Abstract
Contractors in the international marketplace are experiencing more severe political risks than ever before. They have also in response endeavored to mitigate the high degree of political risk exposure in order to survive. It is important however to identify and manage the critical variables affecting political risks associated with international construction projects. Relatively few studies of political risks, particularly in the context of international projects, have been carried out. The objective of this paper is to examine how international contractors attempt to identify and manage the critical variables which affect the level of political risks when they venture out of their home countries. 85 variables contributing to the level of political risks encountered by international contractors were identified in this paper. Based on the findings from an international survey on political risks, this study reveals that the variables, such as degree of stability of the government, project desirability to the host country, policy uncertainty, racism and xenophobia, and unfavorable attitude towards foreign businesses are the most significant variables. Several recommendations are also provided for international contractors in this paper. This research will assist international contractors to manage the political risk factors when expanding overseas.
Similar content being viewed by others
References
Agarwal, J. and Feils, D. (2007). “Political risk and the internationalization of firms: an empirical study of canadian-based export and FDI firms.” Canadian Journal of Administrative Sciences, Vol. 24, No. 3, pp. 165–181.
Agarwal, S. and Ramaswami, S. N. (1992). “Choice of foreign market entry mode: Impact of ownership, location and internalization factors.” Journal of International Business Studies, Vol. 23, No. 1, pp. 1–27.
Akinci, B. and Fischer, M. (1998). “Factors affecting contractors’ risk of cost overburden.” Journal of Management in Engineering, Vol. 14, No. 1, pp. 67–76.
Al Khattab, A. A., Anchor, J., and Davies, E. (2007). “Managerial perceptions of political risk in international projects.” International Journal of Project Management, Vol. 25, No. 7, pp. 734–743.
Aliber, R. A. (1975). “Exchange risk, political risk and investor demands for external currency deposits.” Journal of Money, Credit and Banking, Vol. 7, No. 2, pp. 161–179.
Alon, I. and Herbert, T. (2009). “A stranger in a strange land: Micro political risk and the multinational firm.” Business Horizons, Vol. 52, No. 2, pp. 127–137.
Alon, I. and Martin, M. A. (1998). “A normative model of macro political risk assessment.” Multinational Business Review, Vol. 6, No. 2, pp. 10–19.
Ashley, D. and Bonner, J. (1987). “Political risks in international construction.” Journal of Construction Engineering and Management, Vol. 113, No. 3, pp. 447–467.
Assaf, S.A., Al-Khalil, M., and Al-Hazmi, M. (1995). “Causes of delay in large building construction projects.” Journal of Management in Engineering, Vol. 11, No. 2, pp. 45–50.
Bakri, S. K., Bokharey, S. A., Kalaikumar, V., Narayanan, S. P., and Nabilah, A.B. (2010). “Risks and mitigation measures in buildoperate-transfer projects.” World Academy of Science, Engineering and Technology, Vol. 63, No. 2, pp. 217–223.
Baloi, D. and Price, A. D. F. (2003). “Modeling global risk factors affecting construction cost performance.” International Journal of Project Management, Vol. 21, No. 4, pp. 261–269.
Bing, L., Akintoye, A., Edwards, P. J., and Hardcastle, C. (2005). “The allocation of risk in PPP/PFI construction projects in the UK.” International Journal of Project Management, Vol. 23, No. 1, pp. 25–35.
Birch, D. G. W. and McEvoy, M. A. (1992). “Risk analysis for information systems.” Journal of Information Technology, Vol. 7, No. 1, pp. 44–53.
Butler, K. C. and Joaquin, D. C. (1998). “A note on political risk and the required return on foreign direct investment.” Journal of International Business Studies, Vol. 29, No. 3, pp. 599–608.
Chen, C. (2008). “Entry mode selection for international construction markets: the influence of host country related factors.” Construction Management and Economics, Vol. 26, No. 3, pp. 303–314.
Delios, A. and Henisz, W. (2000). “Japanese firms’ investment strategies in emerging economies.” Academy of Management Journal, Vol. 43, No. 3, pp. 305–323.
El-Sayegh, S. M. (2008). “Risk assessment and allocation in the UAE construction industry.” International Journal of Project Management, Vol. 26, No. 4, pp. 431–438.
Fitzpatrick, M. (1983). “The definition and assessment of political risk in international business: A review of the literature.” The Academy of Management Review, Vol. 8, No. 2, pp. 249–254.
Frynas, J. G. and Mellahi, K. (2003). “Political risks as firm-specific (dis)advantages: Evidence on transnational oil firms in Nigeria.” Thunderbird International Business Review, Vo. 45, No. 5, pp. 541–565.
Green, R. T. and Cunningham, W. H. (1975) “The determinants of US foreign investment: An empirical examination.” Management International Review, Vol. 15, Nos. 2/3, pp. 113–120.
