Skip to main content

Advertisement

Log in

The role of temporary accommodation buildings for post-disaster housing reconstruction

  • Policy and Practice
  • Published:
Journal of Housing and the Built Environment Aims and scope Submit manuscript

Abstract

The number of houses damaged or destroyed after disasters is frequently large, and re-housing of homeless people is one of the most important tasks of reconstruction programs. Reconstruction works often last long, and during that time, it is essential to provide victims with the minimum conditions to live with dignity, privacy, and protection. This research intends to demonstrate the crucial role of temporary accommodation buildings to provide spaces where people can live and gradually resume their life until they have a permanent house. The study also aims to identify the main problems of temporary accommodation strategies and to discuss some principles and guidelines in order to reach better design solutions. It is found that temporary accommodation is an issue that goes beyond the simple provision of buildings, since the whole space for temporary settlement is important. Likewise, temporary accommodation is a process that should start before a disaster occurs, as a preventive pre-planning. In spite of being temporary constructions, these housing buildings are one of the most important elements to provide in emergency scenarios, contributing for better recovery and reconstruction actions.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Institutional subscriptions

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6

Similar content being viewed by others

References

  • Alexander, D. (2004). Planning for post-disaster reconstruction. In 2004 international conference and student competition on post-disaster reconstruction “planning for reconstruction” Coventry, UK. April 22–23, 2004. http://www.grif.umontreal.ca/pages/papers2004/Paper%20-%20Alexander%20D.pdf. Accessed June 01, 2011.

  • Arslan, H. (2007). Re-design, re-use and recycle of temporary houses. Building and Environment, 42, 400–406.

    Article  Google Scholar 

  • Arslan, H., & Cosgun, N. (2007). The evaluation of temporary earthquake houses dismantling process in the context of building waste management. In International earthquake symposium. Kocaeli, Turkey.

  • Arslan, H., & Cosgun, N. (2008). Reuse and recycle potentials of the temporary houses after occupancy: Example of Duzce, Turkey. Building and Environment, 43, 702–709.

    Article  Google Scholar 

  • Asefi, M., & Sirus, F. A. (2012). Transformable shelter: Evaluation and new architectural design proposals. Procedia: Social and Behavioral Sciences, 51, 961–966.

    Google Scholar 

  • Barakat, S. (2003). Housing reconstruction after conflict and disaster. London: Overseas Development Institute.

    Google Scholar 

  • Barenstein, J. D. (2006). Housing reconstruction in post-earthquake Gujarat: A comparative analysis. Overseas Development Institute (ODI). Humanitarian Practice Network (HPN).

  • Bedoya, F. G. (2004). Hábitat transitorio y vivienda para emergencias. Tabula Rasa, 2, 145–166.

  • Boen, T., & Pribadi, K. S. (2007). Engineering the non-engineered houses for better earthquake resistance in Indonesia. In Proceedings of the DRH contents meeting-EDMNIED, Kobe, Japan. http://drh.edm.bosai.go.jp/files/6cc5597e09050a9b482d9f257c5f256ec28f6e50/7_PT8_P.pdf.

  • Bologna, R. (2006). Strategic planning of emergency areas for transitional settlement. In 2006 international conference and student competition on post-disaster reconstruction “meeting stakeholder interests” Florence, Italy. May 17–19, 2006. http://www.grif.umontreal.ca/pages/BOLOGNA_Roberto.pdf. Accessed October 04, 2012.

  • Caia, G., Ventimiglia, F., & Maass, A. (2010). Container vs. dacha: The psychological effects of temporary housing characteristics on earthquake survivors. Journal of Environmental Psychology, 30, 60–66.

    Article  Google Scholar 

  • D’Urzo, S. (2011). News from the teardrop island. In M. J. Aquilino (Ed.), Beyond shelter: Architecture for crisis (pp. 12–23). London: Thames & Hudson.

    Google Scholar 

  • Davidson, C. H., Johnson, C., Lizarralde, G., Dikmen, N., & Sliwinski, A. (2007). Truths and myths about community participation in post-disaster housing projects. Habitat International, 31, 100–115.

  • Davidson, C., Lizarralde, G., & Johnson, C. (2008). Myths and realities of prefabrication for post-disaster reconstruction. In 4th international i-Rec conference 2008—Building resilience: Achieving effective post-disaster reconstruction. Christchurch, New Zealand.

  • Dikmen, N., Elias-Ozkan, S. T., & Davidson, C. (2012). Comparison of post-disaster housing procurement methods in rural areas of Turkey. Open House International, 37, 28–39.

    Google Scholar 

  • El-Masri, S., & Kellett, P. (2001). Post-war reconstruction. Participatory approaches to rebuilding the damaged villages of Leabanon: A case study of al-Burjain. Habitat International, 25, 535–557. 

    Article  Google Scholar 

  • Félix, D., Branco, J. M., & Feio, A. (2013a). Temporary housing after disasters: A state of the art survey. Habitat International, 40, 136–141.

  • Félix, D.,  Branco, J. M., & Feio, A. (2013b). Guidelines to improve sustainability and cultural integration of temporary housing units.  Proceedings of 6th international i-Rec conference. May 26-30, 2013. Ascona, Switzerland.

  • Félix, D., Feio, A.,  Branco, J. M., & Machado, J. S. (2013c). The role of spontaneous construction for post-disaster housing. In Cruz (Ed.), Structures and architecture: Concepts, applications and challenges (pp. 937–944). London: Taylor & Francis.

