The rönnskär smelter project: Production, expansion, and start-up

  • Industrial Insight
  • Cu, Ni, Co Slag Cleaning
  • Published:
JOM Aims and scope Submit manuscript

Abstract

In 1998, the Boliden Limited board of directors voted to modernize the Rönnskär copper smelter and refinery to expand production from 130,000 t/y to 230,000 t/y cathodes. Heavy involvement from operations and management was maintained during the modernization project, enabling the realization of project goals while maintaining full production schedules. Early start-up data indicate a smooth transition from the old to the new units.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Bibliography

  • Lehner T. and P.O. Lindgren. “Continued Development of Boliden’s Rönnskär Smelter Following the 1987–1988 Reconstruction,” Erzmetall. 46 (2) (1993): pp. 105–112.

    Google Scholar 

  • Lehner T. and A. Vikdahl “Productivity, Quality and Smelter Operations: Rönnskär 1992” (Paper presented at Extractive Metallurgy of Copper, Nickel and Cobalt, Denver, Colorado, 1993).

Download references

Author information

Authors and Affiliations

Authors

Additional information

For more information, contact T. Lehner, Boliden Mineral AB, Rönnskär Smelter, S 932 81 Skelleftehamn, Sweden; telephone 46910 77 34 95; fax 46 910 77 31 38; e-mail theo.lehner@boliden.se.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Isaksson, Ö., Lehner, T. The rönnskär smelter project: Production, expansion, and start-up. JOM 52, 26–29 (2000). https://doi.org/10.1007/s11837-000-0169-y

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/s11837-000-0169-y

Keywords

Navigation