1 Introduction

High-speed rail traffic operates significantly faster than traditional rail transport. Its development poses new challenges to the designer of structures along these lines. For instance, some bridges are excited to excessive vibrations when crossed by trains with high speed, and the ultimate bridge deck acceleration may be exceeded. As a consequence, the ballast becomes unstable, the rail quality is impaired, and the hazard of train derailment increases. Basically, it can be distinguished between two sources that may lead to excessive bridge vibrations. Excitation to bridge resonance at critical speeds is the result of repetitive axle loading of the crossed bridge, transferred through the train wheels to the structure. In this case, at a critical speed, where the frequency of the moving repetitive axle loads or a multiple of it is close to one natural bridge frequency [14], the dynamic bridge response exhibits a distinct resonance peak. The second substantial source of large bridge vibrations are track irregularities [27]. Track irregularities increase the dynamic response not only at certain critical speeds but in a large range of train speeds. Although track irregularities are limited by regulations [11], it should be considered that the track quality decreases with time, and if insufficiently maintained, track irregularities may become large.

From this short discussion it becomes apparent that bridge and high-speed train represent a highly dynamic interacting system, whose reliability should be investigated in more detail by the design engineer. Uncertainties of the train-bridge interaction problem, which considerably influence the structural response, are dispersing material parameters (in particular damping), track irregularities, and environmental effects [16, 23]. For instance, if ballast and subsoil start to freeze due to the prevailing temperature conditions, the global stiffness of the bridge, and consequently, its natural frequencies increase. A summary of the identified uncertainties of ballasted railway bridge-train interaction and their quantification and assumed distribution is provided in Salcher [20] and Salcher et al. [24]. As outlined in several studies, such as Gulvanessian et al. [13] and Ülker-Kaustell and Karoumi [26], the bridge acceleration response is often the limiting and decisive quantity when a dynamic assessment of this interacting system is necessary, whereas the ultimate load bearing capacity of the bridge is usually not exceeded. In a comprehensive reliability analysis, a stochastic simulation method is applied, based on a sufficiently sophisticated mechanical model of the bridge-train interaction problem, and considering structural, environmental and excitation uncertainties. The computational effort of crude Monte Carlo simulation (MCS), which is robust, reliable, and conceptually the most simple stochastic method to predict failure probabilities of highly non-linear problems, becomes rapidly prohibitively large when evaluating the nonlinear limit state function of the considered problem for the required small failure probabilities. Therefore, it is desirable to use more efficient stochastic methods to deal with high-dimensional reliability problems including many uncertainties, such as line sampling (LS) [15, 19], subset simulation (SS) [1], and asymptotic sampling (AS) [4], among others. In comparison to crude MCS, depending on the considered problem, those stochastic methods reduce the variance of the probability and simultaneously also the number of computationally expensive limit state function evaluations. There are, however, problems where these methods do not necessarily predict the actual probability of failure efficiently or even fail to predict the failure probability. It is, thus, the objective of the present contribution to evaluate suitability and efficiency of LS, SS, and AS for assessing the reliability of the bridge-train interaction problem.

In the simplest possible modeling approach, where dynamic interaction between bridge and train is explicitly considered, an uncertain beam represents the bridge structure, and the train is described by an uncertain planar mass-spring-damper (MSD) system. In this approach, which is employed in this study, coupling between the beam and the MSD system is achieved through the so-called corresponding assumption [29]. This modeling strategy captures all essential characteristics of uncertain dynamic bridge-train interaction with lowest possible numerical effort, and thus, the problems can be solved for the required number of samples. A brief summary of different bridge-train models of various sophistication is, for instance, provided in Cantero et al. [6].

In the present study, two bridge models subjected to the Austrian high-speed train type Railjet serve as example problems. The dynamic acceleration response of one bridge is governed by a distinctive resonance peak induced by the repetitive loads of the Railjet train. In the second example problem, where in the considered speed range no pronounced resonance peak is observed, the dynamic response amplification due to track irregularities becomes critical. These example problems represent two classes of the bridge-train interaction systems with fundamentally different dynamic response characteristics that lead to an exceedance of the ultimate bridge deck acceleration.

The paper is organized as follows. At first, a short description of the utilized bridge-train interaction model, and its uncertainties and random variables is provided. For the two example problems, reliability analyses are conducted utilizing crude MCS. The outcomes of these computationally expensive analyses serve as reference solution for the subsequent evaluation of LS, SS, and AS applied to predict the reliability of the example problems. The paper is concluded by a critical discussion about advantages and drawbacks of LS, SS, and AS when applied to dynamic train-bridge interaction systems.

2 Modeling approach

2.1 Mechanical bridge-train interaction model

Based on the substructure approach, the equations of motion are specified for both the bridge and the train subsystem model separately, and then coupled by imposing coupling conditions at the interface of the subsystems.

In this study, the bridge substructure is modeled as a simply supported continuous Euler–Bernoulli beam depicted in Fig. 1. Beam deflection w(xt) of the undamped Euler–Bernoulli beam bridge with uniform bending stiffness EI and mass per unit length \(\rho A\) subjected to a series of \(N_w\) concentrated forces \(F_b^{(i)}(t)\), \(i=1,\ldots ,N_w\), moving with constant speed v is governed by the following partial differential equation of motion [8, 28],

$$\begin{aligned} \rho A \ddot{w}(x,t)+EI w_{,xxxx}(x,t)=\sum _{i=1}^{N_w} F_b^{(i)}(t) \delta (x-\xi _i)[H(t-t_i^{(0)})-H(t-t_i^{(E)})] \end{aligned}$$
(1)
Fig. 1
figure 1

Euler–Bernoulli beam bridge model, modified from Salcher [20]


Position \(\xi _i=vt-s_i\) of the ith interaction force \(F_b^{(i)}(t)\) between track and the ith wheel pair of the train at time t is indicated by delta function \(\delta (x-\xi _i)\), see Fig. 1. Heaviside functions H control the arrival and departure, respectively, of \(F_b^{(i)}(t)\) on the beam model at time instants \(t_i^{(0)} = s_i/v\) and \(t_i^{(E)}=(s_i+L)/v\), respectively. Modal expansion of w(xt) by considering only the first \(N_{\varPhi }\) eigenfunctions \(\varPhi _n(x)\), \(w(x,t)\approx \sum _{n=1}^{N_{\varPhi }}\varPhi _n(x)q_n(t)\), decouples the partial differential equation of motion into \(N_{\varPhi }\) ordinary single degree-of-freedom oscillator equations in terms of modal coordinates \(q_n(t)\) [30],

$$\begin{aligned} {\ddot{q}}_n + 2 \zeta _n \omega _n {\dot{q}}_n + {\omega _n}^2 {q}_n = {p}_n,\,\,n=1,\ldots ,N_{\varPhi } \end{aligned}$$
(2)

with

$$\begin{aligned} \begin{aligned}&{p}_n= \frac{1}{m_n} \sum _{i=1}^{N_w}F_b^{(i)}(t) \varPhi _n(x-\xi _i) [H(t-t_i^{(0)})-H(t-t_i^{(E)})],\\&{\omega _n} = {\left( \frac{n\pi }{L} \right) ^2}\sqrt{\frac{EI}{\rho A}} , \,\,\,\,{\varPhi _n} = \sin \frac{n\pi x}{L}, \,\,\, {m_n} = \frac{\rho AL}{2} \end{aligned} \end{aligned}$$
(3)

