Abdullah, M. R., Abdul Azis, A. A., and Rahman, I. A. (2011). “Potential effects on large mara construction projects due to construction delay.” International Journal of Integrated Engineering, Vol. 1, No. 2, pp. 53–62.
Google Scholar
Al-Najjar, J., Kumaraswamy, M., and Enshassi, A. (2009). “Delays and cost overruns in the construction projects in the gaza strip.” Journal of Financial Management of Property and Construction, Vol. 14, No. 2, 126–151, DOI: 10.1108/13664380910977592.
Article
Google Scholar
Ameh, O. J., Soyingbe, A. A., and Odusami, K. T. (2010). “Significant factors causing cost overruns in telecommunication projects in nigeria.” Journal of Construction in Developing Countries, Vol. 15, No. 2, pp. 49–67.
Google Scholar
Association of Project Management (APM). (1995). Body of Knowledge (Version 2), APM, Princes Risborough, U.K.
Avots, I. (1969). “Why does project management fail?.” California Management Review, Vol. 12, No. 1, pp. 77–82, DOI: 10.2307/41164208.
Article
Google Scholar
Azhar, N., Farooqui, R. U., and Ahmed, S. M. (2008). “Cost overrun factors in construction industry of pakistan.” International Conference on Construction in Developing Countries, pp. 499–508.
Google Scholar
Belout, A. (1998). “Effects of human resource management on project effectiveness and success: Toward a new conceptual framework.” International Journal of Project Management, Vol. 16, No. 1, pp. 21–26, DOI: 10.1016/S0263-7863(97)00011-2.
Article
Google Scholar
Belout, A. and Gauvreau, C. (2004). “Factors influencing project success: The impact of human resource management.” International Journal of Project Management, Vol. 22, No. 1, pp. 1–11, DOI: 10.1016/S0263-7863(03)00003-6.
Article
Google Scholar
Bentler, P. M. and Chou, C. (1987). “Practical issues in structural modeling.” Sociological Methods Research, Vol. 16, No. 1, pp. 78–117.
Article
Google Scholar
Bowersox (1974). Logistical management, McGraw-Hill international editions, Columbus, O.H..
Brown, A. and Adams, J. (2000). “Measuring the effect of project management on construction outputs: A new approach.” International Journal of Project Management, Vol. 18, No. 5, pp. 327–335, DOI: 10.1016/S0263-7863(99)00026-5.
Article
Google Scholar
Bryde, D. J. (2003). “Modelling project management performance.” International Journal of Quality and Reliability Management, Vol. 20, No. 2, pp. 229–254, DOI:10.1108/02656710310456635.
Article
Google Scholar
Byrne, B. M. (2002). Structural Equation Modeling with AMOS-Basic Concepts, Applications, and Programming, Mahwah NJ: Lawrence Erlbaum, Mahwah, N.J..
Google Scholar
Chan, D. W. M. and Kumaraswamy, M. M. (2002). “Compressing construction durations: Lessons learned from hong kong building projects.” International Journal of Project Management, Vol. 20, No. 1, pp. 23–35.
Article
Google Scholar
Chan, S. and Park, M. (2005). “Project cost estimation using principal component regression.” Construction Management and Economics, Vol. 23, pp. 295–304, DOI: 10.1080/01446190500039812.
Article
Google Scholar
Chua, D. K. H., Kog, Y. C., and Loh, P. K. (2015). “Critical success factors for different project objectives.” Journal of Construction Engineering and Management, Vol. 125, No. 3, pp. 142–150, DOI: 10.1061/(ASCE)0733-9364(1999)125:3(142).
Article
Google Scholar
Construction Industry Institute (CII). (2011). Benchmarking and Metrics: Project Level Survey (small project questionnaire). (Version 11)
Construction Industry Institute (CII). (2012). Benchmarking and Metrics: Project Level Survey (large project questionnaire). (Version 11)
Contreras, J., Hare, E., Escamilla, M., and Raventos, H. (2011). “Principal domains of quantitative anxiety trait in subjects with lifetime history of mania.” Journal of Affective Disorders, Vol. 136, Nos. 1–2, pp. 69–75, DOI: 10.1016/j.jad.2011.06.036.
