A methodology to incorporate long-term goals within the short-term reservoir operation optimization model is proposed. Two conflicting objectives for the management of hydropower generation in two different power plants are incorporated. A chance-constrained optimization model is used to derive long-term (annual) operation strategies. With the time horizon of operation for the short-term optimization model kept equal to a single time-step of the long-term optimization model, the optimum end storages derived from the long-term model are incorporated as constraints (storage lower bounds) within the short-term model. The long-term benefits accrued from such an operation model are illustrated for a small reservoir, in South India. The solutions are compared with the historic operation. These are also compared with the solutions of a short-term optimal operation model ignoring long-term goals. The optimization model is solved using a multi-objective genetic algorithm.

This is a preview of subscription content, access via your institution.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7
Fig. 8
Fig. 9

References

  1. Afzali R, Mousavi SJ, Ghaheri A (2008) Reliability based simulation-optimization model for multi reservoir hydropower system operations: Khersan experience. J Water Resour Plann Manag 134(1):24–33

    Article  Google Scholar 

  2. Ahmed JA, Sarma AK (2005) Genetic algorithm for optimal operating policy of a multipurpose reservoir. Water Resour Manag 19(2):145–161

    Article  Google Scholar 

  3. Akter T, Simonovic SP (2004) Modeling uncertainties in short-term reservoir operation using fuzzy sets and a genetic algorithm. Hydrolog Sci J 49(6):1079–1081

    Article  Google Scholar 

  4. Alcigeimes BC, Billib M (2012) Improving stochastic reservoir optimization models with long term mean inflow forecast. Water Resour Manag. doi:10.1007/s11269-012-0025-1

  5. Alcigeimes BC, Suzuki K, Akihiro K (2008) Integrating long- and short-term reservoir operation models via stochastic and deterministic optimization: case study in Japan. J Water Resour Plann Manag 134(5):440–448

    Article  Google Scholar 

  6. Barros MTL, Tsai FT-C, Yang Shu-li, Lopes JEG, Yeh WW-G (2003) Optimization of large scal hydropower system operation. J Water Resour Plann Manag 129(3):178–188

    Article  Google Scholar 

  7. Chang F-J, Chen L, Chang Li Chiu (2005) Optimizing the reservoir operating rule curves by genetic algorithms. Hydrolog Process 19(11):2277–2289

    Article  Google Scholar 

  8. Cheng C-T, Wang W-C, Xu D-M, Chau KW (2007) Optimizing hydropower reservoir operation using hybrid genetic algorithm and chaos. Water Resour Manag 22(7):895–909

    Article  Google Scholar 

  9. Datta B, Burges SJ (1984) Short-termsingle multi-purpose reservoir operation: importance of loss functions and forecast errors. Water Resour Res 20(9):1167–1186

    Article  Google Scholar 

  10. Deb K (2001) Multi-objective optimization using evolutionary algorithms. Wiley, New York

    Google Scholar 

  11. Duffuaa SO (1991) A chance-constrained model for the operation of the Aswan high dam. Eng Optim 17:109–121

    Article  Google Scholar 

  12. Ferreira AR, Teegavarapu RSV (2012) Optimal and adaptive operation of a hydropower system with unit commitment and water quality constraints. Water Resour Manag 26(3):707–732

    Article  Google Scholar 

  13. Grygier JC, Stedinger JR (1985) Algorithms for optimizing hydropower system operation. Water Resour Res 21(1):1–10

    Article  Google Scholar 

  14. Jyothiprakash V, Shanthi G, Arunkumar R (2011) Development of operational policy for a multi-reservoir system in India using genetic algorithm. Water Resour Manag 25(10):2405–2423

    Article  Google Scholar 

  15. Ko S-K, Fontane DG, Labadie JW (1992) Multi-objective optimization of reservoir systems operation. J Am Water Resour Assoc 28(1):111–127

    Article  Google Scholar 

  16. Labadie JW (2004) Optimal operation of multi-reservoir systems: state-of-the-art review. J Water Resour Plann Manag 130(2):93–111

    Article  Google Scholar 

  17. Louati MH, Sihem B, Lebdi F, Darko M (2011) Application of a Genetic Algorithm for the Optimization of a Complex Reservoir System in Tunisia. Water Resour Manag 25(10):2387–2404

    Article  Google Scholar 

  18. Reddy JM, Kumar DN (2006) Optimal reservoir operation using multi-objective evolutionary algorithm. Water Resour Manag 20(6):861–878

    Article  Google Scholar 

  19. Reddy JM, Nagesh Kumar D (2007a) Multi-objective differential evolution with application to reservoir system optimization. J Comput Civ Eng 21(2):136–146

    Article  Google Scholar 

  20. Reddy JM, Nagesh Kumar D (2007b) Multi-objective particle swarm optimization for generating optimal trade-offs in reservoir operation. Hydrolog Process 21(21):2897–2909, Wiley InterScience

    Article  Google Scholar 

  21. Reddy JM, Nagesh Kumar D (2009) Performance evaluation of elitist-mutated multi-objective particle swarm optimization for integrated water resources management. J Hydroinformatics 11(1):79–88, IWA Publishing

    Article  Google Scholar 

  22. Sharif M, Wardlaw R (2000) Multi-reservoir systems optimization using genetic algorithms: case study. J Comput Civ Eng 14(4):255–263

    Article  Google Scholar 

  23. Sreenivasan KR, Vedula S (1996) Reservoir operation for hydropower optimization: a chance constrained approach. Academy proceedings in Engineering Sciences 21(4):503–510

    Google Scholar 

  24. Vedula S, Mohan S (1990) Real-time multi-purpose reservoir operation: a case study. Hydrolog Sci 35(4):447–462

    Article  Google Scholar 

  25. Yuan X, Yua Y, Zhang Y (2002) A hybrid chaotic genetic algorithm for short-term hydro system scheduling. Math Comput Simulat 59(4):319–327

    Article  Google Scholar 

  26. Yun R, Singh VP, Dong Z (2010) Long-term stochastic reservoir operation using a noisy genetic algorithm. Water Resour Manag 24(12):3159–3172

    Article  Google Scholar 

Download references

Author information

Affiliations

Authors

Corresponding author

Correspondence to J. Sreekanth.

Rights and permissions

Reprints and Permissions

About this article

Cite this article

Sreekanth, J., Datta, B. & Mohapatra, P.K. Optimal Short-term Reservoir Operation with Integrated Long-term Goals. Water Resour Manage 26, 2833–2850 (2012). https://doi.org/10.1007/s11269-012-0051-z

Download citation

Keywords

  • Reservoir operation
  • Short-term, long-term optimization
  • Hydro-power
  • Multi-objective genetic algorithm