Abstract
Water resources management has been of concern for many researchers since the contradiction between increased water demand and decreased water supply has become obvious. In the real world, water resources systems usually have complexities among social, economic, natural resources and environmental aspects, which leads to multi-objective problems with significant uncertainties in system parameters, objectives, and their interactions. In this paper, a multi-objective linear programming model with interval parameters has been developed wherein an interactive compromising algorithm has been introduced. Through interactive compromising conflicts among multi-objectives, a feasible solution vector can be obtained. The developed model is then applied to allocation of multi-source water resources with different water qualities to multiple users with different water quality requirements for the Dalian city for 2010, 2015 and 2020 planning years. The model pursues the maximum synthesis benefits of economy, society and the environment. The results indicate that the proportion of reused water to the total water amount is gradually increasing, and the proportion of agricultural water consumption to the total water consumption is gradually decreasing. The allocation of multi-source water resources to multiple users is improved due to incorporation of uncertain factors into the model that provide useful decision support to water management authorities.
Similar content being viewed by others
References
Abrishamchi A, Ebrahimian A, Tajrishi M et al (2005) Case study: application of multicriteria decision making to urban water supply. J Water Resour Plan Manage 131(4):326–335
Benayoun R, Montgolfier J, Tergny J et al (1971) Linear programming with multiple objective function: step method (STEM). Math Program 1(1):366–375
Chang NB, Wen CG, Wu SL (1994) Optimal management of environmental and land resources in a reservoir watershed by multi-objective programming. J Environ Manag 44(2):145–160
Han Y, Xu SG, Xu XZ (2008) Modeling multisource multiuser water resources allocation. Water Resour Manag 22(7):911–923
Higgins AJ, Archer A, Hajkowicz S (2008) A stochastic non-linear programming model for a multi-period water resource allocation with multiple objectives. Water Resour Manag 22(10):1445–1460
Huang GH, Loucks DP (2000) An inexact two-stage stochastic programming model for water resources management under uncertainty. Civ Eng Environ Syst 17:95–118
Huang GH, Moore RD (1993) Grey linear programming, its solving approach, and its application. Int J Syst Sci 24:159–172
Huang GH, Baetz BW, Patry GG (1992) A grey linear programming approach for municipal solid waste management planning under certainty. Civ Eng Syst 9:319–335
Huang GH, Baetz BW, Patry GG (1993) A grey fuzzy linear programming approach for municipal solid waste management planning under uncertainty. Civ Eng Syst 10:123–146
Huang GH, Baetz BW, Patry GG (1995) Grey fuzzy integer programming: an application to regional waste management planning under uncertainty. Socio-Econ Plann Sci 29(1):17–38
Jairaj PG, Vedula S (2000) Multireservoir system optimization using fuzzy mathematical programming. Water Resour Manag 14(6):457–472
Li YP, Huang GH, Nie SL (2006) An interval-parameter multi-stage stochastic programming model for water resources management under uncertainty. Adv Water Resour 29:776–789
Li YP, Huang GH, Yang ZF, Nie SL (2008) IFMP: interval-fuzzy multistage programming for water resources management under uncertainty. Resour Conserv Recycl 52:800–812
Lu HW, Huang GH, Zeng GM et al (2008) An inexact two-stage fuzzy-stochastic programming model for water resources management. Water Resour Manag 22(8):991–1016
Maqsood I, Huang GH, Huang YF (2005) ITOM: an interval-parameter two-stage optimization model for stochastic planning of water resources systems. Stoch Environ Res Risk Assess 19:125–133
Ndambuki JM, Otieno FAO, Stroet CBM et al (2000) Groundwater management under uncertainty: a multi-objective approach. Water SA 26(1):35–42
Planning Committee of Dalian (2001) Tenth five-year programming about water resources guarantee in Dalian. (In Chinese)
Sakawa M, Kato K, Nishizaki I (2003) An interactive fuzzy satisficing method for multiobjective stochastic linear programming problems through an expectation model. Eur J Oper Res 145:665–672
Simonovic SP, Nirupama A (2005) A spatial multi-objective decision-making under uncertainty for water resources management. J Hydroinform 7:117–133
Urli B, Nadeau R (1992) An interactive method to multiobjective linear programming problems with interval coefficients. INFOR 30:127–137
Wang LZ, Fang L, Hipel KW (2003) Water resources allocation: a cooperative game theoretic approach. J Environ Inform 2(2):11–22
Wang LJ, Meng W, Guo HC et al (2006) An interval fuzzy multiobjective watershed management model for the Lake Qinghai watershed, China. Water Resour Manag 20(5):701–721
Wu SM, Huang GH (2007) An interval-parameter fuzzy approach for multiobjective linear programming under uncertainty. Journal of Mathematical Modelling and Algorithms 6(2):195–212
Wu SM, Huang GH, Guo HC (1997) An interactive inexact-fuzzy approach for multiobjective planning of water resources systems. Wat Sci Tech 36(5):235–242
Zimmermann HJ (1978) Fuzzy programming and linear programming with several objective functions. Fuzzy Sets Syst 1:45–55
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Han, Y., Huang, YF., Wang, GQ. et al. A Multi-objective Linear Programming Model with Interval Parameters for Water Resources Allocation in Dalian City. Water Resour Manage 25, 449–463 (2011). https://doi.org/10.1007/s11269-010-9708-7
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s11269-010-9708-7