Abstract
This paper presents a method to identify risk factors during bridge construction. The method integrates the concepts of analytical hierarchy process and fuzzy consistent matrix method. The advantage of the method is that instead of using 9-point scale of relative importance of the conventional analytical hierarchy process, it uses a 3-point scale to describe the scale of importance, thus greatly simplifying the identification problem of risk factors. Moreover, the difficulties of making judgment and comparison caused by uncertainty that jeopardizes the accuracy of the results in the conventional analytical hierarchy process can also be overcome. Another advantage of the method is that it does not involve consistency checking, thus saving a large amount of CPU time. It has been demonstrated with a numerical example that the proposed fuzzy analytical hierarchy process based on 3-point scale can offer significant computational savings over the conventional analytical hierarchy process.
Similar content being viewed by others
References
Wardhana K, Hadipriono F C. Analysis of recent bridge failures in the United States. J Perf Const Fac, ASCE, 2003, 17(3): 144–150
Linstone H A, Turoff M. The Delphi Method: Techniques and Applications. London: Addison-Wesley, 1975
Saaty T L. The Analytic Hierarchy Process. New York: McGraw-Hill, 1980
Bevilacqua M, Braglia M. The analytic hierarchy process applied to maintenance strategy selection. Reliab Eng Syst Saf, 2000, 70(1): 71–83
Wu Z R, Su H Z, Guo H Q. Assessment model of dam operation risk based on monitoring data. Sci China Ser E-Tech Sci, 2007, 50(Suppl): 144–152
Vaidya O S, Kumar S. Analytic hierarchy process: An overview of applications. Euro J Oper Res, 2006, 169(1): 1–29
Basak I. Probabilistic judgments specified partially in the analytic hierarchy process. Euro J Oper Res, 1998, 108: 153–164
Al-Harbi K M A. Application of the AHP in project management. Int J Proj Mgmt, 2001, 19(1): 19–27
Yao M. A kind of adaptive fuzzy system. J Contr Theory Appl, 1998, 15(3): 364–371
Gong C L. Construction risk analysis and countermeasures research of long span cable-stayed bridges (in Chinese). Dissertation od Doctroal Degree. Shanghai: Tongji University, 2006
Author information
Authors and Affiliations
Corresponding author
Additional information
Supported by the National Natural Science Foundation of China (Grant No. 50408037) and the Shanghai Pujiang Program (Grant No. 09PJ1409500)
Rights and permissions
About this article
Cite this article
Cheng, J., Xiao, R. An efficient method for identification of risk factors. Sci. China Ser. E-Technol. Sci. 52, 3626–3631 (2009). https://doi.org/10.1007/s11431-009-0383-y
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s11431-009-0383-y