In Eq. 2 bridge damping \(\zeta _n\) has been added modally. The \(N_{\varPhi }\) modal equations of motion written in matrix form,

$$\begin{aligned} {\mathbf {M}}_b {\ddot{\mathbf {q}}}_b + {\mathbf {C}}_b {\dot{\mathbf {q}}}_b + {\mathbf {K}}_b {\mathbf {q}}_b={\mathbf {p}}_b \end{aligned}$$
(4)

represent the mechanical model of the bridge subsystem. Herein, \({\mathbf {M}}_b\), \({\mathbf {C}}_b\), \({\mathbf {K}}_b\), \({\mathbf {p}}_b\) denote the modal mass, damping and stiffness matrix, and modal interaction force vector, respectively,

$$\begin{aligned} \begin{aligned}&{\mathbf {M}}_b= \text {diag}[m_1,\ldots ,m_{N_{\varPhi }}],\,\,{\mathbf {C}}_b= \text {diag}[2\zeta _1m_1\omega _1,\ldots ,2\zeta _{N_{\varPhi }} m_{N_{\varPhi }} \omega _{N_{\varPhi }}], \\&{\mathbf {K}}_b= \text {diag}[m_1\omega _1^2,\ldots ,m_{N_{\varPhi }}\omega _{N_{\varPhi }}^2], \,\,{\mathbf {p}}_b= \{m_1 p_1,\ldots , m_{N_{\varPhi }} p_{N_{\varPhi }}\}^T\\ \end{aligned} \end{aligned}$$
(5)

In the present study, the dynamic response of the considered bridge structures is approximated by seven modes (i.e. \(N_{\varPhi }=7\)), verified in convergence studies.

Fig. 2
figure 2

Planar MSD model for the jth vehicle of the high-speed train Railjet, modified from Salcher and Adam [21]

The \(N_c\) vehicles of the train subsystem are modeled as planar MSD systems consisting of rigid bodies with mass, which represent passenger stage, two bogies and and four wheel pairs, connected by spring-dashpot elements. As such, the interaction between the bridge and the vehicle can be considered, and consequently, also the effect of track irregularities. Figure 2 shows the MSD system, representing both the power car and the passenger cars of the Austrian high-speed train type Railjet used in this study as reference high-speed train. In total, this vehicle model exhibits ten degrees-of-freedom (DOFs), i.e. seven translational DOFs, \(u_p^{(j)}, u_{b}^{(2j-1)}, u_{b}^{(2j)}, u_{w}^{(4j-3)}, u_{w}^{(4j-2)}, u_{w}^{(4j-1)}, u_{w}^{(4j)}\), and three rotational DOFs, \(\varphi _p^{(j)}, \varphi _{b}^{(2j-1)}, \varphi _{b}^{(2j)}\), here written for the jth vehicle (\(j=1,\ldots ,N_c\)), see Fig. 2.

The equations of motion of the jth vehicle are, for instance, derived by Lagrangian equations [30]. In a common assumption that horizontal interaction between the vehicles can be neglected, the equations of motion of the train subsystem are expressed as [20]

$$\begin{aligned} {\mathbf {M}}_c {\ddot{\mathbf {u}}}_c + {\mathbf {C}}_c \dot{\mathbf {u}}_c + {\mathbf {K}}_c \mathbf {u}_c=\mathbf {f}_c \end{aligned}$$
(6)

where mass matrix \({\mathbf {M}}_c\), damping matrix \({\mathbf {C}}_c\), and stiffness matrix \({\mathbf {K}}_c\) are composed of the corresponding vehicle submatrices

$$\begin{aligned} \begin{aligned}&{\mathbf {M}}_c= \text {diag}[{\mathbf {M}}_{c}^{(1)},\ldots ,{\mathbf {M}}_{c}^{(j)},\ldots ,{\mathbf {M}}_{c}^{(N_c)}], \,\,\\&{\mathbf {C}}_c= \text {diag}[{\mathbf {C}}_{c}^{(1)},\ldots ,{\mathbf {C}}_{c}^{(j)},\ldots ,{\mathbf {C}}_{c}^{(N_c)}], \,\,\\&{\mathbf {K}}_c= \text {diag}[{\mathbf {K}}_{c}^{(1)},\ldots ,{\mathbf {K}}_{c}^{(j)},\ldots ,{\mathbf {K}}_{c}^{(N_c)}] \end{aligned} \end{aligned}$$
(7)

Vehicle matrices \({\mathbf {M}}_{c}^{(j)}\), \({\mathbf {C}}_{c}^{(j)}\), and \({\mathbf {K}}_{c}^{(j)}\) are found in Salcher [20]. Displacement vector \(\mathbf u _{c}^{(j)} = [\mathbf {u}_{pb}^{(j)},\mathbf {u}_{w}^{(j)}]^{\mathrm {T}}\) concatenates all DOFs of the jth vehicle and is composed of subvector \(\mathbf {u}_{pb}^{(j)}\) representing the six DOFs of the passenger stage and bogies, and vector \(\mathbf {u}_{w}^{(j)}\) representing the four DOFs of the four wheels in contact with the bridge. Vector \(\mathbf {f}_c\) contains the static axle forces and the dynamic interaction forces between the wheel pairs and the beam [20],

$$\begin{aligned} \mathbf {u}_c=\{\mathbf {u}_{c}^{(1)},\ldots ,\mathbf {u}_{c}^{(j)},\ldots ,\mathbf {u}_{c}^{(N_c)}\}^T,\,\, \mathbf {f}_c=\{\mathbf {f}_{c}^{(1)},\ldots ,\mathbf {f}_{c}^{(j)},\ldots ,\mathbf {f}_{c}^{(N_c)}\}^T \end{aligned}$$
(8)

The Railjet train model used in this study is composed of one power car and seven passenger cars, i.e. in total \(N_c=8\) vehicles and \(N_w=32\) wheel pairs.

