Skip to main content
Log in

Distribution of contact loads in crushed zone between tunnel boring machine disc cutter and rock

隧道硬岩掘进机盘形滚刀破岩过程中刀岩接触载荷

  • Published:
Journal of Central South University Aims and scope Submit manuscript

Abstract

The construction efficiency and quality of tunnel boring machines (TBMs) is largely determined by the service life of cutting tools, which is the result of contact loads in the crushed zone between cutter ring and rock. In this paper, a series of rock breaking tests were conducted with a 216 mm diameter disc cutter and concrete samples. Based on the superposition principle, the distribution of contact loads between disc cutter and rock were obtained by using the truncated singular value decomposition (TSVD). The results show that both the peak value and the whole numerical distribution of the radial strains on the cutter ring increase with the increase of the penetration. The distribution curves of the contact loads show an approximate parabola going downwards, which indicates contact loads are more concentrated. The front non-loading area with a ratio from 1.8% to 5.4% shows an increasing trend with the increase of penetration. However, the change of rear non-loading area is not obvious. It is believed that the conclusions have guidance for the study of rock breaking mechanism and manufacturing process of the disc cutter.

摘要

隧道硬岩掘进机(TBM)破岩刀具的使用寿命是刀岩接触载荷作用的结果, 这与工程的施工效 率和质量息息相关。本文采用直径为 216 mm 的盘形滚刀进行了一系列混凝土切削试验, 基于叠加原 理, 利用截断奇异值法(TSVD)得到了盘形滚刀与岩石接触区接触载荷的分布规律。研究结果表明:随 着贯入度的增加, 刀圈径向应变峰值和整体数值均增加; 刀岩接触载荷分布曲线近似为开口向下的抛 物线, 接触载荷更加集中; 随着贯入度的增加, 前卸荷区占比从 1.8%增加至 5.4%, 而后卸荷区无明 显变化; 研究结果对盘形滚刀破岩机理和制造工艺的研究有一定的指导意义。

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. HUO Jun-zhou, SUN Wei, CHEN Jing, ZHANG Xu. Disc cutters plane layout design of the full-face rock tunnel boring machine (TBM) based on different layout patterns [J]. Computers and Industrial Engineering, 2011, 61(4): 1209–1225.

    Article  Google Scholar 

  2. XIA Yi-min, SHI Yu-peng, LIN Lai-kuang, ZHANG Yi-chao, TAN Qing, YANG Yang. Experimental evaluation of fragments from TBM disc cutting under different load cases [J]. Periodica Polytechnica Civil Engineering, 2018, 62(3): 746–756.

    Google Scholar 

  3. ROSTAMI J. Performance prediction of hard rock Tunnel Boring Machines (TBMs) in difficult ground [J]. Tunnelling & Underground Space Technology, 2016, 57: 173–182.

    Article  Google Scholar 

  4. LIN Lai-kuang, XIA Yi-min, MAO Qing-song, ZHANG Xu-hui. Experimental study on wear behaviors of TBM disc cutter ring in hard rock conditions [J]. Tribology Transactions, 2018, 61(5): 919–928.

    Article  Google Scholar 

  5. ROSTAMI J, OZDEMIR L. New model for performance production of hard rock TBMs [C]// 1993 Rapid Excavation and Tunneling Conference, Boston, Massachusetts, 1993: 793–809.

    Google Scholar 

  6. BALCI C, TUMAC D. Investigation into the effects of different rocks on rock cuttability by a V-type disc cutter [J]. Tunnelling and Underground Space Technology, 2012, 30: 183–193.

    Article  Google Scholar 

  7. XIA Yi-min, OUYANG Tao, XIE Lv-jian, TAN Qing, LUO Chun-lei, ZHAO Hai-ming, CHEN Zhuo. The development of the TBM disc cutter test device for cutting rock [J]. Advanced Materials Research, 2014, 889-890: 292–296.

    Article  Google Scholar 

  8. ROXBOROUGH F F, PHILLIPS H R. Rock excavation by disc cutter [J]. International Journal of Rock Mechanics & Mining Sciences & Geomechanics Abstracts, 1975, 12(12): 361–366.

