Skip to main content
Log in

Information technology utilization to improve project team-owner relationship and project performance

  • Construction Management
  • Published:
KSCE Journal of Civil Engineering Aims and scope

Abstract

While prior research suggested a positive relationship between the use of particular Information Technology (IT) tools and organizational performance, very few published studies have attempted to assess the influence of IT usage on project team-owner relationship and the performance of capital facility projects. Thus, the first objective of this study is to validate a framework for assessing the associations among IT usage, project team-owner relationship, and project performance. The second objective is to examine the moderating role of environmental turbulence in the relationship between project team-owner relationship and project performance. This study empirically investigated a sample of projects in the Taiwanese construction industry. The results show that IT utilization can enhance the relationship with the owner and then improve project performance. The findings also indicate that the positive relationship between project team-owner relationship and project performance depends on environmental turbulence.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Abduh, M. and Skibniewski, M. J. (2004). “Electronic networking technologies in construction.” Journal of Construction Research, Vol. 5, No. 1, pp. 17–42, DOI: 10.1142/S1609945104000036.

    Article  Google Scholar 

  • Aiken, L. S. and West, S. G. (1991). Multiple regression: Testing and interpreting interactions, Sage Publications, Thousand Oaks, California, USA.

    Google Scholar 

  • Akhtar, S., Ding, D. Z., and Ge, G. L. (2008). “Strategic HRM practices and their impact on company performance in Chinese enterprises.” Human Resource Management, Vol. 47, No. 1, pp. 15–32, DOI: 10.1002/hrm.20195.

    Article  Google Scholar 

  • Bagozzi, R. P., Yi, Y., and Phillips, L. W. (1991). “Assessing construct validity in organizational research.” Administrative Science Quarterly, Vol. 36, No. 3, pp. 421–458, DOI: 10.2307/2393203.

    Article  Google Scholar 

  • Barczak, G., Hultink, E. J., and Sultan, F. (2008). “Antecedents and consequences of information technology usage in NPD: A comparison of Dutch and U.S. companies.” Journal of Product Innovation Management, Vol. 25, No. 6, pp. 620–631, DOI: 10.1111/j.1540-5885.2008.00326.x.

    Article  Google Scholar 

  • Blery, E. and Michalakopoulos, M. (2006). “Customer relationship management: A case study of a Greek Bank.” Journal of Financial Services Marketing, Vol. 11, No. 2, pp. 116–124, DOI: 10.1057/palgrave.fsm.4760014.

    Article  Google Scholar 

  • Boar, B. H. (1997). Strategic Thinking for Information Technology: How to Build the IT Organization for the Information Age, John Wiley and Sons, Inc., New York, USA.

    Google Scholar 

  • Chen, C. (2007). “Information technology, organizational structure, and new product development — The mediating effect of cross-functional team interaction.” IEEE Transactions on Engineering Management, Vol. 54, No. 4, pp. 687–698, DOI: 10.1109/TEM.2007.906831.

    Article  Google Scholar 

  • Dewitt, T. and Jones, G. (2001). “The role of information technology in the organization: A review, model and assessment.” Journal of Management, Vol. 27, No. 3, pp. 313–346, DOI: 10.1177/014920630102700306.

    Article  Google Scholar 

  • Dow, D., Samson, D., and Ford, S. (1999). “Exploding the myth: Do all quality management practices contribute to superior quality performance.” Production and Operations Management, Vol. 8, No. 1, pp. 1–27, DOI: 10.1111/j.1937-5956.1999.tb00058.x.

    Article  Google Scholar 

  • Fornell, C. and Larcker, D. F. (1981). “Evaluating structural equation models with unobservable variables and measurement error.” Journal of Marketing Research, Vol. 18, No. 1, pp. 39–50, DOI: 10.2307/3151312.

    Article  Google Scholar 

  • Fredrickson, J. W. and Mitchell, T. R. (1984). “Strategic decision processes: Comprehensive and performance within an industry with an unstable environment.” Academy of Management Journal, Vol. 27, No. 2, pp. 399–423, DOI: 10.2307/255932.

    Article  Google Scholar 

  • Goldenberg, B. (2000). “What is CRM? What is an e-customer? Why you need them now?.” Proc., DCI Customer Relationship Management Conference, Boston, Massachusetts, USA.

    Google Scholar 

  • Goodrum, P. M. and Gangwar, M. (2004). “The relationship between changes in equipment technology and wages in the US construction industry.” Construction Management and Economics, Vol. 22, No. 3, pp. 291–301, DOI: 10.1080/0144619032000116543.

