Abstract
The construction industry plays a very important role in the Portuguese economy. In 2009, it was among the top five economic sectors, representing 13% of total employment. Nevertheless, project failures are still frequent mainly due to inadequate management practices and to the intrinsic characteristics of projects of the construction industry. Even though Portuguese construction has improved in recent years, cost and schedule overruns, low productivity and final product quality problems are still common. In this context, project management is a crucial tool for improving construction operations and for the overall success of projects. The aim of this article is to contribute to the discussion on success evaluation factors in a field where little has been written — the construction industry. Through a survey of 40 medium and large Portuguese companies several factors were identified which are currently considered in the evaluation of project success, as found in the literature review. The results show that the traditional factors, often referred to as the “Atkinson elements triangle” (cost, time and quality), are still the most relevant for evaluating the success of a project, but others, such as customer involvement and acceptance, have gained importance in recent years.
Similar content being viewed by others
References
Atkinson, R. (1999). “Project management: Cost, time, and quality, two best guesses and a phenomenon, it is time to accept other success criteria.” International Journal of Project management, Elsevier, Vol. 17, No. 6, pp. 77–82.
Belout, A. and Gauvreau, C. (2004). “Factors influencing project success: The impact of human resource management.” International Journal of Project Management, Elsevier, Vol. 22, No. 1, pp. 1–11.
Cao, Y., Chau, K. W., Anson, M., and Zhang, J. P. (2002). “An intelligent decision support system in construction management by data warehousing technique.” Lecture Notes in Computer Science, Springer, Vol. 2480, pp. 360–369.
Carú, A., Cova, B., and Pace, S. (2004). “Project success: Lessons from the Andrea Case.” European Management Journal, Elsevier, Vol. 22, No. 5, pp. 532–545.
Chan, A. and Chan, A. (2004). “Key performance indicators for measuring construction success.” Benchmarking: An International Journal, Emerald, Vol. 11, No. 2, pp. 203–210
Chau, K. W. (2004). “A two-stage dynamic model on allocation of construction facilities with genetic algorithm.” Automation in Construction, Elsevier, Vol. 13, No. 4, pp. 481–490.
Chau, K. W., Anson, M., and Zhang, J. P. (2003). “Implementation of visualization as planning and scheduling tool in construction.” Building and Environment, Elsevier, Vol. 38, No. 5, pp. 713–719.
CII — Construction Industry Institute (2011). Knowledge management, https://www.construction-institute.org/scriptcontent/know.cfm?section=know (retrieved 10-03-2011).
Crespo, A., Palacios, R., Acosta, P., and Mayoral, M. (2010). “A qualitative study of hard decision making in managing global software development teams.” Information Systems Management, Taylor and Francis, Vol. 27, Issue 3, pp. 247–252.
Doloi, H. and Lim, M. Y. (2007). “Measuring performance in Construction Projects-A critical analysis with an australian perspective.” Proc. COBRA-RICS (Construction and Building Research Conference of the Royal Institute of Chartered Surveyors), London, U.K.
FIEC and EFBWW (2008). “Joint declaration on paritarian funds.” http://www.paritarian-funds-construction.eu/content/files/Warsaw%20declaration.pdf (retrieved in 30-05-2012).
KPMG International (2012). Global engineering and construction companies need to adapt quickly, http://www.big4.com/kpmg/kpmg-global-engineering-and-construction-companies-need-toadapt-quickly (retrieved in 30-05-2012).
Kerzner, H. (2009). Project management — A systems approach to planning, scheduling and control, 10th Edition, Wiley, New Jersey.
Lewis, J. P. (2007). Fundamentals of project management. AMACOM (American Management Association), New York, 3rd Edition.
Munns, A. K. and Bjeirmi, B. F. (1996). “The role of project management in achieving success.” International Journal of Project Management, Elsevier, Vol. 14, No. 2, pp. 81–87.
Navas, J. R. (2008). Engenharia de gestão de projectos, FCA-Editora de Informática, Lisboa, Portugal.
Nguyen, L. D., Oguniana, S. O., and Xuan Lan, D. T. (2004). “A study on project success factors in large construction projects in vietnam.” Engineering, Construction and Architectural Management, Emerald, Vol. 11, No. 6, pp. 404–413.
Paiva, A., Varajão, J., Dominguez, C., and Ribeiro, P. (2011). “Principais aspectos considerados na avaliação do sucesso de projectos de desenvolvimento.” Revista de ciência e tecnologia de Américas-Journal of Science and Technology of the Americas, Interciencia, Vol. 36, No. 3, pp. 200–204.
Palacios, R. C., Caro, E. T., Crespo, A. G., and Berbis, J. M. (2010). “Identifying technical competences of it professionals. the case of software engineers.” International Journal of Human Capital and Information Technology, IGI Global, Vol. 1, Issue 1, pp. 31–43.
Pires, B., Teixeira, J.C., and Moura, H. (2007). “Management functions and competitiveness in the Portuguese construction industry.” Proc. 25th CME (Conference Construction Management and Economics), Reading, U. K.
PMI (2008). A guide to the project management body of knowledge, Project Management Institute, 4th ed.
PORDATA (2012). Personnel employed by sector of activity, http://www.pordata.pt/Portugal/Pessoal+ao+servico+nas+empresas+nao+financeiras+total+e+por+sector+de+actividade+economica-163 (retrieved in 30-05-2012).
Ramirez, R., Alarcón, L., and Knights, P. (2004). “Benchmarking system for evaluating management practices in the construction industry.” Journal of Management in Engineering, ASCE, Vol. 20, No. 3, pp.110–117.
Roldão, V. S. (2007). Gestão de projectos — Abordagem instrumental ao Planeamento, Organização e Controlo, Monitor, Lisboa, Portugal.
Singh, V., Gu, N., and Wang, X. (2011). “A theoretical framework of a BIM-based multi-disciplinary collaboration platform.” Automation in Construction, Elsevier, Vol. 20, No. 2, pp. 134–144.
TSO (2009). Managing successful projects with PRINCE2 — PRINCE2, 5th edition, Nantwitch, U.K.
Varajão, J., Cardoso, J., Gonçalves, D., and Cruz, J. (2008). “Análise à gestão de projectos de desenvolvimento de software em grandes empresas portuguesas.” Semana Informática, No. 904, pp. 10–12.
Wang, H. J., Zhang, J. P., Chau, K. W., and Anson, M. (2004). “4D dynamic management for construction planning and resource utilization.” Automation in Construction, Elsevier, Vol. 13, No. 5, pp. 575–589.
White, D. and Fortune, J. (2002). “Current practice of project management — An empirical study.” International Project Management Journal, Elsevier, Vol. 20, No. 1, pp. 1–11.
Yang, J., Shen G., Ho, M., Drew, D. S., and Xue, X. (2011). “Stakeholder management in construction: An empirical study to address research gaps in previous studies.” International Journal of Project Management, Elsevier, Vol. 29, Issue 7, pp. 900–910.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Ribeiro, P., Paiva, A., Varajão, J. et al. Success evaluation factors in construction project management — some evidence from medium and large Portuguese companies. KSCE J Civ Eng 17, 603–609 (2013). https://doi.org/10.1007/s12205-013-0019-4
Received:
Revised:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s12205-013-0019-4