The equations of motion of the beam and MSD subsystems, Eqs. (4) and (6), respectively, are coupled according to the so-called corresponding assumption [21]. This assumption implies that the elasticity of wheel and track at the contact point is neglected and a continuous contact of the bodies is supposed. Consequently, the vertical displacement of the ith wheel pair, \(u_{w}^{(i)}(t)\), and of the track deflection at contact point \(\xi _i(t)\) are equal ([20] and [29]),

$$\begin{aligned} u_{w}^{(i)}(t)=w(\xi _i(t),t)+I_{r}(\xi _i(t)) \approx \sum _{n=1}^{N_{\varPhi }}\varPhi _n(\xi _i(t))q_n(t)+I_{r}(\xi _i(t)),\,\,i=1,\ldots ,N_w \end{aligned}$$
(9)

The vertical track displacement is composed of bridge deflection \(w(\xi _i(t),t)\) and track irregularity described by irregularity function \(I_{r}(\xi _i(t))\). From the corresponding assumption it also follows that the contact force between each wheel pair and track is equal, \(F_w^{(i)}(t)=F_b^{(i)}(t)\), \(i=1,\ldots ,N_w\). The general form of the equations of motion is given as,

$$\begin{aligned} \bar{{\mathbf {M}}}\ddot{\bar{\mathbf {u}}} + \bar{{\mathbf {C}}}\dot{\bar{\mathbf {u}}} + \bar{{\mathbf {K}}}\bar{\mathbf {u}}=\bar{\mathbf {f}} \end{aligned}$$
(10)

with \(\bar{\mathbf {u}} = [{\mathbf {q}},\mathbf {u}_{pb}^{(1)},\mathbf {u}_{pb}^{(2)},\ldots ,\mathbf {u}_{pb}^{(N_c)}]^{\mathrm {T}}\) comprising the modal coordinates of the beam and internal DOFs \(\mathbf {u}_{pb}^{(j)}\) of each vehicle, \(1 \le j \le N_c\). Due to coupling condition Eq. 9 matrices \(\bar{{\mathbf {M}}}\), \(\bar{{\mathbf {C}}}\), and \(\bar{{\mathbf {K}}}\) are time dependent. Vector \(\bar{\mathbf {f}}\) includes the modal representation of the static axle loads, and first and second order time derivatives of irregularity profile functions \(I_{r}(\xi _i(t))\) evaluated at position \(\xi _i(t)\). In Biondi et al. [3], Salcher and Adam [21] the applied CMS method, the involved system matrices and vectors are described in full detail.

2.2 Uncertainties and random variables

The uncertainties of a bridge-train interaction system can be categorized into three groups. The first group is related to the bridge, the second group to the excitation induced by the passing train, and the third group to the environmental impact [22]. In this study, geometry and material parameters of the train are assumed to be deterministic.

According to Salcher [20] and Salcher et al. [24] the most important uncertain bridge parameters are damping, dispersing structural parameters, and the properties of the ballast. In the current model, all dissipation mechanisms of the bridge including structure, subsoil and track are captured globally by modal damping coefficients \(\zeta _n\) (\(n=1,\ldots ,N_{\varPhi })\), see Eq. 2, assumed to be the same for all modes, \(\zeta \equiv \zeta _1=\cdots \zeta _n =\cdots \zeta _{N_{\varPhi }}\). To describe the dispersion of damping, coefficient \(\zeta\) is modeled as truncated log-normally distributed random variable. Its parameters listed in Table 1 (i.e. mean \(\zeta =1\%\) and coefficient of variation \(CV=0.3\%\) [24]) refer to a ballasted steel bridge [24]. The truncation at \(\zeta =0.5\%\) excludes unlikely low damping values [24]. The Metropolis algorithm [18] is used to generate the truncated log-normally distributed samples of \(\zeta\). To consider the effect of naturally dispersing structural properties, moment of inertia I of the bridge girder is treated as Gaussian distributed random variable. Mean and CV are listed in Table 1. Due to water saturation and sediment pollution, the ballast is a bridge element with strongly dispersing properties. To capture this behavior, in the model ballast density \(\rho _b\) is assumed to be a random variable with uniform distribution, see also Table 1.

At high train speeds, track irregularities represent a substantial source of excitation. In the present bridge model track irregularities are considered via random irregular track profile functions \(I_r(x)\), superposed to the beam deflection, compare with Eq. (9). Random profiles \(I_r(x)\) are assumed to comply with a stationary Gaussian stochastic process [25], realized as a stochastic superposition of J harmonic functions with discrete frequencies \(\varOmega _m\), \(m=1,\ldots ,J\), and uniformly distributed random phase angle \(\varphi _m\) in the range 0 to \(2\pi\) [7],

$$\begin{aligned} I_{r}(x)=\sqrt{2}\sum _{m=1}^{J}A_{m}\cos (\varOmega _mx+\varphi _{m}), \,\,A_m=\sqrt{\left( \frac{S(\varOmega _m)}{\pi }+\frac{S(0)a}{6\pi }\right) \varDelta \varOmega } \end{aligned}$$
(11)

In the frequency increment \(\varDelta \varOmega =({\varOmega _u-\varOmega _l})/{J}\), \(\varOmega _u\) denotes the upper boundary frequency and \(\varOmega _l\) the lower boundary frequency. Note that \(a=4\) for \(m=1\), \(a=1\) for \(m=2\), and \(a=0\) for \(m=3,\ldots ,J\). Variable \(S(\varOmega _m)\) represents the power spectral density, expressed as one-sided density function \(\varPhi _v(\varOmega _m)\) [7],

$$\begin{aligned} S(\varOmega _m)=\frac{\varPhi _v(\varOmega _m)}{2}, \,\,\varPhi _v(\varOmega _m)=Q\frac{\varOmega ^2_c}{(\varOmega ^2_r+\varOmega ^2_m)(\varOmega ^2_c+\varOmega ^2_m)} \end{aligned}$$
(12)

with \(\varOmega _c=0.8246\) rad/m and \(\varOmega _r=0.0206\) rad/m [7]. The uppermost frequency used to generate irregular profiles is \(\varOmega _u=2.1\) rad/m, and the lowermost frequency \(\varOmega _l=0.07\) rad/m. Amplitude Q, which defines the track quality, is considered as continuous uniformly distributed random variable between the boundaries \(0.592\cdot 10^{-6}\) radm and \(1.586\cdot 10^{-6}\) radm. The lower boundary represents a high quality rail and the upper boundary a low quality rail [7], see also Table 1. In this study, track irregularities are generated by superposition of \(J=1000\) harmonic functions.

Changing environmental conditions affect the dynamic behavior of the bridge and in further consequence its response. Measurements on ballasted railway bridges have shown that their natural frequencies change almost stepwise close to the freezing point of the surrounding environmental temperature [12]. This behavior can be attributed to the change of water inside the ballast and subsoil to ice at freezing temperature, leading to an increase of the global bridge stiffness. Considering that the natural bridge frequencies are directly affected by the frost depth, in Salcher et al. [24] a stochastic model capturing the temperature dependence of the natural frequencies was proposed, which is used for the current study. In this model, the daily mean air temperature T is considered as a random variable following an extreme value distribution with its realizations \(T_j\). The unfrozen state of the ballast assumed to be attained at a daily minimum temperature at ground \(T_g> -1^\circ \text {C}\) and the fully frozen state at \(T_g<-10^\circ \text {C}\) are defined by random variables \(T_0\) and \(T_1\), respectively, expressed in terms of the conditional probability distributions \(H_0(T=T_j|T_g>-1^\circ \text {C})\), \(H_1(T=T_j|T_g<-10^\circ \text {C})\) as a function of the daily mean temperature T. If the daily mean temperature \(T_j\) is in-between the temperature for the unfrozen and the fully frozen state, Young’s modulus of the ballast is determined by linear interpolation of the Young’s modulus of the unfrozen and the fully frozen ballast [24]. The parameters of the random variables of this model listed in Table 1 are based on the temperature data of Munich Airport [24].

