Abstract
A network plan model of ship erection was established based on the network planning technology and the work-package breakdown system. The load-oriented production control method was introduced to build up a throughput diagram model thus it is possible to describe the ship erection process numerically. Based on the digitalized models some cases of production balance of ship erection were studied and three balance indexes were put forward, they are the load balance rate, the input manpower balance rate and the maximum gantry crane operating times. Such an analytic method based on the balance evaluation is the important foundation for digitization and intelligentization of shipyard production management.
Similar content being viewed by others
References
Wen De-wei. Group technology in shipbuilding [M]. Shanghai: Shanghai Jiaotong University Press, 1990.
Zhong Hong-cai, Jiang Ruhong, Tan Jia-hua, et al. Research on cellular manufacturing model and production plan optimum in shipbuilding [J]. Shipbuilding of China, 2004, 45(2): 7–13.
Jiang Ru-hong, Dong Da-shuan, Chen Qiang, et al. The production management mode based on WP & WO [J]. Shipbuilding Technology, 2007, 275(1): 10–12.
Zhu Hong-yi. Network plan technology [M]. Shanghai: Fudan University Press, 1999.
Liu Jian-feng. Study on ship hull construction operation strategy based on PWBS [D]. Shanghai: Shanghai Jiaotong University Press, 2000.
Jae Kyu Lee, Kyoung Jun Lee, Hung Kook Park, et al. Developing scheduling systems for daewoo shipbuilding: DAS project [J]. European Journal of Operational Research, 1997, 97(2): 380–395.
Hans-Peter Wiendahl, Jan-Wilhelm Breithaupt. Automatic production control applying control theory [J]. International Journal of Production Economics, 2000, 63(1): 33–46.
Chen Qiang. Center shipbuilding model study and application [D]. Heilongjiang: Harbin Engineering University, 2001.
Author information
Authors and Affiliations
Corresponding author
Additional information
Foundation item: the Key Scientific Research Project from MOE & MOF of China “Knowledge-based Ship-design Hyper Integrated Platform (KSHIP)”
Rights and permissions
About this article
Cite this article
Jiang, Rh., Tan, Jh. & Liu, Cg. Production balance of ship erection. J. Shanghai Jiaotong Univ. (Sci.) 13, 357–361 (2008). https://doi.org/10.1007/s12204-008-0357-4