Abstract
This article examines the system used for electrically powering ore-roasting furnaces at Georgian Manganese (in Zestafoni’ Georgia) and discusses its main shortcomings. It is shown that it would be possible to improve these furnaces’ power supply. The proposed improvements could be incorporated into a larger project aimed at rebuilding and upgrading the electric power supply system of the entire plant.
Similar content being viewed by others
Reference
A. A. Vasil’ev (ed.)’ The Electrical Part of Stations and Substations’ Energiya’ Moscow (1972)’ Part 2’ p. 62.
Author information
Authors and Affiliations
Additional information
__________
Translated from Metallurg’ No. 4’ p. 44’ April’ 2008.
Rights and permissions
About this article
Cite this article
Kldiashvili, V.I., Kashakashvili, G.B. & Meboniya, S.A. Efficient scheme for electrically powering ore-roasting furnaces. Metallurgist 52, 216–217 (2008). https://doi.org/10.1007/s11015-008-9035-x
Published:
Issue Date:
DOI: https://doi.org/10.1007/s11015-008-9035-x