Han, S. H. and Diekmann, J. E. (2001). “Approaches for making risk-based go/no-go decision for international projects.” Journal of Construction Engineering and Management, Vol. 127, No. 4, pp. 300–308.
Han, S. H., Park, S. H., Kim, D. Y., Kim, H., and Kang, Y. W. (2007). “Causes of bad profit in overseas construction projects.” Journal of Construction Engineering and Management, Vol. 133, No. 12, pp. 932–943.
Harris, B. (2002). Xenophobia: A new pathology for a new South Africa? psychopathology and social prejudice, In: D. Hook and G. Eagle, Cape Town, University of Cape Town Press, pp. 169-184.
Hastak, M. and Shaked, A. (2000). “ICRAM-1: Model for international construction risk assessment.” Journal of Management in Engineering, Vol. 16, No. 1, pp. 59–69.
Hennart, J. F. (1988). “A transaction cost theory of equity joint ventures.” Strategic Management Journal, Vol. 9, No. 4, pp. 361–374.
Hillman, A. and Hitt, M. (1999). “Corporate political strategy formulation: A model of approach, participation and strategy decisions.” Academy of Management Review, Vol. 24, No. 4, pp. 825–842.
Howell, L. D. and Chaddick, B. (1994). “Models of political risk for foreign investment and trade.” The Columbia Journal of World Business, Vol. 29, No. 3, 70–90.
Iankova, E. and Katz, J. (2003). “Strategies for political risk mediation by international firms in transition economies: The case of Bulgaria.” Journal of World Business, Vol. 38, No. 3, pp. 182–203.
Jakobsen, J. (2010) “Old problems remain, new ones crop up: Political risk in the 21st century.” Business Horizons, Vol. 53, No. 5, pp. 481–490.
Keillor, B., Hauser, W., and Griffin, A. (2009). “The relationship between political risk, national culture and foreign direct investment as a market entry strategy: Perspectives from US firms.” Innovative Marketing, Vol. 5. No. 1, pp. 48–54.
Keillor, B., Wilkinson, T., and Owens, D. (2005). “Threats to international operations: Dealing with political risk at the firm level.” Journal of Business Research, Vol. 58, No. 5, pp. 629–635.
Kelly, P. M. and Adger, W. N. (2000). “Theory and practice in assessing vulnerability to climate change and facilitating adaptation.” Climatic Change, Vol. 47, No. 4, pp. 325–52.
Kennedy, C. R. (1988). “Political risk management: A portfolio planning model.” Business Horizons, Vol. 31, No. 6, pp. 26–33.
Kobrin, S. (1987). “Testing the bargaining hypothesis in the manufacturing sector in developing countries.” International Organization, Vol. 41, No. 4, pp. 609–638.
Lai, G. M. H. (2002) “Relationship between FDI characteristics toward china and political risk management methods in foreign direct investment.” Chaoyang Business and Management Review, Vol. 1, No. 1, pp. 41–56.
Ling, Y. Y. and Hoang, V. T. P. (2010). “Political, economic, and legal risks faced in international projects: Case study of Vietnam.” Journal of Professional Issues in Engineering Education and Practice, Vol. 136, No. 3, pp. 156–164.
Ling, Y. Y. and Hoi, L. (2006). “Risk faced by Singaporean firms when undertaking construction projects in India.” International Journal of Project Management, Vol. 24, No. 3, pp. 261–270.
Ling, Y. Y. and Low, S. P. (2007). “Legal risks faced by foreign architectural, engineering, and construction firms in China.” Journal of Professional Issues in Engineering Education and Practice, Vol. 133, No. 3, pp. 238–245.
Low, S. P., Liu, J. Y., and He, Q. S. (2009). “External risk management practices of Chinese construction firms in Singapore.” KSCE Journal of Civil Engineering, Vol. 13, No. 2, pp. 85–95.
Lu, W. S., Shen, L. Y., and Yam, M. C. H. (2008). “Critical success factors for competitiveness of contractors: China study.” ASCE Journal of Construction Engineering and Management, Vol. 134, No. 12, pp. 972–982.
Makino, S. and Beamish, P. W. (1988). “Performance and survival of international joint ventures with non-conventional ownership structures.” Journal of International Business Studies, Vol. 29, No. 4, pp. 797–818.
Miller, K. D. (1992). “A framework for integrated risk management in international business.” Journal of International Business Studies, Vol. 23, No. 2, pp. 311–331.
Mortanges, P. C. and Allers, V. (1996). “Political risk assessment: Theory and the experience of Dutch firms.” International Business Review, Vol. 5, No. 3, pp. 303–318.
