Dynamic Control of Resource Logistics Quality to Eliminate Process Waste in Rebar Placement Work

  • Sungkon Moon
  • Payam R. Zekavat
  • Leonhard E. Bernold
  • Pekka Leviakangas
Construction Management

Abstract

Output-oriented resource control in the traditional planning methods is still prevalent in construction industry. It frequently causes unpredictable wastes leading to deterioration of the sequenced supply chains. On the other hand, the use of feed-forward control offers the opportunity for prevention by ensuring the high quality of necessary process resources. This paper, in turn, presents a dynamic control approach that highlights the effectiveness of feed-forward control on minimising process wastes. The field experiment in this paper presents the rebar supply and placement on an actual construction site. It aims to measure the responsiveness of pre-controlled resources to ever-changing process performance. Collected data during this field study provided the basic data for establishing statistical relationships between resource logistics quality and process performance. The research experiments found out two of the critical resource logistics: (1) Available number of workers; and (2) Distance between resource and final place. Finally the proactive control on these entities resulted in a dramatic reduction of process waste, leading to the improvement of productive work rate (31.0 to 53.3%). The main contribution of the research lies on the first-hand investigation from a very probable situation, which would benefit practical engineers and construction managers.

Keywords

process waste logistics supply chan management rebar placement performance 

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Abellan-Nebot, J. V., Liu, J., and Subirón, F. R. (2012). “Quality prediction and compensation in multi-station machining processes using sensorbased fixtures.” Robotics and Computer-Integrated Manufacturing, Vol. 28, No. 2, pp. 208–219, DOI: 10.1016/j.rcim.2011.09.001.CrossRefGoogle Scholar
  2. Al-Bahar, J. and Crandall, K. (1990). “Systematic risk management approach for construction projects.” Journal of Construction Engineering and Management, Vol. 116, No. 3, pp. 533–546, DOI: 10.1061/(ASCE)0733-9364(1990)116:3(533).CrossRefGoogle Scholar
  3. Ashuri, B. and Tavakolan, M. (2011). “Fuzzy enabled hybrid genetic algorithm–particle swarm optimization approach to Solve TCRO problems in construction project planning.” Journal of Construction Engineering and Management, Vol. 138, No. 9, pp. 1065–1074, DOI: 10.1061/(ASCE)CO.1943-7862.0000513.CrossRefGoogle Scholar
  4. Bagad, V. S. (2008). Total Quality Management, Technical Publications, India.Google Scholar
  5. Baker, E. R., Fisher, M. J., and Goethert, W. (2007). Basic Principles and Concepts for Achieving Quality, Software Engineering Process Management, Carnegie Mellon University, Pittsburgh, US, CMU/SEI-2007-TN-002.Google Scholar
  6. Barhak, J., Djurdjanovic, D., Spicer, P., and Katz, R. (2005). “Integration of reconfigurable inspection with stream of variations methodology.” International Journal of Machine Tools and Manufacture, Vol. 45, Nos. 4-5, pp. 407–419, DOI: 10.1016/j.ijmachtools.2004.09.011.CrossRefGoogle Scholar
  7. Bernold, L. E. and AbouRizk, S. M. (2010). Managing Performance in Construction, John Wiley & Sons, Inc., New Jersey, US.CrossRefGoogle Scholar
  8. Brown, S. M. and Seidner, C. J. (1998). Evaluating corporate training: models and issues, Kluwer Academic Publishers, AA Dordrecht, the Netherlands.CrossRefGoogle Scholar
