Data centres are high-energy consumers, and historical assessment of their environmental impact has focused largely on energy consumption. Widely adopted assessment methods consider either single issues or do not comprehensively assess links between issues. One exception is the CLEER Model, which compares life cycle energy and greenhouse gas (GHG) emissions of Cloud-based and present-day services. However, there remains the need to verify components for inclusion in a data centre life cycle assessment (LCA), assess quality and quantity of secondary data, benchmark an existing data centre LCA, assess non-Cloud-based services for multiple impacts, and establish facility areas that are sensitive to change.

Methods

A hybrid approach, combining process-based and economic input output (EIO) data, was used to perform the screening LCA of an existing UK data centre. The study includes the definition of the goal and scope, modelling assumptions, a life cycle inventory, results and interpretation and a sensitivity check.

Results and discussion

The dominance of the information technology (IT) operational phase to the overall impact and the severity of the impact on human health are concluded. Due to the use of free cooling, the IT-embodied impact is greater than the combined mechanical and electrical operational impact. Electricity production dominates the total life cycle impact; however, the second most significant impact derives from the disposal of metal refining waste products during the manufacture of IT components and electricity distribution networks. The release of carcinogens is one of the largest contributors to the whole life cycle impact and is almost equal in value between the embodied and operational phases. Finally, a sensitivity check found that a Swedish facility optimised for operational energy efficiency with a 1.25-year server refresh resulted in an embodied impact almost double the operational.

Conclusions

It was concluded that current LCI data, software packages and project data allow for a sufficiently accurate data centre LCA model. The results support the need to broaden environmental impact reduction to beyond operational energy consumption for cooling and that building environmental assessment methods (BEAMs) should consider more embodied impacts. It is concluded also that three parameters are sensitive to design changes that influence the overall impact: operational energy for the IT equipment, cooling and power delivery; the energy mix; and the amount of IT equipment across the facility’s lifetime. The results present a clear need to monitor life cycle impact, develop further tools to compare different design/operation options and functional units, improve data and develop an LCA-based BEAM.

This is a preview of subscription content, access via your institution.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7
Fig. 8
Fig. 9
Fig. 10
Fig. 11
Fig. 12
Fig. 13
Fig. 14

References

  1. Angrill S, Farreny R, Gasol C et al (2012) Environmental analysis of rainwater harvesting infrastructure in diffuse and compact urban models of Mediterranean climate. Int J Life Cycle Assess 17(1):25–42

    CAS  Article  Google Scholar 

  2. Barroso LA, Hölzle U (2009) The data centre as a computer: an introduction to the design of warehouse-scale machines. doi:10.2200/s00193ed1v01y200905cac006

  3. Baumann H, Tillman A-M (2009) The hitch hiker’s guide to LCA. Studentlitteratur AB, Sweden

    Google Scholar 

  4. Bribian IZ, Capilla AV, Uson AA (2011) Life cycle assessment of building materials: comparative analysis of energy and environmental impacts and evaluation of the eco-efficiency improvement potential. Build Environ 46(5):1133–1140

    Article  Google Scholar 

  5. BSI (1964) BS 648:1964 schedule of weights of building materials. BSI, London

    Google Scholar 

  6. BSI (2011) BS EN 15978:2011 sustainability of construction works—assessment of environmental performance of buildings—calculation method. BSI, London

    Google Scholar 

  7. Chang J, Meza J, Ranganathan P, Shah A, Shih R, Bash C (2012) Totally green: evaluating and designing servers for lifecycle environmental impact. In: Proceedings of ASPLOS’12, the Seventeenth International Conference on Architectural Support for Programming Languages and Operating Systems, New York, USA, 3–7 March 2012. doi:10.1145/2150976.2150980

  8. Chang Y, Ries RJ, Lei S (2012b) The embodied energy and emissions of high-rise education building: a quantification using process-based hybrid life cycle inventory model. Energy Build 55:790–798

    Article  Google Scholar 

  9. CIBSE (2008) Guide M: maintenance engineering and management (CIBSE guide M). CIBSE, London

    Google Scholar 

  10. Dones R, Bauer C, Bolliger R, Burger B, Heck T, Roder A, Emmenegger MF, Frischknecht R, Jungbluth N, Tuchschmid M (2007) Life cycle inventories of energy systems: results for current systems in Switzerland and other UCTE countries. Data v2.0(2007). Ecoinvent report no. 5. http://www.ecolo.org/documents/documents_in_english/Life-cycle-analysis-PSI-05.pdf. Accessed 26 June 2013