    Article  Google Scholar 

  • Hair, J. F., Black, W. C., Babin, B. J., Anderson, R. E., and Tatham, R. L. (2006). Multivariate Data Analysis, 6th Ed., Prentice-Hall, Upper Saddle River, New Jersey, USA.

    Google Scholar 

  • Hewage, K. N., Ruwanpura, J. Y., and Jergeas, G. F. (2008). “IT usage in Alberta’s building construction projects: Current status and challenges.” Automation in Construction, Vol. 17, No. 8, pp. 940–947, DOI: 10.1016/j.autcon.2008.03.002.

    Article  Google Scholar 

  • Jap, S. D. (2001). “Perspectives on joint competitive advantage in buyersupplier relationships.” International Journal of Research in Marketing, Vol. 18, No. 1, pp. 19–35, DOI: 10.1016/S0167-8116(01)00028-3.

    Article  Google Scholar 

  • Keary, M. Y. (2012). “Knowledge development and social change through technology: Emerging studies.” Online Information Review, Vol. 36, No. 4, pp. 621–622, DOI: 10.4018/978-1-60960-507-0.

    Article  Google Scholar 

  • Kumashiro, M. E. (1999). Measuring Automation and Integration in the Construction Industry, MS thesis, The University of Texas at Austin, Austin, Texas, USA.

    Google Scholar 

  • Larson, E. W. and Gobeli, D. H. (1988). “Organizing for product development projects.” Journal of Product Innovation Management, Vol. 5, pp. 180–190, DOI: 10.1111/1540-5885.530180.

    Article  Google Scholar 

  • Lee, H. and Choi, B. (2003). “Knowledge management enablers, processes, and organizational performance: An integrative view and empirical examination.” Journal of Management Information Systems, Vol. 20, No. 1, pp. 179–228, DOI: 10.1.1.100.4494.

    Article  Google Scholar 

  • Li, T. and Cavusgil, T. (2000). “Decomposing the effects of market knowledge competence in new product export.” European Journal of Marketing, Vol. 34, No. 1, pp. 57–80, DOI: 10.1108/03090560010306205.

    Article  Google Scholar 

  • Lin, R., Chen, R., and Chiu, K. K. (2010). “Customer relationship management and innovation capability: An empirical study.” Industrial Management & Data Systems, Vol. 110, No. 1, pp. 111–133, DOI: 10.1108/02635571011008434.

    Article  Google Scholar 

  • Low, S. P. and Quek, T. C. (2006). “Environmental factors and performance of project managers in the construction industry.” International Journal of Project management, Vol. 24, No. 1, pp. 24–37, DOI: 10.1016/j.ijproman.2005.06.001.

    Google Scholar 

  • Mitropoulos, P. and Tatum, C. B. (2000). “Forces driving adoption of new information technologies.” Journal of Construction Engineering and Management, Vol. 126, No. 5, pp. 340–348, DOI: 10.1061/(ASCE)0733-9364(2000)126:5(340).

    Article  Google Scholar 

  • Müller, R. and Turner, J. R. (2007). “Matching the project manager’s leadership style to project type.” International Journal of Project Management, Vol. 25, No. 1, pp. 21–32, DOI: 10.1016/j.ijproman.2006.04.003.

    Article  Google Scholar 

  • O’Connor, J. T., Kumashiro, M. E., Welch, K. A., Hadeed, S. P., Braden, K. E., and Deogaonkar, M. J. (2000). “Project- and phase-level technology use metrics for capital facility projects.” Report No.16, Center for Construction Industry Studies, Austin, Texas, USA.

    Google Scholar 

  • Patel, P. C. and Cardon, M. S. (2010). “Adopting HRM practices and their effectiveness in small firms facing product-market competition.” Human Resource Management, Vol. 49, No. 2, pp. 265–290, DOI: 10.1002/hrm.20346.

    Article  Google Scholar 

  • Pavlou, P. A. and El Sawy, O. A. (2011). “Understanding the elusive black box of dynamic capabilities.” Decision Sciences, Vol. 42, No. 1, pp. 239–273, DOI: 10.1111/j.1540-5915.2010.00287.x.

    Article  Google Scholar 

  • Peansupap, V. and Walker, D. (2005). “Factors affecting ICT diffusion: a case study of three large Australian construction contractors.” Engineering, Construction and Architectural Management, Vol. 12, No. 1, pp. 21–37, DOI: 10.1108/09699980510576871.

