Resource-Constrained Time-Cost Tradeoff for Repetitive Construction Projects

  • Construction Management
  • Published:
KSCE Journal of Civil Engineering Aims and scope

Abstract

The time-cost tradeoff problem is to find optimal combinations of construction options with the objective of minimizing project time and cost. In order to search for such a set of optimal solutions, the total time and cost of projects needs to be calculated properly. In repetitive construction projects (RCPs), due to division of work into several units and involvement of many resources for activities completion, scheduling is unique and more complicated. Scheduling method in this paper besides addressing common constraints such as precedence relationships, required lead time and lag distance between activities, enables project managers to consider all resources and their shortages in scheduling. To raise the practicality of model, in addition to direct and indirect costs, resource idle cost is considered as a cost element in estimating total cost of project. The time variant multi-objective particle swarm optimization is applied to find non-dominated solutions on the basis of minimizing time and cost of project. An application example is presented at the end to illustrate the performance of the model. This research presents a resource-constrained time-cost tradeoff model to find the optimal set of crew combinations for project activities in RCPs, considering time and cost simultaneously.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Gholamreza Heravi.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Heravi, G., Moridi, S. Resource-Constrained Time-Cost Tradeoff for Repetitive Construction Projects. KSCE J Civ Eng 23, 3265–3274 (2019). https://doi.org/10.1007/s12205-019-0151-x

Download citation

  • Received:

  • Revised:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s12205-019-0151-x

Keywords

Navigation