Skip to main content
Log in

Scheduling dedicated jobs with variative processing times

  • Published:
Journal of Combinatorial Optimization Aims and scope Submit manuscript

Abstract

We consider the following optimization problem. There is a set of \(n\) dedicated jobs that are to be processed on \(m\) parallel machines. The job set is partitioned into subsets and jobs of each subset have a common due date. Processing times of jobs are interconnected and they are the subject of the decision making. The goal is to choose a processing time for each job in a feasible way and to construct a schedule that minimizes the maximum lateness. We show that the problem is NP-hard even if \(m=1\) and that it is NP-hard in the strong sense if \(m\) is a variable. We prove that there is no approximate polynomial algorithm with guaranteed approximation ratio less than 2. We propose an integer linear formulation for the problem and perform experiments. The experiments show that the solutions obtained with CPLEX within the limit of 5 min are on average about 5 % from the optimum value for instances with up to 150 jobs, 16 subsets and 11 machines. Most instances were solved to optimality and the average CPLEX running time was 32 s for these instances.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4

Similar content being viewed by others

References

  • Barketau MS, Pesch E, Shafransky Y (2012) Minimizing maximal weight of subsets in a bipartite graph. 25th European Conference on Operational Research, 8–11 July 2012, Vilnius, Lithuania, p. 88

  • Boysen N, Fliedner M (2010) Determining crane areas in intermodal transshipment yards: the yard partition problem. Eur J Oper Res 204:336–342

    Article  MATH  Google Scholar 

  • Boysen N, Fliedner M, Jaehn F, Pesch E (2013) Container processing in railway yards. Transp Sci 47:312–329

    Article  Google Scholar 

  • Boysen N, Jaehn F, Pesch E (2011) Scheduling freight trains in rail-rail transshipment yards. Transp Sci 45:199–211

    Article  Google Scholar 

  • Briskorn D, Angeloudis P, Bell M (2011) Scheduling co-operating stacking cranes with predetermined container sequences. Working paper

  • Burkard RE, Dell’Amico M, Martello S (2009) Assignment problems. SIAM, Philadelphia

    Book  MATH  Google Scholar 

  • Papadimitriou C, Steiglitz K (1982) Combinatorial optimization: algorithms and complexity. Prentice-Hall, Englewood Cliffs

    MATH  Google Scholar 

  • Tanaev VS, Gordon VS, Shafransky YM (1994) Scheduling theory. Kluwer Academic Publishers, Single-Stage Systems

    Book  Google Scholar 

Download references

Acknowledgments

E. Pesch has been supported by the German Science Foundation (DFG) through the Grant “Optimierung der Containerabfertigung in Umschlagbahnhöfen” (PE 514/16-1,2), as well as the Grant “Scheduling mechanisms for rail mounted gantries with regard to crane interdependencies” (PE 514/22-1).

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Erwin Pesch.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Barketau, M., Pesch, E. & Shafransky, Y. Scheduling dedicated jobs with variative processing times. J Comb Optim 31, 774–785 (2016). https://doi.org/10.1007/s10878-014-9787-0

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10878-014-9787-0

Keywords

Navigation