  9. Cervin, A., Eker, J., Bernhardsson, B., and Årzén, K. (2002). “Feedback–Feedforward scheduling of control Tasks.” Real-Time Systems, Vol. 23, Nos. 1-2, pp. 25–53, DOI: 10.1023/A:1015394302429.CrossRefzbMATHGoogle Scholar
  10. Cooper, J. and Fisher, M. (2002). Software Acquisition Capability Maturity Model (SA-CMM ) Version 1.03 (CMU/SEI-2002-TR-010, ADA399794), Software Engineering Institute, Carnegie Mellon University, Pittsburgh, USA.CrossRefGoogle Scholar
  11. Crosby, P. B. (1995). Quality Without Tears: The Art of Hassle-Free Management, McGraw-Hill, New York City, NY, USA.Google Scholar
  12. Deming, W. E. (2000). Out of the crisis, MIT Press, Cambridge, Massachusetts, USA.Google Scholar
  13. Feigenbaum, A. V. (1991). Total quality control, McGraw-Hill, New York City, NY, USA.Google Scholar
  14. Flores-Cerrillo, J. and MacGregor, J. F. (2004). “Control of batch product quality by trajectory manipulation using latent variable models.” Journal of Process Control, Vol. 14, No. 5, pp. 539–553, DOI: 10.1016/j.jprocont.2003.09.008.CrossRefGoogle Scholar
  15. Garvin, D. A. (1984). “What does product quality really mean?.” Sloan Management Review, Vol. 26, pp. 25–45, Cambridge, MA, US.Google Scholar
  16. Garvin, D. A. (1987). “Competing on the eight dimensions of quality.” Harvard Business Review, Vol. 65, No. 6, pp. 101–109, Brighton, Boston, US.Google Scholar
  17. Garvin, D. A. (1988). Managing quality: The strategic and competitive edge, Free Press, New York, USA.Google Scholar
  18. Harry, M. J. and Schroeder, R. R. (2000). Six sigma: The breakthrough management strategy revolutionizing the world's top corporations, Currency, Crown Business, Danvers, MA, USA.Google Scholar
  19. Hou, L., Zhao, C., Wu, C., Moon, S., and Wang, X. (2016). “Discrete firefly algorithm for scaffolding construction scheduling.” Journal of Computing in Civil Engineering, Vol 31, No. 3, pp. 04016064, DOI: 10.1061/(ASCE)CP.1943-5487.0000639.CrossRefGoogle Scholar
  20. Jarkas, A. M. (2012). “Influence of buildability factors on rebar installation labor productivity of columns.” Journal of Construction Engineering and Management, Vol. 138, No. 2, pp. 258–267, DOI: 10.1061/(ASCE)CO.1943-7862.0000425.CrossRefGoogle Scholar
  21. Kerzner, H. (2009). Project Management: A Systems Approach to Planning, Scheduling, and Controlling, John Wiley & Sons, Hoboken, New Jersey, USA.Google Scholar
  22. Lewis, J. P. (2001). Project planning, scheduling, and control: A handson guide to bringing projects in on time and on budget, McGraw-Hill, New York City, NY, USA.Google Scholar
  23. Mahadevan, B. (2007). Operations Management: Theory and Practice, Pearson Education, London, UK.Google Scholar
  24. Mascio, R. D. and Barton, G. W. (2001). “The economic assessment of process control quality using a Taguchi-based method.” Journal of Process Control, Vol. 11, No. 1, pp. 81–88, DOI: 10.1016/S0959-1524(99)00069-4.CrossRefGoogle Scholar
  25. Mehta, P. V. (2004). An Introduction to Quality Assurance for the Retailers, iUniverse, Bloomington, IN, US.Google Scholar
  26. Moon, S. (2014). Dynamic Control of Supply Chain Quality to Improve Process Performance in Construction, PhD Thesis, University of New South Wales, Sydney, Australia.Google Scholar
  27. Moon, S. and Bernold, L. E. (2013). “Causality analysis for dynamic quality control in construction.” International Journal of Engineering and Technology, Vol. 5, No. 5, pp. 541–545, DOI: 10.7763/IJET.2013.V5.614.CrossRefGoogle Scholar
  28. Moon, S., Forlani, J., Wang, X., and Tam, V. (2016b). “Productivity study of the scaffolding operations in liquefied natural gas plant construction: Ichthys Project in Darwin, Northern Territory, Australia.” Journal of Professional Issues in Engineering Education and Practice, Vol. 142, No. 4, pp. 04016008, DOI: 10.1061/(ASCE) EI.1943-5541.0000287.CrossRefGoogle Scholar