    Article  Google Scholar 

  9. HASSANPOUR J, ROSTAMI J, ZHAO J. A new hard rock TBM performance prediction model for project planning [J]. Tunnelling & Underground Space Technology, 2011, 26(5): 595–603.

    Article  Google Scholar 

  10. ROSTAMI J. Hard rock TBM cutterhead modeling for design and performance prediction [J]. Geomechanik und Tunnelbau, 2008, 1(1): 18–28.

    Article  Google Scholar 

  11. ROSTAMI J. Study of pressure distribution within the crushed zone in the contact area between rock and disc cutters [J]. International Journal of Rock Mechanics and Mining Sciences, 2013, 57: 172–186.

    Article  Google Scholar 

  12. WANG Li-hui, LI Hai-peng, ZHAO Xiang-jun, ZHANG Qian. Development of a prediction model for the wear evolution of disc cutters on rock TBM cutterhead [J]. Tunnelling and Underground Space Technology, 2017, 67: 147–157.

    Article  Google Scholar 

  13. WANG Li-hui, KANG Yi-lan, ZHAO Xiang-jun, ZHANG Qian. Disc cutter wear prediction for a hard rock TBM cutterhead based on energy analysis [J]. Tunnelling and Underground Space Technology, 2015, 50: 324–333.

    Article  Google Scholar 

  14. KUPFERLE J, ZIZKA Z, SCHOESSER B, ROTTGER A, ALBER M, THEWES M, THEISEN W. Influence of the slurry-stabilized tunnel face on shield TBM tool wear regarding the soil mechanical changes-Experimental evidence of changes in the tribological system [J]. Tunnelling and Underground Space Technology, 2018, 74: 206–216.

    Article  Google Scholar 

  15. CHO J W, JEON S, YU S H, CHANG S H. Optimum spacing of TBM disc cutters: A numerical simulation using the three-dimensional dynamic fracturing method [J]. Tunnelling and Underground Space Technology, 2010, 25: 230–244.

    Article  Google Scholar 

  16. CHO J W, JEON S, JEONG H Y, CHANG S H. Evaluation of cutting efficiency during TBM disc cutter excavation within a Korean granitic rock using linear-cutting-machine testing and photogrammetric measurement [J]. Tunnelling and Underground Space Technology, 2013, 35: 37–54.

    Article  Google Scholar 

  17. ZARE M, MIKAEIL R. Optimization of tunnel boring machine (TBM) disc cutter spacing in jointed hard rock using a distinct element numerical simulation [J]. Periodica Polytechnica Civil Engineering. 2016, 61(1): 56–65.

    Google Scholar 

  18. TAN Qing, ZHANG Xu-hui, XIA Yi-min, ZHU Yi, YI Nian-en, ZHANG Jia. Numerical study on breaking rock by disc cutter at different confining pressure and joint characteristics case [J]. Journal of China Coal Society, 2014, 39(7): 1220–1228. (in Chinese)

    Google Scholar 

  19. TAN Qing, ZHANG Yi-chao, XIA Yi-min, GAO Hao. Experimental research of TBM disc cutter penetrate saturated rock [J]. Journal of Zhejiang University (Engineering Science), 2017, 51(5): 914–921. (in Chinese)

    Google Scholar 

  20. ZHU Jing-jing, LI Xi-bing, GONG Feng-qiang, WANG Shi-ming. Dynamic characteristics and damage model for rock under uniaxial cyclic impact compressive loads [J]. Chinese Journal of Geotechnical Engineering, 2013, 35(3): 531–539. (in Chinese)

    Google Scholar 

  21. XIA Yi-min, LIN Lai-kuang, WU Dun, JIA Lian-hui, CHEN Zhuo, BIAN Zhang-kuo. Geological adaptability matching design of disc cutter using multicriteria decision making approaches [J]. Journal of Central South University, 2018, 25(4): 843–854.

    Article  Google Scholar 

  22. ENTACHER M, WINTER G, BUMBERGER T, DECKERC K, GODORB I, GALLERA R. Cutter force measurement on tunnel boring machines-System design [J]. Tunnelling & Underground Space Technology, 2012, 31: 97–106.

