Abstract
Cutterhead torque is a crucial parameter for the design and operation of earth pressure balance (EPB) shield tunneling machine. However, the traditional calculation models of cutterhead torque are too rough or exist gross errors under variable geological conditions. In order to improve the precision of the calculation model of cutterhead torque, dynamic operation parameters are considered and a new model is proposed. Experiment is carried out on a Φ1.8 m shield machine test rig and the calculating result with the new model is compared with the experimental data to verify the validity of the new model. The relative error of the new model is as low as 4% at smooth stage and is reduced to 5% at the end of trembling stage. Based on the results of the new model and the test data obtained from the Φ1.8 m test rig and the construction site, the inner relationships between several operation parameters and cutterhead torque are investigated and some quantitative conclusions are obtained.
Similar content being viewed by others
References
Liu Z G, Chen G L, Yu H D, et al. Analysis for dynamic load behavior of shield thrust system considering variable boundary constraints. In: Proceeding of the 2nd International Conference on Intelligent Robotics and Applications, 2009. 307–316
Yang H Y, Shi H, Gong G F, et al. Earth pressure balance control for EPB shield. Sci China Ser E-Tech Sci, 2009, 52(10): 2840–2848
Shi Y, Zhuang Q, Lu J. Design of integral driving system for cutterhead of shield tunneling machine (in Chinese). Road Mach Constr Mech, 2008, 25: 18–20
Wang J Y. Tunneling and technological progress in tunneling in China (in Chinese). Tunnels Underg Struct, 2000, 5: 97–109
Sun J Z, Liu R, Luo Y Q, et al. Electromechanical coupling model for cutterhead driving system of shield machines. In: Proceeding of the 3rd International Conference on Intelligent Robotics and Applications, 2010. 310–317
Girmscheid G, Schexnayder C. Tunnel boring machines. Pract Period Struct Design Construction, 2003, 8(3):150–163
Reilly B J. EPBMs for the north east line project. Tunnel Underg Space Technol, 1999, 14(4): 491–508
Chen K, Hong K R, Wu X S. Shield Construction Technique (in Chinese). Beijing: China Communications Press, 2009
Xiong T, Gong G F, Yang H Y. Torque calculation model of cutting head in shield machine and experimental study (in Chinese). J Zhejiang University (Eng Sci), 2009, 43(10): 1794–1800
Shi H, Gong G F, Yang H Y, et al. Determination of the cutterhead torque for EPB shield tunneling machine. Autom Construction, 2011, 20(8): 1087–1095
Xiong T. Research on hydraulic drive and control system of the cutter head in shield tunneling machine (in Chinese). Dissertation of Doctoral Degree. Hangzhou: Zhejiang University, 2008
Hu G L. Research in to electro-hydraulic control system for a simulator test rig of shield tunneling machine (in Chinese). Dissertation of Doctoral Degree. Hangzhou: Zhejiang University, 2006
Shi H, Gong G F, Yang H Y, et al. Determination of thrust force for shield tunneling machine (in Chinese). J Zhejiang University (Eng Sci), 2011, 45(1): 126–131
Xu Q W, Zhu H H, Ding W Q, et al. Laboratory model tests and field investigations of EPB shield machine tunneling in soft ground in Shanghai. Tunnel Underg Space Technol, 2011, 26: 1–14
Mei G X, Zai J M. A new formula for calculating lateral earth pressure at certain displacement. In: proceeding of Advances in Earth Structures: Research to Practice, 2006, 151: 325–331
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Wang, L., Gong, G., Shi, H. et al. A new calculation model of cutterhead torque and investigation of its influencing factors. Sci. China Technol. Sci. 55, 1581–1588 (2012). https://doi.org/10.1007/s11431-012-4749-1
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s11431-012-4749-1