    Article  Google Scholar 

  • Pheng, L. S. and Chuan, Q. T. (2006). “Environmental factors and work performance of project managers in the construction industry.” International Journal of Project Management, Vol. 24, No. 1, pp. 24–37, DOI: 10.1016/j.ijproman.2005.06.001.

    Article  Google Scholar 

  • Revilla, E., Rodríguez-Prado, B., and Prieto, I. (2009). “Information technology as knowledge management enabler in product development: empirical evidence.” European Journal of Innovation Management, Vol. 12, No. 3, pp. 346–363, DOI: 10.1108/14601060910974228.

    Article  Google Scholar 

  • Rindova, P. V. and Kotha, S. (2001). “Continuous “morphing”: Competing through dynamic capabilities, form, and function.” Academy of Management Journal, Vol. 44, No. 6, pp. 1263–1280, DOI: 10.2307/3069400.

    Article  Google Scholar 

  • Sexton, M. and Barrett, P. (2004). “The role of technology transfer in innovation within small construction firms.” Engineering, Construction and Architectural Management, Vol. 11, No. 5, pp. 342–348, DOI: 10.1108/09699980410558539.

    Article  Google Scholar 

  • Simmons, P. (1994). “Measurement and the evaluation of I.T. investments.” Proc., IEEE 2nd International Software Metrics Symposium, London, England, pp. 74–83.

    Google Scholar 

  • Slater, S. F. and Narver, J. C. (1995). “Market orientation and the learning organization.” Journal of Marketing, Vol. 59, No. 3, pp. 63–74, DOI: 10.2307/1252120.

    Article  Google Scholar 

  • Tan, K. S., Chong, S. C., Lin, B., and Eze, U. C. (2009). “Internet-based ICT adoption: Evidence from Malaysian SMEs.” Industrial Management & Data Systems, Vol. 109, No. 2, pp. 224–244, DOI: 10.1108/02635570910930118.

    Article  Google Scholar 

  • Teece, D., Pisano, G., and Shuen, A. (1997). “Dynamic capabilities and strategic management,” Strategic Management Journal, Vol. 18, No. 7, pp. 509–533, DOI: 10.1002/(SICI)1097-0266(199708)18:7<509::3.0.CO;2-Z.

    Article  Google Scholar 

  • Tse, R. Y. and Choy, L. (2005). “Is IT training in construction industry useful?.” Journal of Construction Research, Vol. 6, No. 1, pp. 1–13, DOI: 10.1142/S1609945105000249.

    Article  Google Scholar 

  • Van den Bosch, F., Volberda, H., and De Boer, M. (1999). “Co-evolution of firm absorptive capacity and knowledge environment: Organizational forms and combinative capabilities.” Organizational Science, Vol. 10, No. 4, pp. 551–568, DOI: 10.1287/orsc.10.5.551.

    Article  Google Scholar 

  • Webb, R. M., Smallwood, J., and Haupt, T. C. (2004). “The potential of 4D CAD as a tool for construction management.” Journal of Construction Research, Vol. 5, No. 1, pp. 43–60, DOI: 10.1142/S1609945104000048.

    Article  Google Scholar 

  • Yang, L. R. (2008). “Exploring the links between task-level automation usage and project satisfaction.” Automation in Construction, Vol. 17, No. 4, pp. 450–458, DOI: 10.1016/j.autcon.2007.08.001.

    Article  Google Scholar 

  • Yang, L. R., O’Connor, J. T., and Wang, C. C. (2006). “Technology utilization on different sizes of projects and associated impacts on composite project success.” International Journal of Project Management, Vol. 24, No. 2, pp. 96–105, DOI: 10.1016/j.ijproman.2005.06.008.

    Article  Google Scholar 

  • Yang, L., O’Connor, J. T., and Huang, C. (2007). “Comparison of technology utilization and benefits in Taiwanese and U.S. industries.” Journal of Management in Engineering, Vol. 23, No. 3, pp. 147–155, DOI: 10.1061/(ASCE)0742-597X(2007)23:3(147).

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Li-Ren Yang.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Yang, LR., Huang, CF. Information technology utilization to improve project team-owner relationship and project performance. KSCE J Civ Eng 20, 48–57 (2016). https://doi.org/10.1007/s12205-015-0147-0

Download citation

  • Received:

  • Revised:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s12205-015-0147-0

Keywords

Navigation