The number of random variables, \(N_r\), without track irregularities is \(N_r=7\). When considering track irregularities, additional 1001 random variables are considered, through the superposition of \(J=1000\) harmonic functions with discrete frequencies \(\varOmega _m\) and uniformly distributed random phase angle \(\varphi _m\). Together with random irregularity amplitude Q, \(N_r=1008\) in total.

Table 1 Random variables

2.3 Definition of failure, limit state function, and probability of failure

Failure of a structure indicates an undesirable state of the structure, i.e. the structural response exceeds certain limits that can be expressed in terms of a limit state function (performance function) \(g({\mathbf {X}})\), where \({\mathbf {X}}=(X_1,X_2,\ldots ,X_{N_r})\) is the vector comprising the \(N_r\) random input variables. In general, the load bearing capacity of railway bridge structures is satisfied, however, the admissible vertical bridge deck acceleration may be exceeded when crossed by a high-speed train with critical speed. Large bridge deck accelerations may lead to ballast instability, and thus, it is commonly the limiting factor in the dynamic design of railway bridges [6]. In the present study, bridge deck acceleration \(\ddot{w}\) at a given speed v governs the limit state in the stochastic reliability approach of the bridge-train interaction system. The corresponding safety distance reads as

$$\begin{aligned} Z(v)=\bar{\gamma }_{bt}-\max \left| {\ddot{w}(x,t)} \right| (v) \end{aligned}$$
(13)

where \(\bar{\gamma }_{bt}\) is the acceleration threshold for a full stochastic reliability assessment of a ballasted railway bridge. In the present study, \(\bar{\gamma }_{bt} = 7\) m/s\(^2\) is a deterministic quantity that is two times the acceleration limit value of 3.5 m/s\(^2\) associated with ballast instability, recommended in design guideline Eurocode 1 [10] for a semi-probabilistic bridge assessment. In this way, the safety factor of two is eliminated [24]. Failure is predicted if the limit state function \(g(Z) \le 0\), with safety distance Z according to Eq. (13).

Probability of failure \(p_f\) is defined as probability P that an undesired state is reached: \(p_f=P(\{{\mathbf {X}}:g({\mathbf {X}})\le 0\})\) [5]. Since instability of the ballast is a serviceability problem, according to Eurocode 0 [9] the maximum probability of failure of this class 2 bridge-train interacting system is \(p_f=10^{-3}\) for the serviceability limit state (SLS). Crude Monte Carlo simulation (MCS) is conceptually the most simple and a robust numerical method to evaluate \(p_f\). When applying MCS, \(N_{MC}\) independent and identically distributed samples \({\mathbf {x}}^{(r)}\) (\(r=1,\ldots ,N_{MC}\)) with distribution as defined before are generated. For each sample, the limit state function is computed (commonly numerically, for instance, by response history analysis). When the response of the sample is inside the failure domain \(\varOmega _f({\mathbf {x}})=\{{\mathbf {x}}:g({\mathbf {x}})\le 0\}\), indicator function \(I_f({\mathbf {x}})\) is one, and zero otherwise. The approximation \(p_f\approx \hat{p}_f^{MC}=\frac{1}{N_{MC}}\sum _{r=1}^{N_{MC}}I_f({\mathbf {x}}^{(r)})\) represents an unbiased estimate of \(p_f\) [5]. If \(N_{MC}\) is sufficiently large, the predicted probability of failure \(\hat{p}_f^{MC}\) is reliable, and the efficiency of this method does not depend on the dimension \(N_r\) of the problem. However, for complex structural systems, such as elaborate three-dimensional mechanical models of bridge-train interaction including the subsoil, the computational costs of MCS are prohibitively large. Thus, subsequently, three alternative stochastic methods, i.e. LS, SS, and AS, are tested on two example problems. A short summary of these alternative stochastic methods as applied in this study can be found in the “Appendix”.

In the present study, the outcomes of a crude MCS with \(N_{MC}=10{,}000\) samples for discrete train speeds in the range from 20 to 100 m/s (speed increment 1 m/s) serve as reference solutions. With this sample size, the required failure probability \(p_f=10^{-3}\) can be reliably predicted [24].

3 Example problems

For the assessment of the considered stochastic methods two different bridge structures are considered. The bridges located close to Munich airport are assumed to be crossed by the Austrian high-speed train type Railjet with the common configuration of one power car and seven passenger cars. The deterministic parameters of the corresponding planar MSD vehicle model according to Fig. 2 are found in Salcher [20].

Fig. 3
figure 3

Bridge peak acceleration spectra of deterministic bridge model 1 with perfect track and irregular track, respectively

Example bridge 1 is a simply supported ballasted steel bridge of span \(L=16.8\) m with mean bending stiffness \(EI=3.262\cdot 10^{10}\) Nm\(^2\) and mean mass per unit length \(\rho A = 1.220\cdot 10^{4}\) kg/m. Natural frequencies of this model with assigned mean parameters are \(f_1 = 9.10\) Hz, \(f_2 = 36.4\) Hz, \(f_3 = 81.9\) Hz, \(f_4 = 145\) Hz, \(f_5 = 227\) Hz, \(f_6 = 327\) Hz, and \(f_7 = 445\) Hz. Figure 3 shows the peak acceleration, \(\max \left| {\ddot{w}(x,t)} \right|\), of the mean parameter bridge with perfect (smooth) tracks (red line) and with one arbitrarily chosen sample of irregular rail profiles (black line), respectively, as a function of train speed v in the range \(20 \le v \le 100\) m/s. As observed, the spectra exhibit a distinct local maximum close to critical speed \(v_{2}^{(1)}=75.1\) m/s, i.e. the acceleration response is dominated by one significant resonance peak where \(\max \left| {\ddot{w}(x,t)} \right| \ge \bar{\gamma }_{bt}\). Note that at a critical train speed, defined as \(v_l^{(n)}={df_n}/{l}, \,\,l=1,2,3,\ldots\) [14], the nth natural bridge frequency \(f_n=\omega _n/(2\pi )\) is excited to a state of resonance due to the repetitive axle loads with constant distance d. For the Railjet train this distance corresponds to wagon length \(d=16.5\) m. It is also seen that irregular rails amplify considerably the peak acceleration, and close to the resonance peak the acceleration threshold \(\bar{\gamma }_{bt}=7\) m/s\(^2\) is exceeded. This model is, thus, representative for bridges whose peak acceleration amplification is governed by resonance due to repetitive axle loads.