    Article  Google Scholar 

  23. WANG Li-hui, QU Chuan-yong, KANG Yi-lan, SU Cui-xia, WANG Yan-qun, CAI Zong-xi. A mechanical model to estimate the disc cutter wear of tunnel boring machines [J]. Advanced Science Letters, 2011, 4(6): 2433–2439.

    Article  Google Scholar 

  24. ZHAO Xiao-xu, GONG Ya-dong. Loading distribution in rock-fragmentation contact zone of TBM disc hobbing cutters [J]. Chinese Journal of Construction Machinery, 2015, 13(2): 168–172. (in Chinese)

    Google Scholar 

  25. WU Qi-xing, AN Guan-feng, ZHOU Xiao-wen, XU Ming-hui, LIU Yi. Cutterhead mechanics analysis of shield tunneling in soft and hard complex stratum [J]. China Civil Engineering Journal, 2015, 48(s2): 321–326. (in Chinese)

    Google Scholar 

  26. CHOI S O, LEE S J. Numerical study to estimate the cutting power on a disc cutter in jointed rock mass [J]. KSCE Journal of Civil Engineering, 2016, 20(1): 440–451.

    Article  Google Scholar 

  27. MA Hong-su, YIN Li-jun, JI Hong-guang. Numerical study of the effect of confining stress on rock fragmentation by TBM cutters [J]. International Journal of Rock Mechanics & Mining Sciences, 2011, 48(6): 1021–1033.

    Article  Google Scholar 

  28. MOON T, OH J. A study of optimal rock-cutting conditions for hard rock tbm using the discrete element method [J]. Rock Mechanics & Rock Engineering, 2012, 45(5): 837–849.

    Google Scholar 

  29. CHENG Yong-liang, ZHONG Jue, MEI Yong-bing, XIA Yi-min. Rock fragmentation under different installation polar angles of TBM disc cutters [J]. Journal of Central South University, 2017, 24(10): 2306–2313.

    Article  Google Scholar 

  30. INNAURATO N, OGGERI C, ORESTE P P, VINAI R. Experimental and numerical studies on rock breaking with TBM tools under high stress confinement [J]. Rock Mechanics & Rock Engineering, 2007, 40(5): 429–451.

    Article  Google Scholar 

  31. ZHANG Zhao-huang, SUN Fei. The three-dimension model for the rock-breaking mechanism of disc cutter and analysis of rock-breaking forces [J]. Acta Mechanica Sinica, 2012, 28(3): 675–682.

    Article  MathSciNet  Google Scholar 

  32. AKBAMEZHAD A, NADOUSHANI Z S M. A computational method for selection of optimal concrete recycling strategy [J]. Magazine of Concrete Research, 2015, 67(11): 543–558.

    Article  Google Scholar 

  33. COOK N G W, HOOD M, TSAI F. Observations of crack growth in hard rock loaded by an indenter [J]. International Journal of Rock Mechanics and Mining Sciences and Geomechanics Abstracts, 1984, 21(2): 97–107.

    Article  Google Scholar 

  34. LI Fei, HAO Wei-feng, WANG Wen-rui, ZHANG Jie. The perturbation analysis of nonlinear Ill-conditioned solution [J]. Acta Geodaetica et Cartographica Sinica, 2011, 40(1): 5–9. (in Chinese)

    Google Scholar 

  35. GU Yong-wei, GUI Qing-ming. A new method to select truncated parameter in TSVD [J]. Journal of Geomatics Science and Technology, 2010, 27(3): 176–179. (in Chinese)

    Google Scholar 

  36. HANSEN P C, JENSEN T K, RODRIGUEZ G. An adaptive pruning algorithm for the discrete L-curve criterion [J]. Journal of Computational & Applied Mathematics, 2007, 198(2): 483–492.

    Article  MathSciNet  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Yi-min Xia  (夏毅敏).

Additional information

Foundation item: Project(51475478) supported by the National Natural Science Foundation of China; Project(2013CB035401) supported by the National Basic Research Program of China

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Shi, Yp., Xia, Ym., Tan, Q. et al. Distribution of contact loads in crushed zone between tunnel boring machine disc cutter and rock. J. Cent. South Univ. 26, 2393–2403 (2019). https://doi.org/10.1007/s11771-019-4182-8

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s11771-019-4182-8

Keywords

关键词

Navigation