, limitation of renewable resources, and the deadline of project are incorporated into the proposed model. Moreover, a robust scheduling method is presented to better deal with the inherent uncertainties of projects regarding cost and time. The model is solved with the exact method named lexicographic goal programming (LGP). Due to the NP-hardness of the problem, two metaheuristic algorithms named Non-dominated Sorting Genetic Algorithm (NSGA-II) and Multi-Objective Particle Swarm Optimization (MOPSO) are applied to solve various medium and large size problems. The obtained results indicate the high efficiency of the two metaheuristic algorithms in solving the problem and the better performance of the MOPSO algorithm compared with NSGA-II in terms of five indices. Furthermore, the model is implemented in an offshore equipment installation phase of a wellhead platform project. Finally, the sensitivity analysis of the proposed robust model is performed considering different conservation levels, and the results are evaluated by Monte Carlo simulation with three normal, uniform and triangular distributions. The findings demonstrate that the robustness of the model against the variations of uncertain parameters.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

Download references

Acknowledgments

Not Applicable

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Mohammad Khalilzadeh.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Banihashemi, S.A., Khalilzadeh, M. A Robust Bi-objective Optimization Model for Resource Levelling Project Scheduling Problem with Discounted Cash Flows. KSCE J Civ Eng 26, 2539–2554 (2022). https://doi.org/10.1007/s12205-022-0679-z

Download citation

  • Received:

  • Revised:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s12205-022-0679-z

Keywords

Navigation