Abstract
This paper analyzes the efficiency of an explicit ex ante auction for network access to facilitating trade between two separate, but linked, electricity wholesale markets. It is generally assumed that greater regional interconnection will mitigate the exercise of local market power by dominant generators, but we show analytically that when a dominant player has access to a more competitive neighboring market, and is also the lowest cost producer, the exercise of market power becomes attractive and can have negative consumer welfare implications. For an empirical analysis, we use a unique data set of daily company-level flow nominations on the Anglo-French Interconnector (IFA). This provides a clear case study, “free of loop flows” (with the IFA being the only link between the UK and France). We are able to identify evident inefficiencies in the market behavior, for which several explanations, including market power, may contribute.
Similar content being viewed by others
References
Bonardi J.-P. (2004) Global and political strategies in deregulated industries: The asymmetric behaviors of formers monopolies. Strategic Management Journal 25(2): 101–120
Borenstein S., Bushnell J., Stoft S. (2000) The competitive effects of transmission capacity in a deregulated electricity industry. RAND Journal of Economics 31(2): 294–325
CONSENTEC & Frontier Economics. (2004). Analysis of cross-border congestion management methods. Study commissioned by the European commission (DG energy and transport).
DTI. (2005). Statutory consultation on the licensing of existing gas and electricity interconnectors under the terms of the gas act 1986, the electricity act 1989 and the energy act 2004.
EC. (2003). Regulation (EC) No 1228/2003 of the European parliament and of the council of 26 June 2003 on conditions for access to the network for cross-border exchanges in electricity.
EC. (2007). Energy sector inquiry final report. European commission. DG competition. http://ec.europa.eu/comm/competition/sectors/energy/inquiry/index.html.
EFET. (2004). Assessment of congestion management at European borders. European federation of energy traders (EFET). Paper for the 11th florence forum, 16–17 September 2004.
Ehrenmann A., Smeers Y. (2005) Inefficiencies in European congestion management proposals. Utilities Policy 13(2): 135–152
ETSO. (2004). An overview of current cross-border congestion management methods in Europe. Brussels: European Transmission System Operators.
Gilbert R., Neuhoff K., Newbery D. (2004) Allocating transmission to mitigate market power in electricity networks. RAND Journal of Economics 35(4): 691–709
Glachant J. M., Pignon V. (2005) Nordic congestion’s arrangement as a model for Europe?. Physical constraints and Economic Incentives, Utilities Policy 13(2): 153–162
Hoeffler, F., & Wittmann, T. (2006). Netting of capacity in interconnector auctions (March 2006). MPI collective goods preprint no. 2006/5 Available at SSRN: http://ssrn.com/abstract=888687.
Inderst, R., & Ottaviani, M. (2004). Cross border electricity trading and market design: The England–France interconnector. London Business School Case CS-04-008.
Joskow P. L., Tirole J. (2000) Transmission rights and market power on electric power networks. RAND Journal of Economics 31(3): 450–487
London Economics. (2007). Structure and performance of six European wholesale electricity markets in 2003, 2004 and 2005. Part 1. Presented to DG competition. In EC (2007). http://ec.europa.eu/comm/competition/sectors/energy/inquiry/electricity_final_part1.pdf.
Pindyck, R. S., & Rubinfeld, D. L. 1996. Microeconomics (3rd ed.) (p. 368). New Jersey: Prentice Hall.
Stoft S. (1999) Financial transmission rights meet cournot: How tccs curb market power. Energy Journal 20(1): 1–23
Turvey R. (2006) Interconnector economics. Energy Policy 34(13): 1457–1472
Zachmann, G. (2005). Convergence of electricity wholesale prices in Europe? A Kalman filter approach. DIW Berlin discussion paper 512.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Bunn, D., Zachmann, G. Inefficient arbitrage in inter-regional electricity transmission. J Regul Econ 37, 243–265 (2010). https://doi.org/10.1007/s11149-009-9104-5
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s11149-009-9104-5