Abstract
The steel roof of Wuhan Gymnasium is a long-span suspendome structure system. According to the structural characteristics of the roof, the lifting installation of upper latticed shell and the installation and tension of lower prestressed cables are introduced in detail. The cable tension is completed successfully on June 27, 2006, while the test results of cable forces and structural deformation are comparatively consistent with the theoretical analysis results. Moreover, Strut-adjustment Method is innovated and applied successfully in the construction of long-span suspendome structure for the first time, and the theoretical and practical experiences can be used for the research and application of similar new-type spatial structures.
Similar content being viewed by others
Author information
Authors and Affiliations
Corresponding author
Additional information
__________
Translated from Construction Technology, 2006, 35(12): 51–58 [译自: 施工技术]
Rights and permissions
About this article
Cite this article
Guo, Z., Shi, K., Luo, B. et al. Lifting installation and prestressed cable construction of suspendome roof for Wuhan Gymnasium. Front. Archit. Civ. Eng. China 2, 87–92 (2008). https://doi.org/10.1007/s11709-008-0005-y
Published:
Issue Date:
DOI: https://doi.org/10.1007/s11709-008-0005-y