  11. Frischknecht R, Jungbluth N (eds) (2007) Overview and methodology. Data v2.0 (2007). Ecoinvent report no. 1. http://www.ecoinvent.org/fileadmin/documents/en/01_OverviewAndMethodology.pdf. Accessed 25 June 2013

  12. Frischknecht R, Althaus H-J, Bauer C, Doka G, Heck T, Jungbluth N, Kellenberger D, Nemecek T (2007) The environmental relevance of capital goods in life cycle assessments of products and services. Int J Life Cycle Assess 12(Special Issue 1):7–17

    CAS  Google Scholar 

  13. Fujitsu (2010) Life cycle assessment and product carbon footprint. Primergy TX 300S5 and PRIMERGY RX 300 S5 Server. White paper. http://fujitsu.fleishmaneurope.de/wp-content/uploads/2010/12/LCA_PCF-Whitepaper-PRIMERGY-TX-RX-300-S5.pdf. Accessed 1 Feb 2012

  14. Hischier R, Weidema B (eds) (2010) Implementation of life cycle impact assessment methods. Data v2.2. Ecoinvent report no. 3. http://www.ecoinvent.org/fileadmin/documents/en/03_LCIA-Implementation-v2.2.pdf. Accessed 25 June 2013

  15. Intel (2009) The problem of power consumption in servers, InfoQ. http://www.infoq.com/articles/power-consumption-servers. Accessed 2 June 2012

  16. ISO (2006) BS EN ISO 14044:2006 environmental management. Life cycle assessment. Principles and frameworks. BSI, London

    Google Scholar 

  17. ISO (2008) BS ISO 15686–5:2008 buildings & constructed assets—service life planning—part 5: life cycle costing. BSI, London

    Google Scholar 

  18. Koomey JG (2007) Estimating total power consumption by servers in the US and the world. http://sites.amd.com/us/Documents/svrpwrusecompletefinal.pdf. Accessed 8 Oct 2010

  19. Koomey JG (2011) Growth in data center electricity use 2005 to 2010. http://www.analyticspress.com/datacenters.html. Accessed 1 Feb 2012

  20. Langdon D (2011) Spon’s mechanical and electrical services price book 2011. Spon Press, London

    Google Scholar 

  21. LBNL (2014) CLEER model—Cloud energy and emissions research model. Public use model. http://cleermodel.lbl.gov/. Accessed 17 Nov 2014

  22. Lettieri DJ, Shah AJ, Carey VP (2009) Exergy-based environmental design of a computer room air conditioning unit. ASME, Lake Buena Vista. doi:10.1115/IMECE2009-11461

    Google Scholar 

  23. Nicholson AL, Olivetti EA, Gregory JR et al (2009) End-of-life LCA allocation methods: open loop recycling impacts on robustness of material selection decisions. ISSST, Phoenix. doi:10.1109/ISSST.2009.5156769

    Google Scholar 

  24. Norris GA (2006) Social impacts in product life cycles. Towards life cycle attribute assessment. Int J Life Cycle Assess 11(Special Issue 1):97–104

    Article  Google Scholar 

  25. Prek M (2004) Environmental impact and life cycle assessment of heating and air conditioning systems, a simplified case study. Energy Build 36(10):1021–1027

    Article  Google Scholar 

  26. Ramakrishnan N, Marwah M, Shah A, Patnaik D, Hossain MS, Sundaravaradan N, Patel C (2012) Data mining solutions for sustainability problems. IEEE Potentials 31(6):28–34

    Article  Google Scholar 

  27. Sára B, Scimìa E, Cappellaro F, Maccallini V, Masoni P (2006) Life cycle assessment of an innovative uninterruptible power supply system to investigate on environmental performance. Care Innovation, Vienna, Austria. http://www.ecosmes.net/pneumaprj/web/jsp/utils/docsView.jsp?d=30&l=EN. Accessed 29 March 2011

  28. Schmidt M, Hottenroth H, Schottler M, Fetzer G, Schlüter B (2011) Life cycle assessment of silicon wafer processing for microelectronic chips and solar cells. Int J Life Cycle Assess 17(2):126–144

    Article  Google Scholar 

  29. Shah A, Lugo W, Patel C (2009) Thermodynamics-based object-oriented environmental design of an industrial air conditioner. ASME, San Francisco. doi:10.1115/HT2009-88105