Article
Google Scholar
Cooper, M. C., Lambert, D. M., and Pagh, J. D. (1997). “Supply chain management: More than a new name for logistics.” International Journal of Logistics Management, Vol. 8, No. 1, pp. 1–14, DOI: 10.1108/09574099710805556.
Article
Google Scholar
Deborah L. Bandalos. (1997). “Assessing sources of error in structural equation models: The effects of sample size, reliability, and model misspecification.” Structural Equation Modeling A Multidisciplinary Journal, Vol. 4, No. 3, pp. 177–192.
Article
Google Scholar
Ehrlenspiel, E. I. K., Kiewert, D. I. A., and Lindemann, D. I. U. (2007). Cost-efficient design., Vol. 142, No. 5, p. 56, DOI: 10.1115/1.802507.
Google Scholar
Ekambaram Palaneeswaran, Peter E. D. Love, Mohan M. Kumaraswamy, and Thomas, S. T. Ng. (2008). “Mapping rework causes and effects using artificial Neural Networks.” Building Research and Information, Vol. 36, No. 5, pp. 450–465.
Article
Google Scholar
Fabi, B. and Pettersen, N. (1992). “Human resource management practices in project management.” International Journal of Project Management, Vol. 10, No. 2, pp. 81–88, DOI: 10.1016/0263-7863 (92)90060-M.
Article
Google Scholar
Frigenti, E. and Comninos, D. (2006). The Practice of Project Management: A Guide to the Business-Focused Approach, Kogan Page, Limited.
Google Scholar
Gayen, A. K. (1951). “The frequency distribution of the product-moment correlation coefficient in random samples of any size drawn from Non-normal Universes.” Biometrika, Vol. 38, Nos. 1–2, pp. 219–247, DOI: 10.2307/2332329.
MathSciNet
Article
MATH
Google Scholar
George, J. (1982). “Editorial: More than management.” History News, Vol. 37, No. 3, pp. 6–6.
Google Scholar
Hair, J. F., Anderson, R. E., Tatham, R. L., and Black, W. (1998). “Multivariate data analysis.” Technometrics, Vol. 31, No. 3, pp.103–104.
Google Scholar
Hair, J. F., Ringle, C. M., and Sarstedt, M. (2013). “Partial least squares structural equation modeling: Rigorous applications, better results and higher acceptance.” Long Range Planning, Vol. 46, Nos. 1–2, pp. 1–12, DOI: 10.1016/j.lrp.2013.01.001.
Article
Google Scholar
Hasanzadeh, M., Tavakolirad, Z., and Abbasi, P. (2011). “Review of affective factors on cost, time and quality of construction projects in developing countries.” Emergency Management and Management Sciences (ICEMMS), 2nd IEEE International Conference, pp. 858–861, DOI: 10.1109/ICEMMS.2011.6015818.
Google Scholar
HO (2013). Handbook of univariate and multivariate data analysis with spss, second edition.
Holmes, L. (2010). The Dominance of Management: A Participatory Critique, Ashgate.
Google Scholar
Husin, H. N., Adnan, H., and Jusoff, K. (2008). “Management of safety for quality construction.” Journal of Sustainable Development, Vol. 1, No. 3, p. 41, DOI: 10.5539/jsd.v1n3p41.
Google Scholar
Ibbs, C. W. and Kwak, Y. H. (2000). “Assessing project management maturity.” Project Management Journal, Vol. 31, No. 1, pp. 32–43.
Article
Google Scholar
Ibbs, W. and Reginato, J. (2002). Quantifying the Value of PM, PMI (Project Management Institute).
Google Scholar
Idiake, J. E., Oke, A. A., and Shittu, A. A. (2015). “Analysis of cost and quality relationship of private building projects in Abuja, Nigeria.” International Journal of Construction Engineering and Management, Vol. 4, No. 2, pp. 35–43.
Google Scholar
Institute, P. M. (2008). A Guide to the Project Management Body of Knowledge, Project Management Institute.
Google Scholar
Iyer, K. C. and Jha, K. N. (2005). “Factors affecting cost performance: Evidence from indian construction projects.” International Journal of Project Management, Vol. 23, No. 4, pp. 283–295, DOI: 10.1016/j.ijproman.2004.10.003.
Article
Google Scholar
Jackson and Dennis, L. (2003). “Revisiting sample size and number of parameter estimates: Some support for the n:q hypothesis.” Structural Equation Modeling A Multidisciplinary Journal, Vol. 10, No. 1, pp. 128–141.