  • Garofalo, L., & Hill, D. (2008). Prefabricated recovery: Post-disaster housing component production and delivery. Without a hitch—new directions in prefabricated architecture (pp. 64–71). Massachusetts.

  • Gulahane, K., & Gokhale, V. A. (2012). Design criteria for temporary shelters for disaster mitigation in India. In G. Lizarralde, R. Jigyasu, R. Vasavada, S. Havelka & J. Duyne Barenstein (Eds.), Participatory design and appropriate technology for disaster reconstruction. Conference proceedings. 2010 international i-Rec conference.

  • Hadafi, F., & Fallahi, A. (2010). Temporary housing respond to disasters in developing countries—case study: Iran-Ardabil and Lorestan Province earthquakes. World Academy of Science, Engineering and Technology, 66, 1536–1542.

    Google Scholar 

  • Hamilton, N. (2012). Post-disaster shelter: A studio-based response to emergency shelter in natural disaster zones. In Sustainable futures: Architecture and urbanism in the global south, Kampala, Uganda. 27–30 June 2012.

  • Harris, V. L. (2011). The architecture of risk. In M. J. Aquilino (Ed.), Beyond shelter: Architecture for crisis (pp. 12–23). London: Thames & Hudson.

    Google Scholar 

  • Johnson, C. (2002). What’s the big deal about temporary housing? Planning considerations for temporary accommodation after disasters: Example of the 1999 Turkish earthquakes. In 2002 TIEMS disaster management conference. Waterloo.

  • Johnson, C. (2007a). Strategic planning for post-disaster temporary housing. Disasters, 31, 435–458.

    Article  Google Scholar 

  • Johnson, C. (2007b). Impacts of prefabricated temporary housing after disasters: 1999 earthquakes in Turkey. Habitat International, 31, 36–52.

    Article  Google Scholar 

  • Johnson, C. (2008). Strategies for the reuse of temporary housing. In I. A. Ruby (Ed.), Urban transformation (pp. 323–331). Berlim: Ruby Press.

    Google Scholar 

  • Johnson, C., Lizarralde, G., & Davidson, C. (2010). A systems view of temporary housing projects in post-disaster reconstruction. Construction Management and Economics, 24(4), 367–378.

    Article  Google Scholar 

  • Kellett, P., & Tipple, A. G. (2000). The home as workplace: A study of income-generating activities within the domestic setting. Environment and Urbanization, 12, 203–214.

    Article  Google Scholar 

  • Kronenburg, R. H. (2009). Mobile and flexible architecture: Solutions for shelter and rebuilding in post-flood disaster situations. In blue in architecture 09_proceedings_IUAV digital library.

  • Lizarralde, G., & Bouraoui, D. (2012). User’s participation and satisfaction in post-disaster reconstruction. In G. Lizarralde, R. Jigyasu, R. Vasavada, S. Havelka & J. Duyne Barenstein (Eds.), Participatory design and appropriate technology for disaster reconstruction. Conference proceedings. 2010 international i-Rec conference. Ahmedabad, India. Montreal: Groupe de recherche IF, GRIF, Université de Montréal.

  • Lizarralde, G., & Davidson, C. (2006). Learning from the poor. In D. Alexander (Ed.), Post-disaster reconstruction: Meeting stakeholders’ interest. Florença: Università degli studdi.

    Google Scholar 

  • Quarantelli, E. L. (1995). Patterns of sheltering and housing in US disasters. Disaster Prevention and Management, 4, 43–53.

    Article  Google Scholar 

  • Renton, A., & Palmer, R. (2005). A place to stay, a place to live. Oxfam Briefing Note.

  • Saltzman, A., Speziale, C., Cesal, E., Arnold, H., & Kernizan, S. (2010). Transitional to what? http://openarchitecturenetwork.org/projects/transitional_to_what. Accessed March 17, 2012.

  • Sener, S. M., & Altum, M. C. (2009). Design of a post disaster temporary shelter unit. A|Z ITU Journal of the Faculty of Architecture, 6, 58–74.

    Google Scholar 

  • Shaw, R. (2009). Indigenous knowledge: Disaster risk reduction, policy note. http://www.unisdr.org/we/inform/publications/8853. Accessed January 7, 2012.

  • Shelter Centre (2012). Transitional shelter guidelines. www.sheltercentre.org/library.

  • Twigg, J. (2006). Technology, post-disaster housing reconstruction and livelihood security. In B. H. Centre (Ed.), Disaster studies working paper no. 15.

  • UNDRO. (1982). Shelter after disaster: Guidelines for assistance. New York: United Nations.

    Google Scholar 

  • Weia, L., Lib, W., Lia, K., Liu, H., & Cheng, L. (2012). Decision support for urban shelter locations based on covering model. Procedia Engineering, 43, 59–64.

    Article  Google Scholar 

Download references

Acknowledgments

The first author gratefully acknowledges the financial support of Fundação para a Ciência e a Tecnologia, FCT, through grant SFRH/BD/73853/2010.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Daniel Félix.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Félix, D., Monteiro, D., Branco, J.M. et al. The role of temporary accommodation buildings for post-disaster housing reconstruction. J Hous and the Built Environ 30, 683–699 (2015). https://doi.org/10.1007/s10901-014-9431-4

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10901-014-9431-4

Keywords

Navigation