For the MCS reference solution, 10, 000 random bridge samples are generated. Figure 4a shows \(\max \left| {\ddot{w}(x,t)} \right|\) of those samples disregarding track irregularities plotted against speed v. Additionally, mean, 10% and 90% quantiles, minimum and maximum of these spectra are depicted. In the range around critical speed \(v_{2}^{(1)}\), acceleration threshold \(\bar{\gamma }_{bt}=7\) m/s\(^2\) is frequently exceeded. The corresponding spectra of the bridge considering track irregularities modeled according to Eq. 11 are depicted in Fig. 4b. Comparing Fig. 4b with Fig. 4a confirms that track irregularities increase the peak bridge acceleration, in this example particularly at speeds larger than 60 m/s.

Fig. 4
figure 4

Bridge peak acceleration spectra of 10,000 samples and statistically evaluated spectra. Example bridge 1 with a perfect track; b irregular track

The second bridge is a simply supported steel bridge of length \(L=21.36\) m, mean bending stiffness \(EI = 2.562\cdot 10^{10}\) Nm\(^2\) and mass per unit length \(\rho A = 0.813\cdot 10^{4}\) kg/m. The first seven frequencies of this model with assigned mean parameters are \(f_1 = 6.11\) Hz, \(f_2 = 24.4\) Hz, \(f_3 = 55.0\) Hz, \(f_4 = 98\) Hz, \(f_5 = 153\) Hz, \(f_6 = 220\) Hz, and \(f_7 = 300\) Hz. Figure 5 shows the peak acceleration spectrum of a bridge model with perfect tracks (red line) and of a model with an arbitrary irregular track profile (black line). In contrast to bridge 1, the structural acceleration response of this object is not dominated by one significant resonance peak. The global acceleration maximum is reached close to resonance speed \(v_{10}^{(3)}=90.8\) m/s. Additionally, several less pronounced resonance peaks with local acceleration maxima close to critical train speeds \(v_{5}^{(2)}=80.7\) m/s, \(v_{7}^{(2)}=57.6\) m/s, \(v_{10}^{(2)}=40.3\) m/s, and \(v_{13}^{(2)}=31.0\) m/s are observed. The maximum peak acceleration is much less than acceleration threshold \(\bar{\gamma }_{bt}=7\) m/s\(^2\). However, the results indicate that rail irregularities increase the bridge response significantly, and hence, a reliability assessment is conducted considering the random variables introduced previously.

Fig. 5
figure 5

Bridge peak acceleration spectra of one sample of bridge model 2 with perfect track and irregular track, respectively

Fig. 6
figure 6

Bridge peak acceleration spectra of 10,000 samples and statistically evaluated spectra. Example bridge 2 with a perfect track; b irregular track

In Fig. 6a the beam peak acceleration of \(N_{MC}=10,000\) random bridge samples for train speeds in the range from 20 to 100 m/s is depicted. These results show that at bridge 2 with perfectly smooth rails acceleration threshold \(\bar{\gamma }_{bt}=7\) m/s\(^2\) is exceeded so infrequent that the probability of failure is less than \(10^{-3}\). Spectra of bridge model 2 considering track irregularities are depicted in Fig. 6b. Especially at train speeds larger than 50 m/s track irregularities increase the peak accelerations compared to the samples with perfectly smooth rails. The exceedance of \(\bar{\gamma }_{bt}\) is primarily caused by track irregularities, i.e. the peak bridge accelerations of bridge structure 2 is significantly dominated by track irregularities.

4 Assessment of stochastic methods for dynamic bridge-train interacting systems

4.1 Prediction of the probability of failure

Example bridge 1


Figure 7a shows probability of failure \(p_f\) of the bridge with perfect (smooth) rails in logarithmic scale, plotted against train speed v in the critical range from 60 m/s up to 90 m/s. Circular markers refer to the reference solution derived by crude MCS with 10, 000 samples. As observed, at speed \(v=71\) m/s, \(p_f\) estimated by crude MCS is \(10^{-4}\). At lower speeds, \(p_f\) is less than \(10^{-6}\), and thus, cannot be predicted with the used sample size. With increasing v also \(p_f\) increases, and for a probability of failure \(p_f=10^{-3}\) the acceleration threshold \(\bar{\gamma }_{bt}=7\) m/s\(^2\) is the first time exceeded at \(v=72.0\) m/s. Note that \(p_f=10^{-3}\) corresponds to ten failed samples out of 10, 000. The maximum observed probability of failure of \(p_f=0.192\) is attained at speed \(v=78.0\) m/s, which is close to critical speed \(v_{2}^{(1)}=75.1\) m/s. Subsequently, with further increasing speed, \(p_f\) becomes continually smaller. At \(v=84\) m/s, \(p_f\) is again \(< 10^{-3}\).

Additionally, in this figure also the outcomes of LS based on \(N_{LS}=100\) lines (star-shaped markers), SS (plus-shaped markers), and AS (square-shaped markers) are depicted. Line Sampling as utilized in this example is based on simplified limit state evaluation of the root by quadratic interpolation, as explained Appendix “Line sampling”. For SS of this particular study, an initial sample size of \(N_{SS}=100\) and intermediate failure probabilities of \(p_{interm}=0.1\) have been selected. The limit state function is evaluated for the \(N_{SS}\) initial Monte Carlo samples. The number of samples that lie closest to the failure domain of these \(N_{SS}\) initial samples is \(N_{SSw}=N_{SS}p_{interm}\). In this example, at each of the following \((k-1)\) substeps, the worst 10% of the samples serve as seeds for Markov chains of length \(C_l=10\) used to determine the intermediate probabilities of failure according to the conditional probability density functions \(q({\mathbf {x}}|F_m)\), see Eq. (18). Asymptotic sampling as applied in this contribution with \(N_{AS}=100\) initial samples, starts at (\(1/\sigma =1\)), evaluating the limit state function \(N_{AS}=100\) times. Subsequently \(1/\sigma\) is successively reduced by 0.1 until failure of the structure is reached, leading to one pair of \((1/\sigma ,\beta )\). Five pairs of \((1/\sigma ,\beta )\) are used to determine \(\beta (1)\) by a least squares fit.

It is seen that LS, SS, and AS with the selected resolution predict the general trend of \(p_f\) with respect to speed v, however, at some specific speeds discrepancy and scatter compared to the crude MCS solution is quite large. As discussed in Appendix “Line sampling”, importance direction \(\mathbf {e}_\alpha\) of LS points towards the gradient of g(Z) at the origin in standard normal space. According to the outcomes of LS with \(N_{LS}=100\) lines, the desired \(p_f\) of \(10^{-3}\) is exceeded at a speed of \(v=74\) m/s. Subset simulation and AS predict for \(p_f = 10^{-3}\) a maximum admissible speed of \(v=73\) m/s and \(v=72\) m/s, respectively.

