Abstract
The 14 MeV, 400 μA compact cyclotron is under construction at China Institute of Atomic Energy (CIAE). The design of main magnet and the result of beam dynamics in the cyclotron will be described in this paper, including the choice of main parameters of magnet, the method of shimming isochronous field in the compact cyclotron and optimization of the magnetic field in central region. The beam will be accelerated to 14.6 MeV by optimizing the magnet structure.
Similar content being viewed by others
References
Wang Y Y. Status and problems of clinical application of PET-CT new technologies. Chin Health Econom, 2007, 6: 63–66
Zhang T J, Lu Y L, Yin Z G, et al. Overall design of CYCIAE-14, a 14 MeV PET cyclotron. Annu Rev China Inst Atomic Energy, 2010, 1: 79–85
Zhang T J, Li Z G, Chu C J, et al. Comprehensive test stand for high intensity cyclotron development. Chin Sci Bull, 2011, 56: 238–244
CTI. Radioisotope Delivery System RDS111. Printed in U.S.A., 1995. 1–18
Zhong J Q, Zhang T J, Yang J J, et al. 3D finite element analysis method for main magnet design of CYCIAE-100 (in Chinese). Atomic Energy Sci Tech, 2005, 39(2): 110–113
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Zhong, J., Zhang, T., Li, M. et al. The physics design of magnet in 14 MeV cyclotron. Sci. China Phys. Mech. Astron. 54 (Suppl 2), 266–270 (2011). https://doi.org/10.1007/s11433-011-4551-2
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s11433-011-4551-2