Abstract
The construction industry is an important basis for the development of China’s economy. The accurate prediction of the cost of the project determines the profitability of the project and the decision-making of the construction. Therefore, this paper combines Random Forest with Support Vector Regression, and puts forward a method of construction cost prediction based on this method which we call it Random Support Vector Regressions (RSVRs). In this paper, 22 kinds of features which are related to cost are extracted, then we use Kernel Principal Component Analysis to fuse features which are less relevant to the cost. Then 11-dimensional features are put into RSVRs for modeling. From the theoretical point of view, RSVRs gives a novel work flow that is fusing features with low correlation firstly and then performing regression. In order to avoid the defects of the regression method, the two methods are fused, so that each method can maximize its advantages and make up for the disadvantages of the other method. From a practical point of view, RSVRs can be used to predict the project cost, which not only improves the accuracy, but also immediately obtains the predicted result. As long as the appropriate training data is selected, the method can predict the cost of any area and any building.
Similar content being viewed by others
References
Adeli, H. and Wu, M. (1998). “Regularization neural network for construction cost estimation.” Journal of Construction Engineering & Management, Vol. 124, No. 1, pp. 18–24, DOI: https://doi.org/10.1061/(ASCE)0733-9364(1998)124:1(18).
Ahmad, A. S., Hassan, M. Y., Abdullah, M. P., Rahman, H. A., Hussin, F., Abdullah, H., and Saidur, R. (2014). “A review on applications of ANN and SVM for building electrical energy consumption forecasting.” Renewable & Sustainable Energy Reviews, Vol. 33, No. 2, pp. 102–109, DOI: https://doi.org/10.1016/j.rser.2014.01.069.
Ahn, B. S., Cho, S. S., and Kim, C. Y. (2000). “The integrated methodology of rough set theory and artificial neural network for business failure prediction.” Expert Systems with Applications, Vol. 18, No. 2, pp. 65–74, DOI: https://doi.org/10.1016/s0957-4174(99)00053-6.
Ansari, H. R., Zarei, M. J., Sabbaghi, S., and Keshavarz, P. (2018). “A new comprehensive model for relative viscosity of various nanofluids using feed-forward back-propagation MLP neural networks.” International Communications in Heat & Mass Transfer, Vol. 91, pp. 158–164, DOI: https://doi.org/10.1016/j.icheatmasstransfer.2017.12.012.
Babatunde, Y. and Sui, P. L. (2015). “Construction industry in China.” Springer Singapore, Vol. 2015, pp. 31–43, DOI: https://doi.org/10.1007/978-981-287-362-0_3.
Bayram, S., Ocal, M. E., Oral, E. L., and Atis, C. D. (2016). “Comparison of Multi Layer Perceptron (MLP) and Radial Basis Function (RBF) for construction cost estimation: the case of Turkey.” Statyba, Vol. 22, No. 4, pp. 480–490, DOI: https://doi.org/10.3846/13923730.2014.897988.
Breiman, L. (2001). “Random forests.” Machine Learning, Vol. 45, No. 1, pp. 5–32, DOI: https://doi.org/10.1023/A:1010933404324.
Chang, C.-C. and Lin, C.-J. (2001). “LIBSVM: A library for support vector machines.” ACM Transactions on Intelligent Systems and Technology, Vol. 2, No. 3, pp. 1–27, DOI: https://doi.org/10.1145/1961189.1961199.
Dong, S. K., Sang, M. L., and Park, J. S. (2006). “Building lightweight intrusion detection system based on random forest.” Lecture Notes in Computer Science, Vol. 3973, pp. 224–230, DOI: https://doi.org/10.1007/11760191_33.
Hwang, B., Thomas, S. R., Haas, C. T., and Caldas, C. H. (2009). “Measuring the impact of rework on construction cost performance.” Journal of Construction Engineering and Management, Vol. 135, No. 3, pp. 187–198, DOI: https://doi.org/10.1061/(asce)0733-9364(2009)135:3(187).
Kong, F., Wu, X., and Cai, L. (2008). “Application of RS-SVM in construction project cost forecasting.” Proc., International Conference on Wireless Communications, NETWORKING and Mobile Computing, Vol. 2008, pp. 1–4, DOI: https://doi.org/10.1109/wicom.2008.1290.
Ma, Z., Wei, Z., Wu, S., and Zhe, L. (2011). “Application and extension of the IFC standard in construction cost estimating for tendering in China.” Automation in Construction, Vol. 20, No. 2, pp. 196–204, DOI: https://doi.org/10.1016/j.autcon.2010.09.017.
Ortiz, O., Castells, F., and Sonnemann, G. (2009). “Sustainability in the construction industry: A review of recent developments based on LCA.” Construction and Building Materials, Vol. 23, No. 1, pp. 28–39, DOI: https://doi.org/10.1016/j.conbuildmat.2007.11.012.
Phuc, D. and Phung, N. T. K. (2007). “Using naïve bayes model and natural language processing for classifying messages on online forum.” Proc., IEEE International Conference on Research, Innovation and Vision for the Future, pp. 247–252, DOI: https://doi.org/10.1109/rivf.2007.369164.
Polat, G. (2012). “ANN approach to determine cost contingency in international construction project.” Journal of Applied Management & Investments, Vol. 1, No. 2, pp. 195–201, DOI: https://doi.org/10.5130/ajceb.v3i1.2906.
Sun, W. (2013). “Comprehensive evaluation of grid project cost items based on fuzzy SVM.” Journal of Information & Computational Science, Vol. 10, No. 13, pp. 4067–4075, DOI: https://doi.org/10.12733/jics20102092.
Wang, X. (2018). “Forecasting construction project cost based on BP neural network.” Proceedings from 10th International Conference on Measuring Technology and Mechatronics Automation, IEEE, pp. 420–423, DOI: https://doi.org/10.1109/icmtma.2018.00109.
Wang, X. J., Zhang, X. H., and Ling, W. X. (2000). “Research on Bayes method for estimating project cost.” Journal of Wuhan University of Hydraulic & Electric Engineering, pp. 23–29, DOI: https://doi.org/10.3969/j.issn.1671-8844.2000.03.028.
Williams, T. P. (2002). “Predicting completed project cost using bidding data.” Construction Management & Economics, Vol. 20, No. 3, pp. 225–235, DOI: https://doi.org/10.1080/01446190110112838.
Xue, X., Shen, Q., Wang, Y., and Lu, J. (2008). “Measuring the productivity of the construction industry in china by using DEA-based malmquist productivity indices.” Journal of Construction Engineering & Management, Vol. 134, No. 1, pp. 64–71, DOI: https://doi.org/10.1061/(ASCE)0733-9364(2008)134:1(64).
Yang, L., Dai, Y. L., Nan, L. I., and Management, S. O. (2014). “A forecasting method for project cost probability at completion based on monte carlo simulation.” Computer Simulation, pp. 38–43, DOI: https://doi.org/10.3969/j.issn.1006-9348.2014.09.066.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Zhang, Y., Fang, S. RSVRs based on Feature Extraction: A Novel Method for Prediction of Construction Projects’ Costs. KSCE J Civ Eng 23, 1436–1441 (2019). https://doi.org/10.1007/s12205-019-0336-3
Received:
Revised:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s12205-019-0336-3