Figure 7b shows \(p_f\) with respect to v for the bridge with track irregularities, derived by the same stochastic methods with same parameters as before. The \(p_f\)-predictions are based on simplified LS, simplified SS, and simplified AS. In particular, track irregularities are neglected in the algorithms of the stochastic procedures and only considered when evaluating the limit state function. That is, the importance direction of simplified LS is determined without considering track irregularities. Concerning simplified SS, the Markov chains are evaluated leaving the random phase angles of the irregularity profiles out of consideration. The number of random variables for simplified AS is the same as for the bridge with perfect rails, i.e. \(N_r=7\).

Fig. 7
figure 7

Probability of failure \(p_f\) based on crude Monte Carlo simulation, line sampling (100 lines), subset simulation (100 initial samples), and asymptotic sampling (100 initial samples). Example bridge 1 with a perfect track; b irregular track

For instance, at \(v=72\) m/s, for the structure with irregular tracks \(p_f\) estimated by crude MCS is \(1.4\cdot 10^{-3}\), while for the perfectly smooth bridge \(p_f=1.1\cdot 10^{-3}\). However, the maximum probability of failure is similar for both structural models, i.e. \(p_f = 0.209\) at \(v=78\) m/s (irregular rails), and \(p_f =0.192\) at \(v=78\) m/s (perfect rails). Interestingly enough, also in the bridge with irregular profiles the target probability of failure of \(10^{-3}\) is exceeded at the same speed as in the object with perfect tracks, i.e. \(v=72\) m/s. Also here, the difference of \(p_f\)-predictions from LS, SS, and AS compared to the reference MCS outcomes are significant. In particular, at several discrete speeds SS does not predict failure with \(p_f > 10^{-6}\) with the employed number of initial samples.

In a subsequent study, LS with \(N_{LS} = 300\) initial lines, SS with \(N_{SS} = 300\) initial samples (\(p_{interm} = 0.1\)) and AS with \(N_{AS} = 300\) initial samples is conducted, in an effort to determine \(p_f\) more reliably. Figure 8a for perfect tracks and Fig. 8b for irregular track profiles show that an increased number of lines respectively increased initial sample size significantly improves the accuracy of these methods. In the entire considered speed range, the difference between reference \(p_f\) from crude MCS, and the outcomes of LS, SS and AS is small. It can be, thus, concluded that in this example problem simplified LS, simplified SS and simplified AS predict accurately the probability of the failure if the number of lines and initial samples, respectively, is sufficiently large. This outcome also confirms the chosen strategy, where the importance direction of simplified LS and the Markov chains of simplified SS have been determined without considering the random variables of the track irregularities. In the simplified AS approach, the random variables of the irregular profiles have been also neglected when initially generating the random samples. Such simplified LS, SS and AS procedures perform well, because in the considered bridge-train interaction problem failure is governed by resonance close to critical speed \(v_{2}^{(1)}=75.1\) m/s.

Fig. 8
figure 8

Probability of failure \(p_f\) based on crude Monte Carlo simulation, line sampling (300 lines), subset simulation (300 initial samples), and asymptotic sampling (300 initial samples). Example bridge 1 with a perfect track; b irregular track

Fig. 9
figure 9

Performance along \(N_{LS}=100\) lines \(v=80\) m/s. Example bridge 1 with a perfect track; b irregular track

Line sampling allows also to determine failure domain \(\varOmega _f=\{Z: g(Z)\le 0\}\) [17] of the bridge-train interaction system. To this end, limit state function g(Z) is evaluated at certain distances \(\beta\) along the random lines in standard normal space (see Appendix “Line sampling”). As outcome, Fig. 9 shows for train speed \(v=80\) m/s the limit state function of the bridge-train interaction system (a) without track irregularities and (b) considering track irregularities along \(N_{LS}=100\) lines plotted in standard normal space against LS parameter \(\beta\), with \(-\,5 \le \beta \le 5\). Direction \(\alpha\) of the walk along the lines corresponds to importance direction \(\mathbf {e}_\alpha\) of LS with \(N_{LS}=100\) lines. If \(g(Z)\le 0\), the failure state of the bridge-train interaction system is reached, i.e. the actual peak bridge acceleration, \(\max |\ddot{w}(x,t)|\), exceeds the threshold of the permissible deck acceleration \(\bar{\gamma }_{bt}=7\) m/s\(^2\), i.e. \(\bar{\gamma }_{bt}-\max |\ddot{w}(x,t)|\le 0\). A positive limit state function implies that the bridge-train interaction system is safe. As can be seen, the limit state function is negative only in a certain range of \(\beta\), i.e. in the range around critical speed \(v_{2}^{(1)}\). At lower and higher speeds the acceleration threshold of 7.0 m/s\(^2\) is not exceeded, see also Figs. 4a, b. This result shows that the failure domain of the considered bridge-train problem is bounded. It is also observed that the scatter of g with respect to \(\beta\) is much larger for the bridge samples with irregular rail profiles than for objects with smooth track surface, compare with Fig. 9b. Reason behind this response behavior is that in the importance direction of \(\mathbf {e}_\alpha\) for LS track irregularities are not taken into account but only the limit state function is assumed to be random.

Crude MCS with increased standard deviation does not necessarily generate more samples in a bounded failure domain as in the considered problem. Consequently, AS with \(N_{AS}=100\) initial samples, which has been developed for unbounded failure domains, does not accurately predict \(p_f\) of the bridge. In theory, LS is also based on the assumption of an unbounded failure domain, however, in the present study LS has been proven to be more robust than AS when using \(N_{LS}=300\) lines.

Example bridge 2

Subsequently, the assessment of probability of failure \(p_f\) of example bridge 2 by the considered stochastic methods is discussed. Figure 10 depicts \(p_f\) in the critical range from 60 m/s up to 90 m/s resulting from crude MCS (circular markers), LS with 100 lines (star-shaped markers), SS with 100 initial samples (cross-shaped markers), and AS with 100 initial samples (square-shaped markers) for bridge 2 with perfect (left subplot) and irregular tracks (right subplot).

In the perfect bridge, according to the outcomes of a crude MCS with sample size \(N_{MC}=10,000\), solely at speed \(v=83\) m/s the object fails with the failure probability \(p_f=2\cdot 10^{-4}\), compare also with Fig. 6a. Since crude MCS with \(N_{MC}=10,000\) samples estimates only failure probabilities up to \(10^{-3}\) with a coefficient of variation of 0.3 reliably, another computation of \(p_f\) at speed \(v=83\) m/s with the appropriate number of \(N_{MC}=100{,}000\) samples has been conducted. The latter MCS yields a failure probability of \(p_f=1.5\cdot 10^{-4}\), which is close to the outcome of the first MCS (i.e. \(p_f=2\cdot 10^{-4}\)) with \(N_{MC}=10,000\) samples. At discrete speeds other than 83 m/s no failure is predicted larger than \(10^{-6}\). Line sampling, SS, and AS with an equivalent setup as in bridge example 1 and the resolution specified above fail to predict the failure probabilities resulting from crude MCS with \(N_{MC}=10,000\) samples both for the bridge samples with perfect and irregular rail profiles.