  29. Moon, S., Han, S., Zekavat, P. R., Bernold, L. E., and Wang, X. (2016c). “Process-waste reduction in the construction supply chain using proactive information network.” Concurrent Engineering, Vol. 25, No. 2, pp. 123–135, DOI: 10.1177/1063293X16667451.CrossRefGoogle Scholar
  30. Moon, S., Zekavat, P., and Bernold, L. E. (2015). “Dynamic Control of Construction Supply Chain to Improve Labor Performance.” Journal of Construction Engineering and Management, Vol. 141, No. 6, pp. 05015002, DOI: 10.1061/(ASCE)CO.1943-7862.0000970.CrossRefGoogle Scholar
  31. Moon, S., Zekavat, R., and Bernold, E. (2016a). “Dynamic quality control of process resource to improve concrete supply Chain.” Journal of Construction Engineering and Management, Vol. 143, No. 5, DOI: 10.1061/(ASCE)CO.1943-7862.0001270.Google Scholar
  32. Nandong, J. (2015). “A unified design for feedback-feedforward control system to improve regulatory control performance.” International Journal of Control, Automation, and Systems, Vol. 13, No. 1, pp. 91–98, DOI: 10.1007/s12555-014-0090-8.CrossRefGoogle Scholar
  33. Rosenau, M. D. and Githens, G. D. (2011). Successful Project Management: A Step-by-Step Approach with Practical Examples, John Wiley & Sons, Hoboken, New Jersey, USA.Google Scholar
  34. Ross, P. J. (1996). Taguchi techniques for quality engineering: Loss function, orthogonal experiments, parameter and tolerance design, McGraw-Hill, New York City, NY, USA.Google Scholar
  35. salim, m. and bernold, l. e. (1994). “effects of design integrated process planning on productivity in rebar placement.” Journal of Construction Engineering and Management, Vol. 120, No. 4, pp. 720–738, DOI: 10.1061/(ASCE)0733-9364(1994)120:4(720).CrossRefGoogle Scholar
  36. Shingo, S. (1986). Zero Quality Control: Source Inspection and the Poka-Yoke System, Taylor & Francis, Milton Park, Didcot, UKGoogle Scholar
  37. Smith, G. F. (1998). Quality problem solving, ASQ Quality Press, Milwaukee, WI, USA.Google Scholar
  38. Tah, J. H. M. and Carr, V. (2000). “A proposal for construction project risk assessment using fuzzy logic.” Construction Management and Economics, Vol. 18, No. 4, pp. 491–500, DOI: 10.1080/01446190050024905.CrossRefGoogle Scholar
  39. Tang, S. L., Ahmed, S. M., Aoieong, R. T., and Poon, S. W. (2005). Construction Quality Management, Hong Kong University Press, Hong Kong.Google Scholar
  40. Tennant, G. (2001). Six Sigma: SPC and TQM in manufacturing and services, Gower, Aldershot, UK.Google Scholar
  41. Thomas, B., Soleimani-Mohsenib, M., and Fahlén, P. (2005). “Feedforward in temperature control of buildings.” Energy and Buildings, Vol. 37, No. 7, pp. 755–761, DOI: 10.1016/j.enbuild.2004.10.002.CrossRefGoogle Scholar
  42. Webber, L. and Wallace, M. (2011). Quality Control for Dummies, Wiley, New Jersey, USA.Google Scholar

Copyright information

© Korean Society of Civil Engineers 2018

Authors and Affiliations

  • Sungkon Moon
    • 1
  • Payam R. Zekavat
    • 2
  • Leonhard E. Bernold
    • 3
  • Pekka Leviakangas
    • 4
    • 5
  1. 1.Dept. of Civil and Construction Engineering, and Centre for Sustainable Infrastructure, School of EngineeringSwinburne University of TechnologyMelbourneAustralia
  2. 2.School of Computing, Engineering & MathematicsWestern Sydney UniversityParramattaAustralia
  3. 3.Dept. of Civil EngineeringTechnical University Federico Santa MariaValparaisoChile
  4. 4.VTT Technical Research Centre Ltd.EspooFinland
  5. 5.Industrial Engineering and ManagementUniversity of OuluOuluFinland

Personalised recommendations