Abstract
This paper examines the effects of changes in the construction economy (e.g., upturns and downturns) on labor operating rates, labor productivity, and cost productivity. The paper investigates the effects of sharp changes in Korea’s construction economy over the last two decades by using the well accepted leading and coincident economic indices such as the annual contract volume and total employment at the national level and assesses operating rates, labor productivity, and cost productivity for three groups of workers working with reinforced concrete (rebar workers, carpenters, and concrete workers) by using the work sampling method, the job site operation measurement, and interviews with field personnel. The results have important implications for effective job site management strategies and provide some guidelines for responding to changes in workers’ behaviors and attitudes.
Similar content being viewed by others
References
Adrian, J. (1987). Construction productivity improvement, Elsevier, New York, NY.
Allmon, E., Hass, C. T., Borcherding, J. D., and Goodrum, P. M. (2000). “U.S. construction labor productivity trends, 1970–1998.” Journal of Construction Engineering and Management, ASCE, Vol. 126, No. 2, pp. 97–104.
Ang, A. H. S. and Tang, W. H. (1975). Probability concepts in engineering planning and design, Vol. 1, Wiley, New York, NY.
Arditi, David. (1985). “Construction productivity improvement.” Journal of Construction Engineering and Management, ASCE, Vol. 111, No. 1, pp. 1–14.
CAK (2009). Investigation report of construction laborer’s wages: 1994–2008, Construction Association of Korea 〈http://www.cak.or.kr/〉 (accessed 2009).
Goodrum, P. and Haas, C. (2002). “Partial factor productivity and equipment technology change at activity level in U.S. construction industry.” Journal of Construction Engineering and Management, ASCE, Vol. 128, No. 6, pp. 463–472.
Goodrum, M. P. and Hass, T. C. (2004). “Long-term impact of equipment technology on labor productivity in the U.S. construction industry at the activity level.” Journal of Construction Engineering and Management, ASCE, Vol. 130, No. 1, pp. 124–133.
Halpin, D. W. and Riggs, L. S. (1992). Planning and analysis of construction operations, John Wiley & Son, Inc, New York, 270–283.
Hanna, A., Russell, J., Nordheim, E., and Bruggink, M. (1999). “Impact of change orders on labor efficiency for electrical construction.” Journal of Construction Engineering and Management, ASCE, Vol. 125, No. 4, pp. 224–232.
KSIS (2009). Construction, Ports, Housing, Water supply service: Construction contract, 1985–2008, Statistical database administered by the National Statistical Office of Korea, Korea Statistical Information Service 〈http://www.kosis.kr/〉.
Korean Statistical Information Service. (Accessed 2009). Employment, Labor and Wages, 1985–2008, Statistical database administered by the National Statistical Office of Korea, 〈http://www.kosis.kr/〉.
Portas, J. and AbouRizk, S. (1997). “Neural network model for estimating construction productivity.” Journal of Construction Engineering and Management, ASCE, Vol. 123, No. 4, pp. 399–410.
Rojas, M. E. (2008). Construction productivity: A practical guide for building and electrical contractors, J. Ross Publishing, 1st Ed.
Rojas, M. E. and Aramvareekul, P. (2003a). “Labor Productivity Drivers and Opportunities in the Construction Industry.” Journal of Management in Engineering, ASCE, Vol. 19, No. 2, pp. 78–82.
Rojas, M. E. and Aramvareekul, P. (2003b). “Is construction labor productivity really declining?.” Journal of Construction Engineering and Management, ASCE, Vol. 129, No. 1, pp. 41–46.
Song, L. and AbouRizk, S. M. (2008). “Labor productivity modeling using historical data.” Journal of Construction Engineering and Management, ASCE, Vol. 20, No. 5, pp. 786–794.
Sonmez, R. and Rowings, J. (1998). “Construction labor productivity modeling with neural networks.” Journal of Construction Engineering and Management, ASCE, Vol. 124, No. 6, pp. 498–504.
Thomas, H., Maloney, W., Horner, R., Smith, G., Handa, V., and Sanders, S. (1990). “Modeling construction labor productivity.” Journal of Construction Engineering and Management, ASCE, Vol. 116, No. 4, pp. 705–726.
Thomas, H. and Napolitan, C. (1995). “Quantitative effects of construction changes on labor productivity.” Journal of Construction Engineering and Management, ASCE, Vol. 121, No. 3, pp. 290–296.
Thomas, H., Sanvido, V., and Sanders, S. (1989). “Impact of material management on productivity-A case study.” Journal of Construction Engineering and Management, ASCE, Vol. 115, No. 3, pp. 370–384.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Son, CB., Jang, WS. & Lee, DE. Effect of changes in the construction economy on worker’s operating rates and productivity. KSCE J Civ Eng 18, 419–429 (2014). https://doi.org/10.1007/s12205-014-0125-y
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s12205-014-0125-y