Skip to main content
Log in

Investigation of gas and water coning behavior for the enhancement of oil production

  • Published:
Korean Journal of Chemical Engineering Aims and scope Submit manuscript

Abstract

This study presents the extensive simulation to control the concurrent behavior of gas and water coning in oil reservoir with existence of a bottom aquifer. From simulation results, coning phenomena were observed even with the critical oil rate obtained analytically. It is because the critical rate is calculated using a steady state expression. In order to examine the coning behavior, firstly, we have run for various oil layer thicknesses. The result in case of thin layer shows early breakthrough of gas and water cones and the increase in water-oil ratio from the beginning of production. Meanwhile, for the thick case of 200 ft, there is no water breakthrough observed even though water cone has been already formed because it is stable. Since gas and water cones move mainly in a vertical direction, cone development is affected by a vertical permeability. As a result of runs for vertical permeabilities, the breakthrough time is getting delayed as the vertical permeability is smaller. In the case of a high vertical permeability, the shape of the water cone is developed in a concave form at the beginning. After two years of production, however, this cone shape becomes almost flat since the water-oil contact is elevated uniformly throughout the whole reservoir. In the analysis of coning behavior for different aquifer sizes, it is found that the aquifer size does not affect both cone shape and watercut. But with a strong bottom aquifer the behavior of gas coning is greatly decreased since the pressure is maintained by the active aquifer. The extent of well penetration into the oil layer has a considerable effect on coning phenomena. As the completion interval is decreased, the breakthrough time is delayed. However, a large pressure drop occurs in the shortest interval so that it worsens the well productivity. The most practical method to control coning is the oil production rate. Production of gas and water can be minimized by keeping oil rates as low as possible. However, a low rate is directly linked to well’s economics, and therefore, the optimizing process for the production rate is essential.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. T. S. Daltaban, A. Miguel Lozada, P. Antonio Villavicencio and F. Marcos Torres, SPE, 117233 (2008).

  2. S.M. Saad, T. D. Darwich and Y. Assad, SPE, 29808 (1995).

  3. O. K. Kwon, S. S. Rhyu and W. M. Sung, Korean J. Chem. Eng., 18, 1 (2001).

    Article  Google Scholar 

  4. Nausha Asrar, SPE, 130515 (2010).

  5. A. Alikhan and S. M. FaroughAli, SPE, 13744 (1985).

  6. M. Mukat and R. D. Wyckoff, AIME 114, 144 (1935).

    Google Scholar 

  7. G. L. Chierici, G.M. Ciucci and G. Pizzi, J. Petroleum Technol., 16, 8 (1964).

    Google Scholar 

  8. H. I. Meyer and A. O. Garder, J. Appl. Phys., 25, 11 (1954).

    Google Scholar 

  9. S. J. Pirson, Oil Reservoir Engineering, Krieger Publishing Company, NY (1977).

    Google Scholar 

  10. I. Chaperon, SPE, 15377 (1986).

  11. L.A. Hoyland, P. Papatzacos and S.M. Skjaeveland, SPE, 15855 (1989).

  12. L. Jin, A. K. Wojtanowicz and R.G. Hughes, J. Canadian Petroleum Technol., 49, 5 (2010).

    Google Scholar 

  13. Rafay Z. Ansari and Russell T. Johns, SPE, 99896 (2006).

  14. C. R. Smith and S. J. Pirson, SPE, 613 (1963).

  15. J. C. Jarp, D. K. Lowe and N. Marusov, J. Petroleum Technol., 14, 7 (1962).

    Google Scholar 

  16. O. Jaripatke and D. Dalrymple, SPE, 127806 (2010).

  17. M. D. Swisher and A. K. Wojtanowicz, SPE, 30697 (1995).

  18. Y. Ould-amer, S. Chikh and H. Naji, J. Petroleum Sci. Eng., 45 (2004).

  19. L. Jin and A. K. Wojtanowicz, SPE, 129663 (2010).

  20. Eclipse® 100, Technical Description, Schlumberger.

  21. R. Recham, Petroleum Soc., 2001-24 (2001).

  22. R. Recham and M. Touami, Petroleum Soc., 2000-39 (2000).

  23. R. P. Sech, M.D. Jackson and Gary Hampson, SPE, 107169 (2007).

  24. M. Namani and M. Asadollahi and M. Haghighi, SPE, 108254 (2007).

  25. Boyun Guo and R. L.-H. Lee, SPE, 23994 (1993).

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Jinsoo Kim.

Additional information

To whom correspondence should be addressed.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Lee, W.C., Lee, Y.S., Kim, K.H. et al. Investigation of gas and water coning behavior for the enhancement of oil production. Korean J. Chem. Eng. 28, 2102–2109 (2011). https://doi.org/10.1007/s11814-011-0106-5

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s11814-011-0106-5

Key words

Navigation