Abstract
For the current situation that the application of risk matrix method may result in too many risk ties which will block risk management and decision making, and based on the brief introduction of risk matrix method, this paper subdivides the risk levels, gives an improved risk matrix method, conducts risk assessment of contractor support using the improved risk matrix method, and determines the risk rates and the acceptable level.
Similar content being viewed by others
References
Xu Xian-hao, Tang Ze-lin. Risk assessment of logistics outsourcing based on risk matrix [J]. Logistics Technology, 2006 (5): 67–69 (in Chinese).
Zhang Fu-yuan. Study on the risk management of high-tech equipment contractor support [R]. Shijiazhuang: Shijiazhuang New Technology Application Institute, 2011 (in Chinese).
Zhu Qi-chao, Kuang Xing-hua, Shen Yong-ping. Risk matrix method and its application [J]. Engineering Sciences, 2003, 5(1): 89–94 (in Chinese).
Xu Shu, Hu Ming-ming, Li Zi-ru. The application of risk matrix method in risk assessment of business outsourcing [J]. Modernization of Management, 2004 (2): 13–16 (in Chinese).
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Zhang, Fy., Li, Dy., Geng, B. et al. Risk assessment of contractor support based on improved risk matrix method. J. Shanghai Jiaotong Univ. (Sci.) 20, 464–467 (2015). https://doi.org/10.1007/s12204-015-1650-7
Received:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s12204-015-1650-7