Abstract
Water saving management contract (WSMC) is a new water-saving strategy based on market mechanism. As a period for the water saving service company (WSSC) to provide funds and technology to water user, contract period is one of the key elements in WSMC projects. This paper attempted to establish a model to determine the optimal contract period based on equipment replacement. First, the performance degradation simulation of water-saving equipment was constructed based on degradation path model. Second, water-saving process simulation under equipment replacement was established based on measured renewal cycle of water-saving equipment. Third, a contract period optimization model for WSMC projects was built with the objective of maximizing WSSC profit net present value (NPV) and with constraints of water user incentive constraint, WSSC rational constraint, and minimal cooperation duration. Finally, a WSMC project case in China was studied and the solutions were compared with traditional model. The results showed that the optimal contract period in this paper was 3 years longer than the one in traditional model. Meanwhile, the measured equipment renewal cycle was 7 years and it was less than the estimated economic lifetime. Based on the 9-year contract, the water user’s revenue was higher with 55.8% than original contract, while WSSC’s profit loss was lower with 60.8% than the traditional results. The findings reveal that the implementation of an equipment replacement plan considerably boost the revenue of participants and assist WSSC in obtaining more profit.
Similar content being viewed by others
Availability of Data and Material
The data sets supporting the results of this article are included within the article.
References
An X, Wang X, Hu H, Pang S (2021) Optimal allocation of regional water resources under water saving management contract. J Data Inform Manage 3:281–296. https://doi.org/10.1007/s42488-021-00059-x
Bajany DM, Zhang L, Xu Y, Xia X (2021) Optimisation approach toward water management and energy security in Arid/Semiarid regions. Environ Processes 8:1455–1480. https://doi.org/10.1007/s40710-021-00537-9
Chen J, Zhang L, Zhang F et al (2022) A combination weighting method for the risk evaluation of water saving management contract. J Uncertain Syst 15:2250001. https://doi.org/10.1142/S1752890922500015
Chen Z, Zheng S (2005) Lifetime distribution based degradation analysis. IEEE Trans Reliab 54:3–10. https://doi.org/10.1109/TR.2004.837519
Deng Q, Zhang L, Cui Q, Jiang X (2014) A simulation-based decision model for designing contract period in building energy performance contracting. Build Environ 71:71–80. https://doi.org/10.1016/j.buildenv.2013.09.010
Fang C, Marle F (2012) A simulation-based risk network model for decision support in project risk management. Decis Support Syst 52:635–644. https://doi.org/10.1016/j.dss.2011.10.021
Ferrante M, Rogers D, Mugabi J, Casinini F (2023) Addressing water meter inaccuracies caused by intermittent water supply: a laboratory investigation of remedial measures. Water Resour Manage 37:3921–3933. https://doi.org/10.1007/s11269-023-03532-x
Gao H, Cui L, Dong Q (2020) Reliability modeling for a two-phase degradation system with a change point based on a Wiener process. Reliab Eng Syst Saf 193:106601. https://doi.org/10.1016/j.ress.2019.106601
Guo K, Zhang L, Wang T (2021) Concession period optimisation in complex projects under uncertainty: a public–private partnership perspective. Constr Manage Econ 39:156–172. https://doi.org/10.1080/01446193.2020.1849752
Hu H, Wang X, Gao Z, Guo H (2021) A real option-based valuation model for Shared Water saving management contract. J Clean Prod 289:125442. https://doi.org/10.1016/j.jclepro.2020.125442
Jin H, Liu S, Sun J, Liu C (2021) Determining concession periods and minimum revenue guarantees in public-private-partnership agreements. Eur J Oper Res 291:512–524. https://doi.org/10.1016/j.ejor.2019.12.013