MathSciNet
Article
Google Scholar
Jr, J. Art Gowan, and R. G. Mathieu. (2005). “The importance of management practices in IS project performance.” Journal of Enterprise Information Management, Vol. 18, No. 2, pp. 235–255, DOI: 10.1108/17410390510579936.
Article
Google Scholar
Jolliffe, I. (2002). Principal Component Analysis, Springer New York.
MATH
Google Scholar
Jones, N. L. (2013). Leadership and Elizabethan Culture (Jepson Studies in Leadership), Palgrave Macmillan, Basing stoke.
Google Scholar
Josephson, P., Larsson, B., and Li, H. (2002). “Illustrative benchmarking rework and rework costs in swedish construction industry.” Journal of Management in Engineering, Vol. 18, No. 2, pp. 76–83, DOI: 10.1061/(ASCE)0742-597X(2002)18:2(76).
Article
Google Scholar
Kaming, P. F., Olomolaiye, P. O., Holt, G. D., and Harris, F. C. (1997). “Factors influencing construction time and cost overruns on highrise projects in Indonesia.” Construction Management and Economics, Vol. 15, No. 1, pp. 83–94, DOI: 10.1080/014461997373132.
Article
Google Scholar
Kang, Y., Dai, J., Mulva, S., and Choi, J. (2014). “The 10–10 performance assessment campaign: New theories regarding the benchmarking of capital project performance.” American Society of Civil Engineers, pp. 2335–2344, DOI: 10.1061/9780784413517.237.
Google Scholar
Litke, H. D. (1995). Projekt Management: Methoden, Techniken, Verhaltensweisen.
Google Scholar
Long, D. N., Ogunlana, S. O., and Lan, D. T. X. (2004). “A study on project success factors in large construction projects in vietnam.” Engineering Construction and Architectural Management, Vol. 11, No. 6, pp. 404–413.
Article
Google Scholar
Long, L. H., Lee, Y. D., and Lee, J. Y. (2008). “Construction management delay and cost overruns in vietnam large construction projects: A comparison with other selected countries.” Ksce Journal of Civil Engineering, Vol. 12, No. 12, pp. 367–377.
Google Scholar
Mansfield, N. R., Ugwu, O. O., Doran, T., Mansfield, N. R., Ugwu, O. O., and Doran, T. (1994). “Causes of delay and cost overruns in nigerian construction projects.” International Journal of Project Management, Vol. 12, No. 4, pp. 254–260, DOI: 10.1016/0263-7863(94)90050-7.
Article
Google Scholar
Meeampol, S. and Ogunlan, S. O. (2006). “Factors affecting cost and time performance on highway construction projects: Evidence from Thailand.” Journal of Financial Management of Property and Construction, Vol. 11, No. 1, pp. 3–20, DOI: 10.1108/13664380680001076.
Article
Google Scholar
Memon, A. H., Rahman, I. A., Abdullah, M. R., and Azis, A. A. A. (2010). “Factors affecting construction cost in mara large construction project: Perspective of project management consultant.” International Journal of Sustainable Construction Engineering and Technology, Vol. 1, No. 2, pp. 41–54.
Google Scholar
Minglong, Wu. (2010). The structural equation model: AMOS operation and Application, Chongqing University Press.
Google Scholar
Morris and Jonathan (1999). Improving construction design: The lean thinking paradigm, Doctoral dissertation, Cranfield University, Cranfield, England.
Nega, F. (2008). Causes and Effects of Cost Overrun on Public Building Construction Projects in Ethiopia. Master thesis, Addis Ababa University, Addis Ababa, Ethiopia
Google Scholar
Ogunlana, S., Li, H., and Sukhera, F. (2003). “System dynamics approach to exploring performance enhancement in a construction organization.” Journal of Construction Engineering and Management, Vol. 129, No. 5, pp. 528–536, DOI: 10.1061/(ASCE)0733-9364 (2003)129:5(528).
Article
Google Scholar
Okpala, D. C. and Aniekwu, A. N. (1988). “Causes of high costs of construction in Nigeria.” Journal of Construction Engineering and Management, Vol. 114, No. 2, pp. 233–244, DOI: 10.1061/(ASCE) 0733-9364(1988)114:2(233).
