Abstract
With the enlargement of core rockfill dam construction scale and the improvement of construction mechanization level, the traditional manual construction quality control method is now difficult to meet the quality and safety demands of modern dam construction, so automatic and real-time dam construction quality monitoring with high-techs is urgently needed. The paper makes theoretical research on construction quality real-time monitoring and system integration of core rockfill dam, proposes implementation method and integrated solution of construction quality real-time monitoring of core rockfill dam construction process, realizes refining, all-whether, entire-process and real-time control and analysis on key links of dam construction, and introduces the application of the construction quality real-time monitoring and system integration technology to a practical core rockfill dam project.
Similar content being viewed by others
References
Wang B L, Liu Y Z, Wu H H. New development of China earth and stone dam project construction (in Chinese). Water Power, 2005, 31(1): 63–65
Yu F T, Wang B, Wu Z W, et al. The control practice of Xiaolangdi dam construction (in Chinese). Water Resour Hydrop Eng, 2002, 33(3): 31–33
Chen S P. Construction supervision of Tianshengqiao face rockfill dam (in Chinese). Yangtze River, 2000, 31(8): 29–31
Oloufa A A, Do W, Thomas H R. Automated monitoring of compaction using GPS. In: ASCE Construction Congress Proceedings. Minneapolis: ASCE, 1997. 1004–1011
Do W, Oloufa A A, Thomas H R. Evaluation of global positioning system devices for a quality control system for compaction operations. Transport Res Rec, 1999, 1675(1): 67–74
David J W, Mark J T, Kari J, et al. Field Evaluation of Compaction Monitoring Technology: Phase II. Iowa: Iowa State University, 2006
Anderegg R, Dominik A F, Kuno K. Compaction monitoring using intelligent soil compactors. In: ASCE GeoCongress 2006: Geotechnical Engineering in the Information Technology Age. Atlanta: ASCE, 2006
David J W, Max M, Mark T. Power-based compaction monitoring using vibratory padfoot roller. In: ASCE GeoCongress 2006: Geotechnical Engineering in the Information Technology Age. Atlanta: ASCE, 2006
Huang S X, Liu J N, Wu X M. GPS real-time supervisory system and its preliminary application in the construction of face rockfill dam (in Chinese). Ed Board Geo Inform Sci Wuhan Univ, 2005, 30(9): 813–816
Zhong D H, Zhang P, Wu K X. Theory and practice of construction simulation for high rock-fill dam. Sci China Ser E: Tech Sci, 2007, 50(1): 51–61
Author information
Authors and Affiliations
Corresponding author
Additional information
Supported by the National Natural Science Foundation of China (Grant Nos. 50525927, 50879056)
Rights and permissions
About this article
Cite this article
Zhong, D., Cui, B., Liu, D. et al. Theoretical research on construction quality real-time monitoring and system integration of core rockfill dam. Sci. China Ser. E-Technol. Sci. 52, 3406–3412 (2009). https://doi.org/10.1007/s11431-009-0343-6
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s11431-009-0343-6