Abstract
Inspection of each piece of equipment is required as part of a power plant-reliability program. Detailed procedures and assessments are developed based on standard or best practices in the power industry. For an accurate assessment, an understanding of the damage mechanism is crucial. In this work, a study was conducted on a superheater-tube elbow to evaluate its thinning mechanism to develop an assessment guideline. The thinning of the tubes was evaluated after 10 years of operation by sampling the tubing in 90° and 180° elbows that represent standard elbows in a power plant. Macroscopic observation, ultrasonic measurement, and chemical and metallurgical analyses were conducted. The analyses showed that although oxidation and erosion occurred, the rate was relatively insignificant at the time of sampling. In addition, analytical and finite-element analyses were performed to assess the stress level under various thickness scenarios. This work demonstrated that a separate investigation is necessary to determine the minimum wall thickness and replacement schedules for superheater-tube-elbow inspection.
Similar content being viewed by others
References
R.D. Port, H.M. Herro, The Nalco Guide to Boiler Failure Analysis. (McGraw-Hill, New York, 1991)
E. EPRI, Carbon Steel Handbook, Palo Alto, CA, (2007)
R. Kishor, T. Kyada, R.K. Goyal, T.S. Kathayat, Metallurgical analysis of cracks formed on coal fired boiler tube. IOP Conf. Ser. Mater. Sci. Eng. 75, 012021 (2015). https://doi.org/10.1088/1757-899X/75/1/012021
P. Mayer, H.J. Westwood, A.V. Manolescu, Corrosion related problems in fossil fired boilers. JMES. 2, 55–64 (1980). https://doi.org/10.1007/BF02833398
D. Ghosh, S. Ray, H. Roy, A.K. Shukla, Investigation into cause of high temperature failure of boiler superheater tube. High Temp. Mater. Process. (2014). https://doi.org/10.1515/htmp-2014-0018
N.-H. Lee, S. Kim, B.-H. Choe, K.-B. Yoon, D. Kwon, Failure analysis of a boiler tube in USC coal power plant. Eng. Fail. Anal. 16, 2031–2035 (2009). https://doi.org/10.1016/j.engfailanal.2008.12.006
J. Ahmad, J. Purbolaksono, Hydrogen damage in a rear riser water wall tube of a power plant. Eng. Fail. Anal. 17, 1239–1245 (2010). https://doi.org/10.1016/j.engfailanal.2010.01.005
S.K. Dhua, A. Saxena, B.K. Jha, Failure analysis of boiler tubes used in a thermal power plant. Trans. Indian Inst. Met. 69, 653–657 (2016). https://doi.org/10.1007/s12666-015-0790-7
F. Dehnavi, A. Eslami, F. Ashrafizadeh, A case study on failure of superheater tubes in an industrial power plant. Eng. Fail. Anal. 80, 368–377 (2017). https://doi.org/10.1016/j.engfailanal.2017.07.007
J. Ahmad, J. Purbolaksono, L.C. Beng, A.Z. Rashid, A. Khinani, A.A. Ali, Failure investigation on rear water wall tube of boiler. Eng. Fail. Anal. 16, 2325–2332 (2009). https://doi.org/10.1016/j.engfailanal.2009.03.012
G.K. Gupta, S. Chattopadhyaya, Critical failure analysis of superheater tubes of coal-based boiler. SV-JME. 63, 287–299 (2017). https://doi.org/10.5545/sv-jme.2016.4188
A.K. Pramanick, G. Das, S.K. Das, M. Ghosh, Failure investigation of super heater tubes of coal fired power plant. Case Stud. Eng. Fail. Anal. 9, 17–26 (2017). https://doi.org/10.1016/j.csefa.2017.06.001
G. Das, S.G. Chowdhury, A.K. Ray, S. Das, D.K. Bhattacharaya, Failure of a super heater tube. Eng. Fail. Anal. 9, 563–570 (2002). https://doi.org/10.1016/S1350-6307(01)00040-1
Babcock and Wilcox Company, Steam: Its Generation and Use, vol. 41. 1st edn, Babcock & Wilcox, Barberton, Ohio (2005)
R.B. Dooley, V.K. Chexal, Flow-accelerated corrosion of pressure vessels in fossil plants. Int. J. Press. Vessels Pip. 77, 85–90 (2000). https://doi.org/10.1016/S0308-0161(99)00087-3
D.B. Group Co. Ltd, 96M-SM Boiler Specification (2008)
C. Standard, GB/T 5310-2017: Translated English of Chinese Standard. (GBT 5310-2017, GB/T5310-2017, GBT5310-2017): Seamless steel tubes and pipes for high pressure boiler, https://www.chinesestandard.net, (2019) https://books.google.co.id/books?id=0xKiDwAAQBAJ
M. Karthikeyan, M.P. Jenarthanan, Experimental study of wall thinning behaviour in boiler pipes during bending process. Aust. J. Mech. Eng. 18, S88–S94 (2020). https://doi.org/10.1080/14484846.2018.1478684
2021 ASME Boiler & Pressure Vessel Code, 2021 edition, American Societ of Mechanical Engineers, New York (2021)
Acknowledgments
The authors gratefully acknowledge financial support from the Institut Teknologi Sepuluh Nopember for this work under the Publication Writing and IPR Incentive Program (PPHKI) 2023 project scheme.
Author information
Authors and Affiliations
Corresponding author
Additional information
Publisher's Note
Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.
Rights and permissions
Springer Nature or its licensor (e.g. a society or other partner) holds exclusive rights to this article under a publishing agreement with the author(s) or other rightsholder(s); author self-archiving of the accepted manuscript version of this article is solely governed by the terms of such publishing agreement and applicable law.
About this article
Cite this article
Ramadhan, F., Aujul Majdi, M., Arfi, A. et al. Evaluation and Assessment of a Superheater-Tube Elbow in a Coal-Based Power Plant Boiler after 10 Years of Operation. J Fail. Anal. and Preven. 23, 1356–1368 (2023). https://doi.org/10.1007/s11668-023-01686-9
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s11668-023-01686-9