A Contract Period Optimization Model for Water Saving Management Contract Project Based on Equipment Replacement

  • Published:
Water Resources Management Aims and scope Submit manuscript

Abstract

Water saving management contract (WSMC) is a new water-saving strategy based on market mechanism. As a period for the water saving service company (WSSC) to provide funds and technology to water user, contract period is one of the key elements in WSMC projects. This paper attempted to establish a model to determine the optimal contract period based on equipment replacement. First, the performance degradation simulation of water-saving equipment was constructed based on degradation path model. Second, water-saving process simulation under equipment replacement was established based on measured renewal cycle of water-saving equipment. Third, a contract period optimization model for WSMC projects was built with the objective of maximizing WSSC profit net present value (NPV) and with constraints of water user incentive constraint, WSSC rational constraint, and minimal cooperation duration. Finally, a WSMC project case in China was studied and the solutions were compared with traditional model. The results showed that the optimal contract period in this paper was 3 years longer than the one in traditional model. Meanwhile, the measured equipment renewal cycle was 7 years and it was less than the estimated economic lifetime. Based on the 9-year contract, the water user’s revenue was higher with 55.8% than original contract, while WSSC’s profit loss was lower with 60.8% than the traditional results. The findings reveal that the implementation of an equipment replacement plan considerably boost the revenue of participants and assist WSSC in obtaining more profit.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5

Similar content being viewed by others

Availability of Data and Material

The data sets supporting the results of this article are included within the article.

References

Download references

Funding

This work was supported by National Natural Science Foundation of China (No.61873084). National Natural Science Foundation of China, 61873084, Xiaosheng Wang.

Author information

Authors and Affiliations

Authors

Contributions

Wei Li analyzed the data and was a major contributor in writing the manuscript. Xiaosheng Wang provided the idea of the optimization model. Qian Zhang collected the data. All authors read and approved the final manuscript.

Corresponding author

Correspondence to Xiaosheng Wang.

Ethics declarations

Ethical Approval

Not applicable.

Consent to Participate

Not applicable.

Consent to Publish

Not applicable.

Competing Interests

The authors have no relevant financial or non-financial interests to disclose.

Additional information

Publisher's Note

Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Rights and permissions

Springer Nature or its licensor (e.g. a society or other partner) holds exclusive rights to this article under a publishing agreement with the author(s) or other rightsholder(s); author self-archiving of the accepted manuscript version of this article is solely governed by the terms of such publishing agreement and applicable law.

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Li, W., Wang, X. & Zhang, Q. A Contract Period Optimization Model for Water Saving Management Contract Project Based on Equipment Replacement. Water Resour Manage 37, 5725–5741 (2023). https://doi.org/10.1007/s11269-023-03626-6

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s11269-023-03626-6

Keywords

Navigation