Construction project risk management in Singapore: Resources, effectiveness, impact, and understanding

  • Construction Management
  • Published:
KSCE Journal of Civil Engineering Aims and scope

Abstract

While previous studies have focused on the need for Project Risk Management (PRM), highlighting its potential benefits, resources invested in PRM have been rarely identified. This study aims to investigate the resource allocation, effectiveness, impact and understanding of construction PRM in Singapore. To achieve the objectives, a questionnaire survey was conducted with professionals and 43 complete questionnaires were returned. The results revealed that higher proportion of costs was invested in PRM than time and labor resources, and that more resources invested would not necessarily lead to a higher level of PRM effectiveness and greater assurance with the achievement of project objectives. Also, the results showed the low-level understanding of PRM in the survey firms and suggested that the overall impact of PRM on project outcomes differed according to levels of understanding. Despite the low-level understanding, all the nine PRM principles and guidelines were significantly agreed. Hence, this study provides a clear picture of PRM in the Singapore construction industry. The findings of this study can help practitioners to better implement PRM and assure the achievement of project outcomes.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Adibi, S. (2007). Industry should embrace risk management tools, New York Construction News (Retrieved on 12 February, 2011) 〈http://newyork.construction.com/opinions/bottomline/archive/2007/06.asp〉.

    Google Scholar 

  • Ahmed, S. M., and Azhar, S. (2004). “Risk Management in the Florida Construction Industry.” Proceedings of the 2nd Latin American and Caribbean Conference for Engineering and Technology, Miami, Florida, USA.

    Google Scholar 

  • Akintoye, A. S. and MacLeod, M. J. (1997). “Risk analysis and management in construction.” International Journal of Project Management, Vol. 15, No. 1, pp. 31–38.

    Article  Google Scholar 

  • Ali, R. (2000). The application of risk management in infrastructure construction projects, MSc Thesis, Nanyang Technological University, Singapore.

    Google Scholar 

  • Chan, F. T. and Mak, Y. C. (2000). Systematic construction risk management: A case study of chinatown MRT station and clarke quay tunnelling Works, MSc Thesis, Nanyang Technological University, Singapore.

    Google Scholar 

  • Chitakornkijsil, P. (2010). “Enterprise risk management.” International Journal of Organizational Innovation, Vol. 3, No. 2, pp. 309–337.

    Google Scholar 

  • CIDB (2004). Managing construction procurement risks, Construction Industry Development Board, Pretoria.

    Google Scholar 

  • Dafikpaku, E. (2011). “The strategic implications of enterprise risk management: A framework.” 2011 Enterprise Risk Management Symposium, Chicago, Illinois, USA.

    Google Scholar 

  • Deng, X. and Low, S. P. (2013). “Understanding the critical variables affecting the level of political risks in international construction projects.” KSCE Journal of Civil Engineering, KSCE, Vol. 17, No. 5, pp. 895–907.

    Article  Google Scholar 

  • Edwards, P. J. and Bowen, P. A. (1998). “Risk and risk management in construction: A review and future directions for research.” Engineering Construction and Architectural Management, Vol. 5, No. 4, pp. 339–349.

    Article  Google Scholar 

  • Flanagan, R. and Norman, G. (1993). Risk management and construction, Blackwell, Oxford.

    Google Scholar 

  • Hilson, D. (1998). “Project risk management: Future developments.” International Journal of Project and Business Risk Management, Vol. 2, No. 2, pp. 1–11.

    Google Scholar 

  • Hlaing, N. N., Singh, D., Tiong, R. L. K., and Ehrlich, M. (2008). “Perceptions of Singapore construction contractors on construction risk identification.” Journal of Financial Management of Property and Construction, Vol. 13, No. 2, pp. 85–95.

    Article  Google Scholar 

  • ISO (2009). ISO 31000:2009 risk management-principles and guidelines, International Organization for Standardization, Geneva, Switzerland.

    Google Scholar 

  • Khan, A. I. and Narasimhan, V. L. (2006). Study of risk aspects in building construction projects, MSc Thesis, Nanyang Technological University, Singapore.

    Google Scholar 

  • Klemetti, A. (2006). Risk management in construction project networks, Helsinki University of Technology, Helsinki.

    Google Scholar 

  • KPMG (2010). The business case for a risk executive, KPMG (Retrieved on 11 April, 2011) 〈http://www.kpmg.com/AU/en/IssuesAndInsights/ArticlesPublications/Documents/The-business-case-for-a-risk-executive.pdf〉.

    Google Scholar 

  • Kutsch, E. and Hall, M. (2010). “Deliberate ignorance in project risk management.” International Journal of Project Management, Vol. 28, No. 3, pp. 245–255.