    Google Scholar 

  30. Shah A, Chen Y, Bash CE (2012) Sources of variability in data center lifecycle assessment. In: Proceedings of IEEE International Symposium on Sustainable Systems and Technology (ISSST), Boston. doi:10.1109/ISSST.2012.6227975

  31. Skaar C, Jørgensen RB (2013) Integrating human health impact from indoor emissions into an LCA: case study evaluating the significance of the use stage. Int J Life Cycle Assess 18(3):636–646

    CAS  Article  Google Scholar 

  32. Song Q, Wang Z, Li J, Yuan W (2012) Life cycle assessment of desktop PCs in Macau. Int J Life Cycle Assess 8(13):553–566

    Google Scholar 

  33. The Green Grid (2012) Data centre life cycle assessment guidelines. White Paper #45, v2. http://www.thegreengrid.org/library-and-tools.aspx. Accessed 20 Nov 2012

  34. The Green Grid (2013) Electronics disposal efficiency (EDE): an IT recycling metric for enterprises and data centers. White Paper #53. http://www.thegreengrid.org/library-and-tools.aspx. Accessed 7 Mar 2013

  35. Uddin M, Rahman AA (2012) Energy efficiency and low carbon enabler green IT framework for data centers considering green metrics. Renew Sustain Energy Rev 16(6):4078–4094

    Article  Google Scholar 

  36. US Department of Labor Bureau of Statistics (2012) Consumer price index. All urban consumers. US city average. All items. ftp://ftp.bls.gov/pub/special.requests/cpi/cpiai.txt. Accessed 2 Feb 2012

  37. US Census Bureau (2011a) The 2012 statistical abstract: historical data. http://www.census.gov/compendia/statab/hist_stats.html. Accessed 2 Feb 2012

  38. US Census Bureau (2011b) No. HS-36. Consumer and gross domestic price indexes: 1913 to 2002. http://www.census.gov/statab/hist/HS-36.pdf. Accessed 2 Feb 2012

  39. VROM—Ministry of Housing, Spatial Planning and the Environment (2000) Eco-indicator 99 manual for designers. http://www.pre-sustainability.com/content/reports. Accessed 19 Mar 2013

  40. Weidema BP, Wesnaes MS (1996) Data quality management for life cycle inventories—an example of using data quality indicators. J Clean Prod 4(3–4):167–174

    Article  Google Scholar 

  41. Whitehead B, Andrews D, Shah A, Maidment G (2014a) Assessing the environmental impact of data centres part 1: background, energy use and metrics. Build Environ 82:151–159

    Article  Google Scholar 

  42. Whitehead et al (2014b) Assessing the environmental impact of data centres part 2: building environmental assessment methods and life cycle assessment. Build Environ. doi:10.1016/j.buildenv.2014.08.015

    Google Scholar 

  43. WRAP (2010) CON900-001: construction, demolition and excavation waste arisings, use and disposal for England 2008. http://www.wrap.org.uk/downloads/CDEW_arisings_use_and_disposal_for_England_2008.1e8085ab.9526.pdf. Accessed 3 Jan 2012

Download references

Acknowledgments

This paper has been developed with the financial support of the Engineering and Physical Sciences Research Council (EPSRC) and HP, who have also gone to great lengths to share their knowledge and expertise in the fields of data centres and sustainable IT. Additional support and review of work was provided by supervisors: Dr Robert Tozer, Dr Alan Dunn, Professor Graeme Maidment and Sophia Flucker. A final thank you should go to Almut Beate Heinrich and Walter Klöpffer for their input in publishing this paper.

Author information

Affiliations

Authors

Corresponding author

Correspondence to Beth Whitehead.

Additional information

Responsible editor: Walter Klöpffer

Electronic supplementary material

Below is the link to the electronic supplementary material.

ESM 1

(DOCX 222 kb)

ESM 2

(DOCX 53 kb)

ESM 3

(DOCX 109 kb)

ESM 4

(DOCX 47 kb)

Rights and permissions

Reprints and Permissions

About this article

Verify currency and authenticity via CrossMark

Cite this article

Whitehead, B., Andrews, D. & Shah, A. The life cycle assessment of a UK data centre. Int J Life Cycle Assess 20, 332–349 (2015). https://doi.org/10.1007/s11367-014-0838-7

Download citation

Keywords

  • Case study
  • Data centres
  • Hybrid LCA
  • LCA results and sensitivity
  • Life cycle assessment (LCA)
  • Screening LCA