Article
Google Scholar
Oyedele, L., Jaiyeoba, B., and Fadeyi, M. (2003). “Design factors influencing quality of building projects in nigeria: Consultants' perception.” Australasian Journal of Construction Economics and Building, Vol. 3, No. 2, pp. 25–32, DOI: 10.5130/ajceb.v3i2.2916.
Article
Google Scholar
Pearson, K. (1895). “Note on regression and inheritance in the case of two parents.” Proceedings of the Royal Society of London, Vol. 58, pp. 240–242, DOI: 10.1098/rspl.1895.0041.
Article
Google Scholar
Persson, F. and Olhager, J. (2002). “Performance simulation of supply chain designs.” International Journal of Production Economics, Vol. 77, No. 3, pp. 231–245. DOI: 10.1016/S0925-5273(00)00088-8.
Article
Google Scholar
Pither, R. and Duncan, W. R. (1998). ISO 10006: Risky Business, PM Network.
Google Scholar
PMI (Project Management Institute). (2004). A Guide to the Project Management Body of Knowledge, Third Edition.
PMI (Project Management Institute). (2009). PMI today, Four Campus Boulevard, New Town Square.
Qureshi, T. M., Warraich, A. S., and Hijazi, S. T. (2009). “Significance of Project Management Performance Assessment (PMPA) Model.” International Journal of Project Management, Vol. 27, No. 4, pp. 378–388, DOI: 10.1016/j.ijproman.2008.05.001.
Article
Google Scholar
Reina, P. and Angelo, W. J. (2002). “Megaprojects need more study up front to avoid cost overruns.” Engineering News-Record, Vol. 249, No. 3, p. 11.
Google Scholar
Sambasivan, M. and Soon, Y. W. (2007). “Causes and effects of delays in malaysian construction industry.” International Journal of Project Management, Vol. 25, No. 5, pp. 517–526, DOI: 10.1016/j.ijproman.2006.11.007.
Article
Google Scholar
Schultz, R. L. and Pinto, J. K. (1987). “Strategy and tactics in a process model of project implementation.” Interfaces, Vol. 17, No. 17, pp. 34–46, DOI: 10.1287/inte.17.3.34.
Article
Google Scholar
Schumacher, R. E. and Lomax, R. G. (2004). A Beginner’s Guide to Structural Equation Modeling, Lawrence Erlbaum Associates, New Jersey.
Google Scholar
Sin, K. W. (1999). Factors affecting the process quality in design, Construction and maintenance of building projects in hong kong.
Google Scholar
Stretton, A. (2015). Series on general management functions and activities, and their relevance to the management of projects, Pm World Journal.
Google Scholar
Tenenhaus, M., Vinzi, V. E., Chatelin, Y. M., and Lauro, C. (2005). “PLS path modeling.” Computational Statistics and Data Analysis, Vol. 48, No. 1, pp. 159–205, DOI: 10.1016/j.csda.2004.03.005.
MathSciNet
Article
MATH
Google Scholar
Thomas, J. and Mullaly, M. (2007). “Understanding the value of project management: First Steps on an international investigation in search of value.” Project Management Journal, 38(3), 74–89. DOI: 10.1002/pmj.20007.
Article
Google Scholar
Tsui, A. S. (1990). “A multiple-constituency model of effectiveness: An empirical examination at the human resource subunit level.” Administrative Science Quarterly, Vol. 35, No. 3, pp. 458–483, DOI: 10.2307/2393313.
Article
Google Scholar
Ulrich, D. (1987). “Organizational capability as a competitive advantage: Human resource professionals as strategic partners.” Human Resource Planning, Vol. 10, No. 4, p. 169.
Google Scholar
UNRWA (United Nations Relief and Works Agency). (2006). Projects Completion Reports, Gaza, Palestine.
Westerveld, E. (2003). “The project excellence model: linking success criteria and critical success factors.” International Journal of Project Management, Vol. 21, No. 6, pp. 411–418, DOI: 10.1016/S0263-7863(02)00112-6.
Article
Google Scholar
Zulu, S. (2007). Impact of Project Management on Project Performance: A structural Equation Modeling Approach, Proceedings Of 23rd Annual ARCOM Conference, pp. 3–5.
Google Scholar