Manpower Allocation Model for Construction Site Office Engineers based on Inherent Technical Risks

  • Construction Management
  • Published:
KSCE Journal of Civil Engineering Aims and scope

Abstract

Accurately predicting the costs of construction site overheads and preventing increases in unanticipated costs has a large effect on the cost competitiveness of a construction company. While site engineer costs account for the majority of construction site management costs, established manpower allocation standards will only account for the project size, and so poorly reflect inherent technological risks. Consequently, with risks mounting on-site as a project progresses, actual engineering manpower needs can exceed the planned ones. This study presents a method for improving the accuracy of construction site engineer allocation by reflecting such technological risks. Data from 31 case projects were analyzed to confirm problems regarding site engineer allocation and to quantify project risks. The regression models and correction rates to manpower allocation by engineering work type were derived from 28 of the case projects, while data from the three remaining projects were utilized to test the model’s validity. The results show strong correlation between the number of site engineers by work type and the project’s technical risks, affirming that these modes can be used to improve the accuracy of manpower estimation even in the early stages of construction planning.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Al-Bahar, J. F. (1990). “Systematic risk management approach for construction projects.” Journal of Construction Engineering and Management, ASCE, vol. 116, no. 3, pp. 533–546. DOI: 10.1061/(ASCE)0733-9364(1990)116:3(533).

    Article  Google Scholar 

  • Brown, E. C. (2004). Bidding, contracts, and claims, Ernest Brown & Company, CA, USA.

    Google Scholar 

  • Dey, P., Tabucanon, M., and Ogunlana, S. (1994). “Risk management planning for project control through risk analysis: A petroleum pipeline-laying project.” International Journal of Project Management, vol. 12, no. 1, pp. 23–3. DOI: 10.1016/0263-7863(94)90006-X.

    Article  Google Scholar 

  • Ehsan, N., Mirza, E., Alam, M., and Ishaque, A. (2010). “Risk management in construction industry.” 3rd International Conference on Computer Science and Information Technology, IEEE, Chengdu, China, vol. 9, pp. 16–21. DOI: 10.1109/ICCSIT.2010.5564663.

    Google Scholar 

  • Kangari, R. and Boyer, L. T. (1989). “Risk management by expert systems.” Project Management Journal, PMI, vol. 20, no. 1, pp. 40–48.

    Google Scholar 

  • Kim, J. S. (2014). A study of construction manager over input factor at construction project, MSc Thesis, Han-yang University, Seoul, Korea.

    Google Scholar 

  • Kwon, G. D., Kim, S. G., Sohn, H. W., Choi, J. H., and Lee, D. H. (2010). “Investigation on the manpower staffing plan utilizing density analysis method.” Proc. of the Korean Institute of Building Construction, KIBC, Seoul, Korea, vol. 10, no. 1, pp. 119–122.

    Google Scholar 

  • Kwon, M. H. (2015). A study on human resources planning for building projects, MSc Thesis, Han-yang University, Seoul Korea.

    Google Scholar 

  • Perry, J. G. and Hayes, R. W. (1985). “Risk and its management in construction projects.” Proceedings of the Institution for Civil Engineers, vol. 78, no. 3, pp. 499–521. DOI: 10.1680/iicep.1985.859.

    Article  Google Scholar 

  • Project Management Institute (2013). A guide to the project management body of knowledge, 5th Ed. PMI, PA, USA, p. 310.

    Google Scholar 

  • Tah, J. H. M. and Carr, V. (2010). “A proposal for construction project risk assessment using fuzzy logic.” Construction Management and Economics, vol. 18, no. 4, pp. 491–500. DOI: 10.1080/01446190050024905.

    Article  Google Scholar 

  • US DoD (2000). Risk management guide for DoD acquisition, 3rd Edition, US Department of Defense, Defense Systems Management College Press, Fort Belvoir, VA, USA.

    Google Scholar 

  • Vidivelli, B. and Jayasudha, K. (2016). “Analysis of major risks in construction projects.” Journal of Engineering and Applied Sciences, Asian Research Publishing Network, vol. 11, no. 11, pp. 6943–6950.

    Google Scholar 

  • Wideman, R. M. (1986). “The PMBOK report: PMI body of knowledge standards.” Project Management Journal, vol. 17, no. 3, pp. 15–24.

    Google Scholar 

  • Witt, R. C. (1993). “The optimal allocation of insurance related risks and costs in construction projects.” The Construction Industry Institute, Austin, TX, USA.

    Google Scholar 

  • Zavadskas, E. K. and Turskis, Z., and Tamosaitene, J. (2010). “Risk assessment of construction projects.” Jornal of Civil Engineering and Management, vol. 16, no. 1, pp. 33–46. DOI: 10.3846/jcem.2010.03

    Article  Google Scholar 

  • Zhi, H. (1995). “Risk management for overseas construction projects.” International Journal of Project Management, vol. 13, no. 4, pp. 231–237. DOI: 10.1016/0263-7863(95)00015-I.

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Yea Sang Kim.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Yang, W.J., Kim, Y.S. Manpower Allocation Model for Construction Site Office Engineers based on Inherent Technical Risks. KSCE J Civ Eng 23, 947–957 (2019). https://doi.org/10.1007/s12205-019-0663-4

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s12205-019-0663-4

Keywords

Navigation