Abstract
Studies involving stabilization of saturated soils prior to opening the upper level of the connector between the Serebryanoborsk transportation and service tunnels in Moscow are described.
Similar content being viewed by others
References
O. S. Baidakov, “Use of “Microdur” materials for injection operations involving soil stabilization and strengthening of structures,” Metro Tonneli, No. 6, 34–38 (2005).
V. M. Korolev, O. E. Smirnov, and É. S. Argal, Experience with some new injection materials for waterproofing on Moscow projects, Seminar “Waterproofing of Underground Structures”: Theses of Papers And Communications [in Russian], Reklamno-izdatel’skii Tsentr Tonnel’noi Assotsiatsii Rossii, Moscow (2005), pp. 44–47.
V. M. Korolev, O. E. Smirnov, É. S. Argal, and V. A. Ashikhmen, “Trial production work on soil stabilization with finely disperse cement prior to tunnel construction,” Podzem. Prostr. Mira, No. 1/2, 9–15 (2005).
É. S. Argal, V. A. Ashikhmen, V. M. Korolev, and L. A. Pronina, Trial works on soil consolidation before tunnel construction, Proceedings of the Fifth International Conference of the ISSMGE “Geotechnical Aspects of Underground Construction in Soft Ground”, (IS-Amsterdam, 2005), London (2006), pp. 351–356.
I. I. Broid, Jet Geotechnology [in Russian], Izdatel’stvo Assotsiatsii Stroitel’nykh Vyuzov, Moscow (2004).
Author information
Authors and Affiliations
Additional information
__________
Translated from Osnovaniya, Fundamenty i Mekhanika Gruntov, No. 4, pp. 10–14, July–August, 2006.
Rights and permissions
About this article
Cite this article
Korolev, V.M., Smirnov, O.E., Argal, É.S. et al. Experience with microcement stabilization of soils. Soil Mech Found Eng 43, 125–130 (2006). https://doi.org/10.1007/s11204-006-0035-1
Issue Date:
DOI: https://doi.org/10.1007/s11204-006-0035-1