Nunnally, J. C. (1978). Psychometric theory, 2nd Ed., McGraw-Hill, New York.
Oetzel, J. (2005). “Smaller may be beautiful but is it more risky? Assessing and managing political and economic risk in Costa Rica.” International Business Review, Vol. 14, No. 6, pp. 765–790.
Ozorhon, B., Arditi, D., Dikmen, I., and Birgonul, M. T. (2010). “Performance of international joint ventures in construction.” ASCE Journal of Management in Engineering, Vol. 26, No. 4, pp. 209–222.
Quer, D., Claver, E., and Rienda, L. (2011). “Political risk, cultural distance, and outward foreign direct investment: Empirical evidence from large Chinese firms.” Asia Pacific Journal of Management, Vol. 29, No. 4, pp. 1089–1104.
Ring, P., Lenway, S., and Govekar, M. (1990). “Management of the political imperative in international business.” Strategic Management Journal, Vol. 11, No. 2, pp. 141–151.
Rios-Morales, R., Gambergera, D., Smuca, T., and Azuajea, F. (2009). “Innovative methods in assessing political risk for business internationalization.” Research in International Business and Finance, Vol. 32, No. 2, pp. 144–156.
Robock, S. H. (1971). “Political risk: Identification and assessment.” Columbia Journal of World Business, July–August, Vol. 6, No. 4, pp. 6–20.
Root, F. (1972). Analyzing political risks in international business, In: A. Kapoor and P. Grub, editors, Multinational Enterprise in Transition. London: Darwin Press.
Sachs, T., Tiong, R. L. K. and Wagner, D. (2008). “The quantification and financial impact of political risk perceptions on infrastructure projects in Asia.” The Journal of Structured Finance, Winter, Vol. 13, No. 4, pp. 80–104.
Shen, L. Y., Wu, W. C., and Ng, S. K. (2001). “Risk assessment for construction joint ventures in China.” Journal of Construction Engineering and Management, Vol. 127, No. 1, pp. 76–81.
Simon, J. D. (1984). “A theoretical perspective on political risk.” Journal of International Business Studies, Vol. 15, No. 3, pp. 123–143.
Torre, J. and Neckar, D. H. (1988). “Forecasting political risks for international operations.” International Journal of Forecasting, Vol. 4, No. 2, pp. 221–241.
Toyne, B. and Walters, P. (1993). Global marketing management (2nd ed.), Massachusetts: Allyn and Bacon.
Tsai, M. C. and Su, Y. S. (2002). “Political risk assessment on air logistics hub developments in Taiwan.” Journal of Air Transport Management, Vol. 8, No. 6, pp. 373–380.
Tsai, M. C and Su, C. H. (2005). “Political risk assessment of five East Asian ports: the view of global carriers.” Marine Policy, Vol. 29, No. 4, pp. 291–298.
Ting, W. (1988). Multinational risk assessment and management, Quorum Books, New York.
Van Wyk, J. (2010). “Political sources of international business risk: An interdisciplinary framework.” Journal of International Business Research, Vol. 9, No. 1, pp. 103–119.
Voelker, C., Permana, A., Sachs, T., and Tiong, R. L. K. (2008). “Political risk perception in Indonesian power projects.” Journal of Financial Management of Property and Construction, Vol. 13, No. 1, pp. 18–34.
Wang, S. Q., Tiong, R. L. K., Ting, S. K., and Ashley, D. (1999). “Political risk: Analysis of key contract clauses in China’s BOT project.” Journal of Construction Engineering and Management, Vol. 125, No. 3, pp. 190–197.
Wang, S. Q., Tiong, R. L. K., Ting, S. K., and Ashley, D. (2000). “Evaluation and management of foreign exchange and revenue risks in China’s BOT projects.” Construction Management and Economics, Vol. 18, No. 2, pp. 197–207.
Ward, S. C. and Chapman, C. B. (1991). “Extending the use of risk analysis in project management.” International Journal of Project Management, Vol. 9, No. 2, pp. 117–123.
Yaprak, A. and Sheldon, K. T. (1984). “Political risk management in multinational firms: An integrative approach.” Management Decision, Vol. 22, No. 6, pp. 53–67.
Zhang, H. (2007). “A redefinition of the project risk process: Using vulnerability to open up the event-consequence link.” International Journal of Project Management, Vol. 25, No. 7, pp. 694–701.
Zhuang, L., Ritchie, R., and Zhang, Q. (1998). “Managing business risks in China.” Long Range Planning, Vol. 31, No. 4, pp. 606–614.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Xiaopeng, D., Pheng, L.S. Understanding the critical variables affecting the level of political risks in international construction projects. KSCE J Civ Eng 17, 895–907 (2013). https://doi.org/10.1007/s12205-013-0354-5
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s12205-013-0354-5