Fig. 10
figure 10

Probability of failure \(p_f\) based on crude Monte Carlo simulation, line sampling (100 lines), subset simulation (100 initial samples), and asymptotic sampling (100 initial samples). Example bridge 2 with a perfect track; b irregular track

Fig. 11
figure 11

Probability of failure \(p_f\) based on crude Monte Carlo simulation, line sampling (300 lines), subset simulation (300 initial samples), and asymptotic sampling (300 initial samples). Example bridge 2 with a perfect track; b irregular track

In a further effort to predict \(p_f\) more precisely, the resolution of LS and SS is increased, as in the bridge example 1. That is, LS with \(N_{LS} = 300\) initial lines, and SS with \(N_{SS}=300\) initial samples and \(p_{interm} = 0.1\) is conducted. For perfect tracks, according to the results shown in Fig. 11a, at speed \(v=83\) m/s LS and SS with enhanced resolution deliver a probability of failure very close to the MCS reference solution. In particular, LS with \(N_{LS} = 300\) lines results in \(p_f = 1.47\cdot 10^{-4}\), and SS with \(N_{SS}=300\) initial lines yields \(p_f = 2.6\cdot 10^{-4}\), compared to \(p_f = 2\cdot 10^{-4}\) from MCS with \(N_{MC} = 10,000\) initial samples. In contrast to crude MCS, LS and SS also predict failure probabilities at speeds close to \(v=83\) m/s, however, they are too small to be predicted by MCS with the considered sample size.

Figure 11b shows that a larger sample size does not enhance the capability of simplified LS, simplified SS, and simplified AS to predict reliably \(p_f\) of bridge 2 in the presence of rail irregularities. The outcomes of LS, SS, and AS diverge strongly from the reference crude MCS results. It can be concluded that LS, where the importance direction \(\mathbf {e}_{\alpha }\) has been estimated without considering random irregularity amplitudes Q and random phase angle \(\varphi _m\), cannot predict \(p_f\) if the track irregularities are the governing source of failure. Likewise, for this type of railway bridges, SS fails to predict \(p_f\) because the acceptance of new samples are disturbed if Q and \(\varphi _m\) are not considered in the Markov Chain Monte Carlo procedure used to generate the conditional samples. This is in contrast to bridge example 1 with one dominating resonance speed, where the simplified versions of LS, SS, and AS (i.e. random irregularity variables are considered only in the evaluation of the limit state function) allow to predict \(p_f\) of bridges with random irregularity profiles.

Subsequently, modifications of SS and AS are proposed aiming at improving their performance for a bridge-train interaction problem whose failure is governed by track irregularities. Subset simulation is modified in this respect that random amplitude Q and random phase angle \(\varphi _m\) are taken into account when determining the acceptance ratio of the Markov Chain Monte Carlo algorithm, which is necessary to generate the conditional samples. This modification does not impair the efficiency of SS because no additional evaluations of the limit state function need to be conducted. To account in AS explicitly for track irregularities, initial samples \(N_{AS}\) of all \(N_r=1008\) random variables (i.e. also including the random variables of the irregularity profiles) are generated. This modification affects only slightly the efficiency of AS because again no additional limit state evaluations are necessary. In AS as applied in bridge problem 1, an initial vector is generated using the seven random variables of the perfect bridge, and the rail irregularities are only considered when evaluating the limit state function. The outcomes show that these modified versions of SS and AS yield predictions of \(p_f\) that are still far-off the reference solution, and are, thus, not reliable.

However, repetitive prediction of \(p_f\) using a small number of initial lines/samples and averaging over these multiple \(p_f\)-predictions improves significantly the accuracy of LS (quadratic interpolation) and modified SS. Figure 12 depicts the mean of \(p_f\) determined by LS applied five times with \(N_{LS}=100\) initial lines each. As observed, the results of LS based on such procedure reflect the global trend of \(p_f\) of bridge-train interaction problem 2, however, at certain speeds the differences between the LS predictions and the outcomes of MCS are still large. In contrast, the average of \(p_f\) as outcome of five modified SS applications with \(N_{SS}=100\) initial samples each also shown in Fig. 12 reveal the accuracy of this modified SS approach.

Fig. 12
figure 12

Probability of failure \(p_f\) based on crude Monte Carlo simulation, line sampling (\(5\times 100\) lines) and modified subset simulation (\(5\times 100\) initial samples). Example bridge 2 with irregular track

4.2 Discussion on the computational efficiency

In LS, the central difference quotient has been used to determine the gradient at the origin in standard normal space, which corresponds to importance direction \(\mathbf {e}_{\alpha }\), based on the \(N_r=7\) independent random variables in the considered example (without the random variables of the track irregularities). Thus, additionally to the computations of the Monte Carlo samples as starting points for each line (i.e. in this study \(N_{LS}=100\) and \(N_{LS}=300\), respectively), the limit state function needs to be evaluated \(2N_r\) times more, with \(N_r\) denoting the total number of random variables. In a first LS approach, where the root \(g(Z)=0\) is found by quadratic interpolation, for each of the \(N_{LS}\) lines the limit state function is evaluated at three points, requiring altogether additional \(3N_{LS}\) limit state function evaluations. Hence, for this LS approach as performed for the assessment of example bridge 1, the limit state function is evaluated in total \(N_{LStot}=3N_{LS}+2N_r\) times to predict probability of failure \(p_f\) for a single train speed v. That is, with \(N_r=7\) independent random variables in the considered example and \(N_{LS}=100\) initial lines, the total number of simulations \(N_{LStot}\) adds up 314. When taking 300 initial lines, \(N_{LStot}\) is 914, which is significantly less than the 10, 000 samples of crude MCS for a \(p_f = 10^{-3}\). Consequently, considering \(p_f\) at a distinct speed v, LS reduces reasonably the number of limit state function evaluations compared to crude MCS. In the second example bridge, the first LS approach repeatedly applied five times with \(N_{LS}=100\) initial lines each, is computationally more efficient than crude MCS. However, at certain train speeds \(p_f\) obtained by averaging the individual probability of failures diverges from the crude MCS outcome because the track irregularities impair the simplified estimation of \(\mathbf {e}_{\alpha }\).

