This paper analyzes the efficiency of an explicit ex ante auction for network access to facilitating trade between two separate, but linked, electricity wholesale markets. It is generally assumed that greater regional interconnection will mitigate the exercise of local market power by dominant generators, but we show analytically that when a dominant player has access to a more competitive neighboring market, and is also the lowest cost producer, the exercise of market power becomes attractive and can have negative consumer welfare implications. For an empirical analysis, we use a unique data set of daily company-level flow nominations on the Anglo-French Interconnector (IFA). This provides a clear case study, “free of loop flows” (with the IFA being the only link between the UK and France). We are able to identify evident inefficiencies in the market behavior, for which several explanations, including market power, may contribute.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Bonardi J.-P. (2004) Global and political strategies in deregulated industries: The asymmetric behaviors of formers monopolies. Strategic Management Journal 25(2): 101–120

    Article  Google Scholar 

  • Borenstein S., Bushnell J., Stoft S. (2000) The competitive effects of transmission capacity in a deregulated electricity industry. RAND Journal of Economics 31(2): 294–325

    Article  Google Scholar 

  • CONSENTEC & Frontier Economics. (2004). Analysis of cross-border congestion management methods. Study commissioned by the European commission (DG energy and transport).

  • DTI. (2005). Statutory consultation on the licensing of existing gas and electricity interconnectors under the terms of the gas act 1986, the electricity act 1989 and the energy act 2004.

  • EC. (2003). Regulation (EC) No 1228/2003 of the European parliament and of the council of 26 June 2003 on conditions for access to the network for cross-border exchanges in electricity.

  • EC. (2007). Energy sector inquiry final report. European commission. DG competition. http://ec.europa.eu/comm/competition/sectors/energy/inquiry/index.html.

  • EFET. (2004). Assessment of congestion management at European borders. European federation of energy traders (EFET). Paper for the 11th florence forum, 16–17 September 2004.

  • Ehrenmann A., Smeers Y. (2005) Inefficiencies in European congestion management proposals. Utilities Policy 13(2): 135–152

    Article  Google Scholar 

  • ETSO. (2004). An overview of current cross-border congestion management methods in Europe. Brussels: European Transmission System Operators.

  • Gilbert R., Neuhoff K., Newbery D. (2004) Allocating transmission to mitigate market power in electricity networks. RAND Journal of Economics 35(4): 691–709

    Article  Google Scholar 

  • Glachant J. M., Pignon V. (2005) Nordic congestion’s arrangement as a model for Europe?. Physical constraints and Economic Incentives, Utilities Policy 13(2): 153–162

    Google Scholar 

  • Hoeffler, F., & Wittmann, T. (2006). Netting of capacity in interconnector auctions (March 2006). MPI collective goods preprint no. 2006/5 Available at SSRN: http://ssrn.com/abstract=888687.

  • Inderst, R., & Ottaviani, M. (2004). Cross border electricity trading and market design: The England–France interconnector. London Business School Case CS-04-008.

  • Joskow P. L., Tirole J. (2000) Transmission rights and market power on electric power networks. RAND Journal of Economics 31(3): 450–487

    Article  Google Scholar 

  • London Economics. (2007). Structure and performance of six European wholesale electricity markets in 2003, 2004 and 2005. Part 1. Presented to DG competition. In EC (2007). http://ec.europa.eu/comm/competition/sectors/energy/inquiry/electricity_final_part1.pdf.

  • Pindyck, R. S., & Rubinfeld, D. L. 1996. Microeconomics (3rd ed.) (p. 368). New Jersey: Prentice Hall.

  • Stoft S. (1999) Financial transmission rights meet cournot: How tccs curb market power. Energy Journal 20(1): 1–23

    Google Scholar 

  • Turvey R. (2006) Interconnector economics. Energy Policy 34(13): 1457–1472

    Article  Google Scholar 

  • Zachmann, G. (2005). Convergence of electricity wholesale prices in Europe? A Kalman filter approach. DIW Berlin discussion paper 512.

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Derek Bunn.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Bunn, D., Zachmann, G. Inefficient arbitrage in inter-regional electricity transmission. J Regul Econ 37, 243–265 (2010). https://doi.org/10.1007/s11149-009-9104-5

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s11149-009-9104-5

Keywords

JEL Classification

Navigation