Abstract
The authors offer the optional versions of mining methods and technological schemes for mining at Udachnaya pipe reserves under the opencast bottom. The rational chamber-and-pillar method has been substantiated, considering the complicated mining-geological and geomechanical condition at the deposit. The economical feasibility of the proposed underground mining variants has been evaluated.
Similar content being viewed by others
References
D. R. Kaplunov, M. V. Ryl’nikova, V. V. Kalmykov, Yu. A. Petrov, and V. A. Suslov, “Combined geotehcnology for mining at Udachnaya diamond-bearing pipe,” Gorn. Prom., No. 4 (2005).
A. A. Eremenko, V. M. Seryakov, and A. P. Filatova, “Estimate of the rock mass stress state in the course of mining the reserves subjacent the open pit bottom at the Udachnaya pipe,” Fiz.-Tekh. Probl. Razrab. Polezn. Iskop., No. 4 (2007).
Guidelines for Estimating Efficiency of Investments [in Russian], Ekonomika, Moscow (2000).
Author information
Authors and Affiliations
Additional information
__________
Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 3, pp. 55–67, May–June, 2008.
Rights and permissions
About this article
Cite this article
Eremenko, A.A., Klishin, V.I., Eremenko, V.A. et al. Feasibility study of a geotechnology for underground mining at Udachnaya kimberlite pipe under the opencast bottom. J Min Sci 44, 271–282 (2008). https://doi.org/10.1007/s10913-008-0017-y
Received:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s10913-008-0017-y