Abstract
The excavated height of the left bank slope of the diversion power system intake in Jinchuan hydropower station is about 160 m. The stability and safety of the slope during construction and its operation/utilization become one of the most important geological engineering problems. At the same time, it is also crucial to select a safe and economic excavation gradient for the construction. We studied the problem of how to select a safe and economic slope ratio by analyzing the geological condition of the high slope, including the lithology, slope structure, structural surface and their combinations, rock weathering and unloading, hydrology, and the natural gradient. The study results showed that the use of an excavation gradient larger than the gradient observed during site investigation and the gradient recommended in standards and field practice manuals is feasible. Then, we used the finite element method and rigid limit equilibrium method to evaluate the stability of the excavation slope under natural, rainstorm and earthquake conditions. The calculated results showed that the excavated slope only has limited failure, but its stability is greatly satisfactory. The research findings can be useful in excavation and slope stabilization projects.
Similar content being viewed by others
References
Abramson LW, Lee TS, Sharma S, et al. (1996) Slope stability and stabilization methods. Wiley, New York, USA
Cai YJ, Liu SB, Wu HJ (2007) Study on stability of high slope of right bank of Zaoshi hydropower project, Hunan Province. Chinese Journal of Rock Mechanics and Engineering 26(Supp.2): 4452–4457. (In Chinese)
Chen DX, Liu DA, Ding EB, et al. (2007) Engineering geology research of left bank and rock mass evaluation in creep rock mass zone B of Longtan hydropower station. Journal of Engineering Geology 15(3): 362–369. (In Chinese) DOI: 10.3969/j.issn.1004-9665.2007.03.009
Chen J, Yin JH, Lee CF (2004) Stability analysis of the permanent shiplock slopes of the three gorges project. International Journal of Rock Mechanics and Mining Sciences 41(1): 593–598. DOI: 10.1016/j.ijrmms.2004.03.105
Chengdu University of Technology and Northwest Survey and Design Institute of State Power Corporation (2008). The engineering slope stability analysis of Jinchuan hydropower. (In Chinese)
Code for geological engineeringinvestigation of water resources and hydropower (GB50487-2008) (2009) The national standard of the People’s Republic of China 8: 108. (In Chinese)
Deng RG, Zhang ZY, Zhou DP (2000) Study on the rock mass deformation and slope stability of high-steep slope in the valley area. Southwest Jiaotong University Press, Chengdu, China. (In Chinese)
Huang RQ, Lin F, Chen DJ, et al. (2001) Formation mechanism of unloading fracture zone of high slopes and its engineering behaviors. Journal of Engineering Geology 9(3): 227–232. (In Chinese) DOI: 10.3969/j.issn.1004-9665.2001.03.001
Liu M, Huang RQ, Yan M (2006) Study on stability of water-fog slope on IV–VI ridges of Jinping first stage hydropower station. Chinese Journal of Rock Mechanics and Engineering 25(Supp.1): 2 801–2 807. (In Chinese) DOI: 10.3321/j.issn: 1000-6915.2006.z1.031
Ministry of Water Conservancy and Electric Power: water resources and hydropower planning and design institute. Water Resources and Hydropower geological engineering Manua1 (1985) Water Resources and Electric Power Press, China. (In Chinese)
Nian TK, Luan MT, Yang Q, et al. (2007) Stability analysis of slope reinforced with piles by using strength reduction FEM. Rock and Soil Mechanics 28(Supp.): 558–562. (In Chinese)
Rocscience.Phase2.v5.047 (2004.10.26) 2D plastic finite element program.
Rocscience.Slide.v5.014 (2004.12.9) 2D limit equilibrium slope stability analysis with sensitivity, probability and back Analysis capabilities.
She CX, Cui X (2009) Fem calculation of high intake slope of diversion tunnel on right bank of Changheba Hydropower Station. Chinese Journal of Rock Mechanics and Engineering 28(supp2): 3686–3691. (In Chinese) DOI: 10.3321/j.issn: 1000-6915.2009.z2.056
Shen JR, Lin H (2009) The Compound Method for the Excavation Optimization and Stability Analysis of High Rock Slope. Journal of East China Institute of Technology 32(4): 350–357. (In Chinese) DOI: 10.3969/j.issn.1674-3504.2009.04.008
Sheng Q, Yue ZQ, Lee CF, et al. (2002) Estimating the excavation disturbed zone in the permanent shiplock slopes of the Three Gorges Project, China. International Journal of Rock Mechanics and Mining Sciences 39(2): 165–184. DOI: 10.1016/S1365-1609(02)00015-1
Xu NF (2004) Excavation and reinforcement design for high slope of TGP permanent ship lock. Prestress Technology 44(3): 21–26. (In Chinese) DOI: 10.3321/j.issn:1000-6915.2000.z1.055
Zhou WY, Lin P, Yang Q, et al. (2008) Experimental research on stability of Jinping high slope with three-dimensional geomechanical model. Chinese Journal of Rock Mechanics and Engineering 27(5): 893–901. (In Chinese) DOI: 10.3321/j.issn:1000-6915.2008.05.004
Zhou Z, Gong MF, Lei CD (2006) Research on stability of slope at left abutment of Jinping first stage hydropower station. Chinese Journal of Rock Mechanics and Engineering 25(11): 2298–2304. (In Chinese) DOI: 10.3321/j.issn:1000-6915.2006.11.020
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Tang, Lq., Tang, K., Nie, Dx. et al. High slope stability of diversion power system intake of Jinchuan hydropower station. J. Mt. Sci. 10, 1109–1117 (2013). https://doi.org/10.1007/s11629-013-2418-x
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s11629-013-2418-x