Skip to main content
Log in

Production balance of ship erection

  • Published:
Journal of Shanghai Jiaotong University (Science) Aims and scope Submit manuscript

Abstract

A network plan model of ship erection was established based on the network planning technology and the work-package breakdown system. The load-oriented production control method was introduced to build up a throughput diagram model thus it is possible to describe the ship erection process numerically. Based on the digitalized models some cases of production balance of ship erection were studied and three balance indexes were put forward, they are the load balance rate, the input manpower balance rate and the maximum gantry crane operating times. Such an analytic method based on the balance evaluation is the important foundation for digitization and intelligentization of shipyard production management.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Wen De-wei. Group technology in shipbuilding [M]. Shanghai: Shanghai Jiaotong University Press, 1990.

    Google Scholar 

  2. Zhong Hong-cai, Jiang Ruhong, Tan Jia-hua, et al. Research on cellular manufacturing model and production plan optimum in shipbuilding [J]. Shipbuilding of China, 2004, 45(2): 7–13.

    Google Scholar 

  3. Jiang Ru-hong, Dong Da-shuan, Chen Qiang, et al. The production management mode based on WP & WO [J]. Shipbuilding Technology, 2007, 275(1): 10–12.

    Google Scholar 

  4. Zhu Hong-yi. Network plan technology [M]. Shanghai: Fudan University Press, 1999.

    Google Scholar 

  5. Liu Jian-feng. Study on ship hull construction operation strategy based on PWBS [D]. Shanghai: Shanghai Jiaotong University Press, 2000.

    Google Scholar 

  6. Jae Kyu Lee, Kyoung Jun Lee, Hung Kook Park, et al. Developing scheduling systems for daewoo shipbuilding: DAS project [J]. European Journal of Operational Research, 1997, 97(2): 380–395.

    Article  MATH  Google Scholar 

  7. Hans-Peter Wiendahl, Jan-Wilhelm Breithaupt. Automatic production control applying control theory [J]. International Journal of Production Economics, 2000, 63(1): 33–46.

    Article  Google Scholar 

  8. Chen Qiang. Center shipbuilding model study and application [D]. Heilongjiang: Harbin Engineering University, 2001.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Ru-hong Jiang  (蒋如宏).

Additional information

Foundation item: the Key Scientific Research Project from MOE & MOF of China “Knowledge-based Ship-design Hyper Integrated Platform (KSHIP)”

Rights and permissions

Reprints and permissions

About this article

Cite this article

Jiang, Rh., Tan, Jh. & Liu, Cg. Production balance of ship erection. J. Shanghai Jiaotong Univ. (Sci.) 13, 357–361 (2008). https://doi.org/10.1007/s12204-008-0357-4

Download citation

  • Received:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s12204-008-0357-4

Key words

CLC number

Navigation