For SS the total number of limit state function evaluations, referred to as \(N_{SStot}\), depends on the actual probability of failure, the number of initial seeds, and the length of the Markov chains used to generate conditional intermediate samples. Since in the present study for the intermediate probability of failure a value of \(p_{interm}=0.1\) has been specified, 10% of \(N_{SS}\) serve as Markov chain seeds \(N_{SSw}\). In the next \((k-1)\) substeps, the limit state function is evaluated \((N_{SS}-N_{SSw})\) times. The iteration is stopped when the actual intermediate probability of failure at the current step is larger than the predefined value of \(p_{interm}=0.1\). Thus, in total, subset simulation comprises \(N_{SS}\) evaluations of the limit state function at the initial MCS step, and \((N_{SS}-N_{SSw})\) evaluations at each of the \((k-1)\) substeps. To predict a \(p_f\) of \(10^{-1}\), the initial sample of \(N_{SS}=100\) without any substeps is sufficiently large. A \(p_f\) of \(10^{-3}\) requires \(N_{SS}=100\) initial samples plus \((N_{SS}-N_{SSw})\) samples at \((k-1)=2\) substeps, i.e. in total \(N_{SStot}=280\) limit state function evaluations. When selecting an initial sample size of \(N_{SS}=300\), the limit state function needs to be evaluated \(N_{SStot}=840\) times to predict a \(p_f\) of \(10^{-3}\) reliably. Repetitive application of modified SS based on \(N_{SS}=5\text {x}100\) initial samples is more efficient than crude MCS to determine \(p_f\) of the second bridge-train interaction problems where track irregularities dominate the structural response amplification. This results in total in \(N_{SStot}=5\text {x}280 = 1400\) limit state function evaluations to determine \(p_f\) in the range of \(10^{-3}\).

The computational efficiency of AS depends on \(p_f\). For the present bridge-train interaction problem 1 considering failure probabilities above \(10^{-3}\) in the speed range of 72 to 84 m/s failure is usually reached at (\(1/\sigma =1\)) or (\(1/\sigma =0.9\)) or (\(1/\sigma =0.8\)). Since five pairs are used to determine \(p_f\), the limit state function is evaluated in total at least \(N_{AStot}=500\) times. The simulation time for one limit state function evaluation was on an average about 5 s but depends on the actual train speed. In the actual study, due to the large computational effort of crude MCS with \(N_{MC}=10,000\) samples, the simulations were carried out on two different machines with different architecture. Crude MCS with \(N_{MC}=10,000\) samples was conducted on the high performance computer cluster LEO3 of the University of Innsbruck, split into 100 packages yielding 100 response spectra each. The computation time for one package was \(t_{MC}\approx 11.3\) h, whereas sequential computing would have lasted 47 days. At the cluster, the packages were solved in parallel. The simulations for LS, SS and AS were conducted on a local machine, i.e. an Apple workstation with 6 core Intel(R) Xeon(R) CPU E5-1650 V2 @ 3.50GHz processor. On an average for one discrete speed, LS with \(N_{LS}=100\) lines took \(t_{LS_{100}}\approx 0.44\) h and LS with \(N_{LS}=300\) lines \(t_{LS_{300}}\approx 1.3\) h. The prediction of the 31 discrete failure probabilities in the critical speed range from \(v=60\) m/s up to \(v=90\) m/s added up on an average to \(t_{totLS_{100}}\approx 13.5\) h (\(N_{LS}=100\)) and to \(t_{totLS_{300}}\approx 40.3\) h (\(N_{LS}=300\) lines), respectively. Subset simulation with \(N_{SS}=100\) initial samples took for one discrete train speed about \(t_{SS_{100}}\approx 0.38\) h, and in total \(t_{totSS_{100}}\approx 12.1\) h for the critical speed range. For the larger initial sample size of \(N_{SS}=300\), the computation time increased to \(t_{SS_{300}}\approx 1.2\) h (one speed) and \(t_{totSS_{300}}\approx 37.2\) h (critical speed range), respectively. Asymptotic sampling with an initial sample number \(N_{AS} = 100\) yielded a minimum computation time of \(t_{AS_{100}}\approx 0.14\) h, and with \(N_{AS}=300\)\(t_{AS_{300}} \approx 0.42\) h for one discrete train speed. The prediction of failure probabilities in the order of \(p_f \le 10^{-3}\) with AS led rapidly to a significant increase of the computational effort.

5 Conclusions

In this paper, applicability and efficiency of line sampling (LS), subset simulation (SS), and asymptotic sampling (AS) for a stochastic-based reliability assessment of railway bridges subjected to high-speed trains were evaluated. The limit state of this problem is governed by the bridge deck acceleration. These stochastic methods were employed to predict failure probabilities of two bridge-train interaction problems with different response characteristics. In example problem 1, structural accelerations leading to the exceedance of the limit state are related to one significant resonance peak, whereas in example problem 2 track irregularities are the primary source of inadmissible large peak bridge acceleration amplifications. Random parameters were defined to capture the essential uncertainties.

Compared to crude Monte Carlo simulation (MCS), in example bridge 1 LS, SS, and AS reduce significantly the number of limit state function evaluations for a reliable prediction of the probability of failure \(p_f\) in the order of \(10^{-3}\). It was shown that LS with a resolution of 300 random lines pointing towards the importance direction delivers a failure probability close to the reference solution obtained by crude MCS based on 10, 000 samples. For bridge 1, performance and accuracy of SS turned out to be sufficient when using 300 initial samples. It was also shown that for this object accuracy and efficiency of AS is similar to LS and SS.

The dimension of the systems with perfectly smooth tracks is low, i.e. in the current study the number of random variables is seven. When taking track irregularities into account, the problem becomes of high dimension with 1008 uncertain parameters involved. This high-dimensionality puts some constraints on the efficient applicability of LS, SS, and AS to dynamic bridge-train interaction. Thus, in a simplified approach, the importance direction in LS and the acceptance ratios of the Metropolis-Hastings algorithm in SS are purely based on the limited number of random variables of the system with smooth tracks, whereas the limit state function is evaluated considering the full set of random variables including the ones of the random irregularity profiles. For example bridge 1, whose peak accelerations are dominated by resonance at a critical speed, this simplification did not impose any limitation to predict the probability of failure reliably by LS, SS, and AS. However, in the second example object 2, where track irregularities govern the acceleration amplification, such simplified approach impairs LS, SS, and AS, and consequently, these methods fail to predict the actual failure probability.

Modification of SS by considering the random variables of the track irregularities in the Markov Chain Monte Carlo procedure improves the accuracy of \(p_f\)-estimations also for example bridge 2. The robustness can be further enhanced by a serial application of LS and SS with a relatively low number of lines and initial samples, respectively, and then, averaging the individual \(p_f\) estimates. Conducting five times LS with 100 initial lines on bridge example 2 allowed to predict qualitatively \(p_f\) with respect to speed v. Modified SS based on 100 initial samples and five reiterations yields also quantitatively the reference \(p_f\) obtained by crude MCS.

From this study it can be concluded that LS, SS, and AS are reliable methods to predict the probability of failure of the bridge-train interaction problem when appropriately applied. The required sophistication of these methods, and thus, their computational efficiency, depends on the response characteristics of the considered bridge. The failure probability of railway bridge objects, where mainly track irregularities amplify the random response, can only be predicted by more robust and less computationally efficient stochastic methods, such as repeated application of modified SS and crude MCS.