Abstract
Technology valuation is a very important prerequisite for technology transaction which, in turn, boosts the development and the commercialization of new technologies. Valuation of construction technologies has challenges caused by unique characteristics of the industry that differ from the manufacturing industry where technology valuation has been established and used frequently. This paper presents a review of the technology valuation methodology, identifies the important factors that should be considered in the valuation of construction technology, and proposes a guideline for construction technology valuation. A real-world case study on a new construction technology for construction and/or maintenance of bridge piers is also presented based on the proposed valuation methodology.
Similar content being viewed by others
References
Boer, F. P. (1999). The valuation of technology, John Wiley & Sons, Inc., New York.
Byrd, R. C. (2002). “iNetworks partners with national technology transfer center.” (http://www.nttc.edu/about/newsdetail.asp?recnum=33).
Hitchner, J. R. and Mard, M. J. (2006). Financial valuation workbook, 2nd Ed., John Wiley & Sons, Inc.
Ho, S. P. and Liu, L. Y. (2003). “How to evaluate and invest in emerging A/E/C technologies under uncertainty.” J. Constr. Engrg. and Mgmt., ASCE., Vol. 129, No. 1, pp. 16–24.
Hong, S. J. (2006). A study on construction technology valuation system & methodology, Master Thesis, Department of Construction Management, Hanyang University, Seoul, Korea.
Jo, S. P. (2002). Technology assets: The substance and value estimation, The Korean Intellectual Property Office.
Kwon, E. K., Kim, M. C. and Lee, H. C. (1998). A study on measures to relax financial constraints of construction firms to strengthen their competition in the industry, Korea Research Institute for Human Settlements.
Ministry of Construction & Transportation of Korea (2004). Yearbook of road statistics.
National Technology Transfer Center (1996). Technology assessment, Wheeling College, Inc.
Sassine, E. (2004). The valuation of construction companies. Master Thesis, Department of Civil and Environmental Engineering, Massachusetts Institute of Technology, Massachusetts, U.S.
Schweihs, R. (1998). Valuing intangible assets, McGraw-Hill Companies.
Skibniewski, M. (1988). “A framework for decision making on implementing robotics in construction.” J. Constr. Engrg. and Mgmt., ASCE., Vol. 2, No. 2, pp. 188–201.
Smith, G. V. and Parr, R. L. (2000). Valuation of intellectual property and intangible assets, 3rd Ed., Wiley, New York.
The Korea Development Bank (2000). Industry technology information.
Warszawski, A. and Navon, R. (1998). “Implementation of robotics in building: Current status and future prospects.” J. Constr. Engrg. and Mgmt., ASCE., Vol. 124, No. 1, pp. 31–41.
Weidema, B. P. (1998). New development in the methodology for life cycle assessment, (www.lca-net.com/publications/develop/).
Yegge, W. M. (2002). A basic guide for valuing a company, John Wiley & Sons, Inc., New York.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Hong, S.J., Seo, J.W., Kim, Y.S. et al. Construction technology valuation for patent transaction. KSCE J Civ Eng 14, 111–122 (2010). https://doi.org/10.1007/s12205-010-0111-y
Received:
Revised:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s12205-010-0111-y