Khanzadi M, Nasirzadeh F, Alipour M (2012) Integrating system dynamics and fuzzy logic modeling to determine concession period in BOT projects. Autom Constr 22:368–376. https://doi.org/10.1016/j.autcon.2011.09.015
Liu X, Wang X, Guo H, An X (2021) Benefit allocation in shared water-saving management contract projects based on modified expected shapley value. Water Resour Manage 35:39–62. https://doi.org/10.1007/s11269-020-02705-2
Liu B, Zhao X, Liu G, Liu Y (2020) Life cycle cost analysis considering multiple dependent degradation processes and environmental influence. Reliab Eng Syst Saf 197:106784. https://doi.org/10.1016/j.ress.2019.106784
López-Ruiz S, Ibáñez-Rueda N, Guardiola J, González-Gómez F (2023) Does the ownership of water utilities influence water-saving advice provided to service users? An analysis of the spanish water sector. Water Resour Manage 37:3299–3318. https://doi.org/10.1007/s11269-023-03503-2
Ma W, Li X, Wang X (2021) Water saving management contract, identification and ranking of risks based on life cycle and best-worst method. J Clean Prod 306:127153. https://doi.org/10.1016/j.jclepro.2021.127153
Ng T, Xie J, Cheung Y, Jefferies M (2007) A simulation model for optimizing the concession period of public–private partnerships schemes. Int J Project Manage 25:791–798. https://doi.org/10.1016/j.ijproman.2007.05.004
Oliveira R, Loschi RH, Freitas MA (2018) Skew-Heavy-Tailed degradation models: an application to train wheel degradation. IEEE Trans Reliab 67:129–141. https://doi.org/10.1109/TR.2017.2765485
Otaki Y, Otaki M, Aramaki T (2017) Combined methods for quantifying end-uses of residential indoor water consumption. Environ Processes 4:33–47. https://doi.org/10.1007/s40710-016-0204-9
Peng C, Cheng Y (2020) Student-t processes for degradation analysis. Technometrics 62:223–235. https://doi.org/10.1080/00401706.2019.1630008
Peng W, Huang H, Xie M et al (2013) A bayesian approach for system reliability analysis with multilevel pass-fail, lifetime and degradation data sets. IEEE Trans Reliab 62:689–699. https://doi.org/10.1109/TR.2013.2270424
Pérez-Alarcón A, Garcia-Cortes D, Fernández-Alvarez JC, Martínez-González Y (2022) Improving monthly rainfall forecast in a watershed by combining neural networks and autoregressive models. Environ Processes 9:53. https://doi.org/10.1007/s40710-022-00602-x
Shen L, Wu Y (2005) Risk concession model for build/operate/transfer contract projects. J Constr Eng Manag 131:211–220. https://doi.org/10.1061/(ASCE)07339364(2005)131:2(211)
Shi H (2021) Performance of community-based water-saving technology under land fragmentation: evidence from groundwater overexploitation in the North China Plain. Water Policy 23:1542–1555. https://doi.org/10.2166/wp.2021.138
Shi H, Wang X, Guo H, Hao H (2020) Risk assessment models to investigate the impact of emergency on a water supply system. Water Supply 20:3542–3556. https://doi.org/10.2166/ws.2020.224
Trianni A, Cagno E, Farné S (2016) Barriers, drivers and decision-making process for industrial energy efficiency: a broad study among manufacturing small and medium-sized enterprises. Appl Energy 162:1537–1551. https://doi.org/10.1016/j.apenergy.2015.02.078
Ungureanu N, Vlăduț V, Voicu G (2020) Water scarcity and wastewater reuse in crop irrigation. Sustainability 12:9055. https://doi.org/10.3390/su12219055
Veloso GA, Loschi RH (2021) Dynamic linear degradation model: dealing with heterogeneity in degradation paths. Reliab Eng Syst Saf 210:107446. https://doi.org/10.1016/j.ress.2021.107446
Wang W (2012) An overview of the recent advances in delay-time-based maintenance modelling. Reliab Eng Syst Saf 106:165–178. https://doi.org/10.1016/j.ress.2012.04.004
Wang Z, Cao J, Ma X et al (2017) An improved independent increment process degradation model with bilinear properties. Arab J Sci Eng 42:2927–2936. https://doi.org/10.1007/s13369-016-2383-0