    Article  Google Scholar 

  • Ling, F. Y. Y., Low, S. P., Wang, S. Q., and Lim, H. H. (2009). “Key project management practices affecting Singaporean firms’ project performance in China.” International Journal of Project Management, Vol. 27, No. 1, pp. 59–71.

    Article  Google Scholar 

  • Low, S. P., Liu, J. Y., and He, S. Q. (2009). “External risk management practices of Chinese construction firms in Singapore.” KSCE Journal of Civil Engineering, KSCE, Vol. 13, No. 2, pp. 85–95.

    Article  Google Scholar 

  • Mills, A. (2001). “A systematic approach to risk management for construction.” Structural Survey, Vol. 19, No. 5, pp. 245–252.

    Article  Google Scholar 

  • Mok, C. K., Tummala, V. M. R., and Leung, H. M. (1997). “Practices, barriers and benefits of risk management process in building services cost estimation.” Construction Management and Economics, Vol. 15, No. 2, pp. 161–175.

    Article  Google Scholar 

  • Ock, J.-H. and Han, S.-H. (2010). “Measuring risk-associated activity’s duration: A fuzzy set theory application.” KSCE Journal of Civil Engineering, KSCE, Vol. 14, No. 5, pp. 663–671.

    Article  Google Scholar 

  • Pennock, M. and Haimes, Y. (2002). “Principles and guidelines for project risk management.” Systems Engineering, Vol. 5, No. 2, pp. 89–108.

    Article  Google Scholar 

  • Rahman, M. M. and Kumaraswamy, M. M. (2002). “Risk management trends in the construction industry: Moving towards joint risk management.” Engineering, Construction and Architectural Management, Vol. 9, No. 2, pp. 131–151.

    Article  Google Scholar 

  • Raz, T. and Michael, E. (2001). “Use and benefits of tools for project risk management.” International Journal of Project Management, Vol. 19, No. 1, pp. 9–17.

    Article  Google Scholar 

  • Royer, P. S. (2000). “Risk management: The undiscovered dimension of project management.” Project Management Journal, Vol. 31, No. 1, pp. 6–13.

    Google Scholar 

  • Sharman, R. (2002). “Enterprise risk management-The KPMG approach.” British Journal of Administrative Management, Vol. 31, pp. 26–28.

    Google Scholar 

  • Simister, S. J. (1994). “Usage and benefits of project risk analysis and management.” International Journal of Project Management, Vol. 12, No. 1, pp. 5–8.

    Article  Google Scholar 

  • Tang, W., Duffield, C., and Young, D. (2006). “Partnering mechanism in construction: An empirical study on the Chinese construction industry.” Journal of Construction Engineering and Management, Vol. 132, No. 3, pp. 217–229.

    Article  Google Scholar 

  • Thevendran, V. and Mawdesley, M. J. (2004). “Perception of human risk factors in construction projects: an exploratory study.” International Journal of Project Management, Vol. 22, No. 2, pp. 131–137.

    Article  Google Scholar 

  • Uher, T. E. and Toakley, A. R. (1999). “Risk management in the conceptual phase of a project.” International Journal of Project Management, Vol. 17, No. 3, pp. 161–169.

    Article  Google Scholar 

  • Wang, S. Q., Dulaimi, M. F., and Aguria, M. Y. (2004). “Risk management framework for construction projects in developing countries.” Construction Management and Economics, Vol. 22, No. 3, pp. 237–252.

    Article  MATH  Google Scholar 

  • Ward, S. and Chapman, C. (2003). “Transforming project risk management into project uncertainty management.” International Journal of Project Management, Vol. 21, No. 2, pp. 97–105.

    Article  Google Scholar 

  • Wiguna, I. P. A. and Scott, S. (2006). “Relating risk to project performance in Indonesian building contracts.” Construction Management and Economics, Vol. 24, No. 11, pp. 1125–1135.

    Article  Google Scholar 

  • Woo, K. W. and Tee, H. L. A. (2001). Delays of construction projects in singapore. MSc Thesis, Nanyang Technological University, Singapore.

    Google Scholar 

  • Zhao, X., Hwang, B. G., and Low, S. P. (2013). “Developing fuzzy enterprise risk management maturity model for construction firms.” Journal of Construction Engineering and Management, Vol. 139, No. 9, pp. 1179–1189.

    Article  Google Scholar 

  • Zou, P. X. W., Zhang, G., and Wang, J. (2007). “Understanding the key risks in construction projects in China.” International Journal of Project Management, Vol. 25, No. 6, pp. 601–614.

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Bon-Gang Hwang.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Zhao, X., Hwang, BG. & Phng, W. Construction project risk management in Singapore: Resources, effectiveness, impact, and understanding. KSCE J Civ Eng 18, 27–36 (2014). https://doi.org/10.1007/s12205-014-0045-x

Download citation

  • Received:

  • Revised:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s12205-014-0045-x

Keywords

Navigation