The local–global conjecture for scheduling with non-linear cost

  • Published:
Journal of Scheduling Aims and scope Submit manuscript

Abstract

We consider the classical scheduling problem on a single machine, on which we need to schedule sequentially n given jobs. Every job j has a processing time \(p_j\) and a priority weight \(w_j\), and for a given schedule a completion time \(C_j\). In this paper, we consider the problem of minimizing the objective value \(\sum _j w_j C_j^\beta \) for some fixed constant \(\beta >0\). This non-linearity is motivated for example by the learning effect of a machine improving its efficiency over time, or by the speed scaling model. For \(\beta =1\), the well-known Smith’s rule that orders job in the non-increasing order of \(w_j/p_j\) gives the optimum schedule. However, for \(\beta \ne 1\), the complexity status of this problem is open. Among other things, a key issue here is that the ordering between a pair of jobs is not well defined, and might depend on where the jobs lie in the schedule and also on the jobs between them. We investigate this question systematically and substantially generalize the previously known results in this direction. These results lead to interesting new dominance properties among schedules which lead to huge speed up in exact algorithms for the problem. An experimental study evaluates the impact of these properties on the exact algorithm A*.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7
Fig. 8
Fig. 9

Similar content being viewed by others

References

  • Alidaee, B. (1993). Numerical methods for single machine scheduling with non-linear cost functions to minimize total cost. Journal of the Operational Research Society, 44(2), 125–132.

    Article  Google Scholar 

  • Bagga, P., & Karlra, K. (1980). A node elimination procedure for Townsend’s algorithm for solving the single machine quadratic penalty function scheduling problem. Management Science, 26(6), 633–636.

    Article  Google Scholar 

  • Bansal, N., & Pruhs, K. (2010). The geometry of scheduling. In Proceedings of the IEEE 51st Annual Symposium on Foundations of Computer Science (FOCS) (pp. 407–414).

  • Cheung, M., & Shmoys, D. (2011). A primal-dual approximation algorithm for min-sum single-machine scheduling problems. In Proceedings of the 14th International Workshop APPROX and 15th International Workshop RANDOM (pp. 135–146).

  • Croce, F., Tadei, R., Baracco, P., Di Tullio, R. (1993). On minimizing the weighted sum of quadratic completion times on a single machine. In Proceedings of the IEEE International Conference on Robotics and Automation (pp. 816–820).

  • Dürr, C., Jeż, Ł., & Vásquez, O. C. (2014). Scheduling under dynamic speed-scaling for minimizing weighted completion time and energy consumption. Discrete Applied Mathematics, 196, 20–27.

  • Epstein, L., Levin, A., Marchetti-Spaccamela, A., Megow, N., Mestre, J., Skutella, M., & Stougie, L. (2010). Universal sequencing on a single machine. In Proceedings of the 14th International Conference of Integer Programming and Combinatorial Optimization (IPCO) (pp. 230–243).

  • Hart, P. E., Nilsson, N. J., & Raphael, B. (1972). Correction to a formal basis for the heuristic determination of minimum cost paths. ACM SIGART Bulletin, 37, 28–29.

    Article  Google Scholar 

  • Höhn, W., & Jacobs, T. (2012a). An experimental and analytical study of order constraints for single machine scheduling with quadratic cost. In Proceedings of the 14th Workshop on Algorithm Engineering and Experiments (ALENEX’12) (pp. 103–117).

  • Höhn, W., & Jacobs, T. (2012b). Generalized min sum scheduling instance library. http://www.coga.tu-berlin.de/v-menue/projekte/complex_scheduling/generalized_min-sum_scheduling_instance_library/.

  • Höhn, W., & Jacobs, T. (2012c). On the performance of Smith’s rule in single-machine scheduling with nonlinear cost. In Proceedings of the 10th Latin American Theoretical Informatics Symposium (LATIN) (pp. 482–493).

  • Kaindl, H., Kainz, G., & Radda, K. (2001). Asymmetry in search. IEEE Transactions on Systems Man and Cybernetics, 31(5), 791–796.

    Article  Google Scholar 

  • Megow, N., & Verschae, J. (2013). Dual techniques for scheduling on a machine with varying speed. In Proceedings of the 40th International Colloquium on Automata, Languages and Programming (ICALP) (pp. 745–756).

  • Mondal, S., & Sen, A. (2000). An improved precedence rule for single machine sequencing problems with quadratic penalty. European Journal of Operational Research, 125(2), 425–428.

    Article  Google Scholar 

  • Sen, T., Dileepan, P., & Ruparel, B. (1990). Minimizing a generalized quadratic penalty function of job completion times: An improved branch-and-bound approach. Engineering Costs and Production Economics, 18(3), 197–202.

    Article  Google Scholar 

  • Smith, W. E. (1956). Various optimizers for single-stage production. Naval Research Logistics Quarterly, 3(1–2), 59–66.

    Article  Google Scholar 

  • Szwarc, W. (1998). Decomposition in single-machine scheduling. Annals of Operations Research, 83, 271–287.

  • Townsend, W. (1978). The single machine problem with quadratic penalty function of completion times: A branch-and-bound solution. Management Science, 24(5), 530–534.

    Article  Google Scholar 

  • Vásquez, O. C. (2014). For the airplane refueling problem local precedence implies global precedence. Optimization Letters, 9(4), 663–675.

Download references

Acknowledgments

We are grateful to the anonymous referees who spotted errors in previous versions of this paper. This paper was supported by the PHC Van Gogh grant 33669TC, the FONDECYT grant 11140566, the NWO grant 639.022.211 and the ERC consolidator grant 617951.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Christoph Dürr.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Bansal, N., Dürr, C., Thang, N. et al. The local–global conjecture for scheduling with non-linear cost. J Sched 20, 239–254 (2017). https://doi.org/10.1007/s10951-015-0466-5

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10951-015-0466-5

Keywords

Navigation