Wang X, Li W, Guo H, Li R (2022) A risk assessment model of WSMC projects under emergencies. Water Supply 22:1503–1520. https://doi.org/10.2166/ws.2021.339
Wang Y, Li Q, Zuo J, Bartsch K (2022) How did balance loss occur? A cross-stakeholder analysis of risk misallocation in a Sponge city PPP project. Water Resour Manage 36:5225–5240. https://doi.org/10.1007/s11269-022-03301-2
Wang W, Ren L, Deng C et al (2022) The water-saving management contract in China: current status, existing problems, and countermeasure suggestions. Water (Basel) 14:3116. https://doi.org/10.3390/w14193116
Xu A, Wang Y, Zheng S, Cai F (2020) Bias reduction in the two-stage method for degradation data analysis. Appl Math Model 77:1413–1424. https://doi.org/10.1016/j.apm.2019.08.024
Yao M, Tramberend S, Kabat P et al (2017) Building regional water-use scenarios consistent with global shared socioeconomic pathways. Environ Processes 4:15–31. https://doi.org/10.1007/s40710-016-0203-x
Ye Z, Tang L, Xie M (2011) A burn-in scheme based on percentiles of the residual life. J Qual Technol 43:334–345. https://doi.org/10.1080/00224065.2011.11917868
Ye S, Tiong RLK (2000) NPV-at-risk method in infrastructure project investment evaluation. J Constr Eng Manag 126:227–233. https://doi.org/10.1061/(ASCE)07339364(2000)126:3(227)
Ye Z, Xie M (2015) Stochastic modelling and analysis of degradation for highly reliable products. Appl Stoch Models Bus Ind 31:16–32. https://doi.org/10.1002/asmb.2063
Yu C, Lam K (2013) A decision support system for the determination of concession period length in transportation project under BOT contract. Autom Constr 31:114–127. https://doi.org/10.1016/j.autcon.2012.11.012
Zhang X (2011) Web-based concession period analysis system. Expert Syst Appl 38:13532–13542. https://doi.org/10.1016/j.eswa.2011.04.030
Zhang X, Bao H, Wang H, Skitmore M (2016) A model for determining the optimal project life span and concession period of BOT projects. Int J Project Manage 34:523–532. https://doi.org/10.1016/j.ijproman.2016.01.005
Zhang S, Fu H, Wang Y (2021) The impact of the water commonweal propaganda on citizens’ water-saving behavior: the intermediary role of propaganda channels and forms – evidence from China. Water Policy 23:1468–1488. https://doi.org/10.2166/wp.2021.121
Zhang J, Zong Y, Zhang X et al (2019) Two optimized models of life prediction based on luminance degradation for VFD under a conventional life test. Qual Reliab Eng Int 35:155–164. https://doi.org/10.1002/qre.2388
Funding
This work was supported by National Natural Science Foundation of China (No.61873084). National Natural Science Foundation of China, 61873084, Xiaosheng Wang.
Author information
Authors and Affiliations
Contributions
Wei Li analyzed the data and was a major contributor in writing the manuscript. Xiaosheng Wang provided the idea of the optimization model. Qian Zhang collected the data. All authors read and approved the final manuscript.
Corresponding author
Ethics declarations
Ethical Approval
Not applicable.
Consent to Participate
Not applicable.
Consent to Publish
Not applicable.
Competing Interests
The authors have no relevant financial or non-financial interests to disclose.
Additional information
Publisher's Note
Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.
Rights and permissions
Springer Nature or its licensor (e.g. a society or other partner) holds exclusive rights to this article under a publishing agreement with the author(s) or other rightsholder(s); author self-archiving of the accepted manuscript version of this article is solely governed by the terms of such publishing agreement and applicable law.
About this article
Cite this article
Li, W., Wang, X. & Zhang, Q. A Contract Period Optimization Model for Water Saving Management Contract Project Based on Equipment Replacement. Water Resour Manage 37, 5725–5741 (2023). https://doi.org/10.1007/s11269-023-03626-6
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s11269-023-03626-6